Detailed_Shoring_Work_Method_Statement
Detailed_Shoring_Work_Method_Statement
1. PURPOSE
The purpose of this method statement is to establish guidelines and procedures for the safe and
efficient execution of shoring work during excavation activities. This document ensures compliance
2. SCOPE
This method statement applies to all shoring activities required to stabilize excavation perimeters,
prevent soil collapse, and ensure worker safety. This includes both temporary and permanent
shoring installations.
3. RESPONSIBILITIES
- **Site Engineer**: Ensure shoring work adheres to approved plans and specifications.
- **Safety Officer**: Conduct regular site inspections, enforce safety measures, and oversee training.
- **Workers**: Follow safety guidelines and report any issues or hazards to supervisors.
5. DETAILED METHODOLOGY
5.1 Preparation
- Conduct a thorough site survey to assess ground conditions and identify potential hazards.
- Obtain approvals for excavation and shoring plans from relevant authorities.
- Mark excavation boundaries clearly and install safety signage around the work area.
5.2 Installation of Shoring
- Monitor the shoring structure daily for signs of movement, deformation, or instability.
5.4 Dismantling
- Ensure that the excavation area is stable or adequately backfilled before complete removal.
6. SAFETY CONSIDERATIONS
- Ensure workers are trained in shoring techniques and hazard identification.
7. APPENDICES
- Appendix A: Site Layout and Excavation Plan.