Shoring_Work_Method_Statement
Shoring_Work_Method_Statement
1. PURPOSE
This method statement outlines the procedures for shoring work to ensure stability and safety
2. SCOPE
Applicable to all shoring activities at the project site, including installation, maintenance,
and removal.
3. REFERENCES
4. RESPONSIBILITIES
- Excavators
6.1 Preparation
- Mark the excavation area and secure the perimeter with barricades.
6.4 Dismantling
stabilized.
- In case of collapse or instability, evacuate the area immediately and inform the site
manager.
9. APPROVALS
This method statement must be reviewed and approved by the Project Manager and Safety Officer
before implementation.