GROUND FLOOR HVAC VENTILATION-Model
GROUND FLOOR HVAC VENTILATION-Model
PARCEL 4.08
DELIVERY SECONDARY
ACCESS ENTRANCE
electrical
cabinet
EMPLOYE
TOILET
1.2 MQ
MEN WOMEN 407 408
TOILET TOILET
PART A PART B
1.6 MQ 3.30 MQ 9 MQ BEVERAGE AREA
SINK WITCH 12 MQ
TWO BOULS REFRIGERATOR SERVICE
VERTICAL COUNTER
REFRIGERATOR COUNTER
4 DOORS
SELF CHECKOUT SELF CHECKOUT
BUILT-IN FLOUR OIL TANK
HOPPER PIZZA TRAY
DUSTBIN RACKS
GASTRONORM MICROWAVE
SALAMANDER
SOFT DRINK
FRIDGE
FLOUR CART ICE MAKER
PLATFORM
SMOKE EXTRACTOR HOOD
SECOND
ENTRANCE
MAIN
ENTRANCE
A - No Objection.
B+ - Accepted with Comments, resubmission not required. LEGEND:
B - Objection, address all comments, resubmission is required. MSAD : MAIN SUPPLY AIR DUCT
MRAD : MAIN RETURN AIR DUCT
C - Not Accepted to be resubmitted.
SLBG : SUPPLY LINEAR BAR GRILL
-Provide the technical and sectional details for ecology unit RLBG : RETURN LINEAR BAR GRILL
Tenant is to comply with KAFD requirements and SLSD : SUPPLY LINEAR SLOT DIFFUSER
RLSD : RETURN LINEAR SLOT DIFFUSER
guidelines. SCD : SUPPLY CEILING DIFFUSER
The comments are made without reference to the RCD : RETURN CEILING DIFFUSER
contract or scope of work between Tenant and FLEX. : FLEXIBLE DUCT
V.D/F.D : VOLUME/FIRE DAMPER
Landlord or any other party. SD : SPLITTER DAMPER
Any Comment is made in reference to the TH : THERMOSTAT TH
and accuracy of information and full compliance BMO : BELL MOUTH OPENING
VAV : VARIABLE AIR VOLUME
with relevant codes irrespective of any comment
made by the reviewer.