3hasa13 Hasa 07 Agc ST Mes 00004 Msrs For Sika Grouting
3hasa13 Hasa 07 Agc ST Mes 00004 Msrs For Sika Grouting
Compliance Statement:
MohamedGobra Mohamed
Gobran
n
13-08-2024 Name, Signature & Date 13-08-2024
Name, Signature & Date
Name, Signature & Date
REVIEWER’S COMMENTS
LDC(Str/MEP) A☐ B☐ C☐ D☐ ARCHITECTS A☐ B☐ C☐ D☐
A−Approved
B−Approved With A−Approved
comments C−Revise and B−Approved With
resubmit. comments C−Revise and
D−Rejected resubmit.
D−Rejected
METHOD STATEMENT
Saudi Entertainment
Project Location Al ahsa Client :
Ventures (SEVEN)
Cost Consultant: Turner & Townsend Arabia Contractor: ANSAB GENERAL CONTRACTING
STAT
REV DATE PURPOSE OF ISSUE
US
07-08-2024
A FA First submission for approval.
Status
Code:
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
Table Of Contents
1: Scope:............................................................................................................................................................3
2: References.....................................................................................................................................................3
3: Health & Safety Hazards...............................................................................................................................3
4: Definitions:.....................................................................................................................................................3
5: Personals Responsibilities:............................................................................................................................3
5.1 : Project Manager........................................................................................................................................3
5.2 : Construction Manager:..............................................................................................................................3
5.3 : Health & Safety Manager:.........................................................................................................................4
5.4 : Architect/Design Engineer:........................................................................................................................4
5.5 : Civil/Structural Engineer:...........................................................................................................................4
5.6 : Project Engineer:........................................................................................................................................4
5.7 : Quality Control/Quality Assurance Manager:..........................................................................................4
5.8 : Safety Officer:............................................................................................................................................4
6: Procedure & Method To Be Applied...........................................................................................................5
6.1 : Required Material & Proper Storage for Grout.......................................................................................5
6.2 : Surface Preparation...................................................................................................................................5
6.3 : Mixing.........................................................................................................................................................5
6.4 : Application..................................................................................................................................................5
6.5 : Quality Assurance and Safety Measures:.................................................................................................5
Quality Assurance:.............................................................................................................................................5
Safety Measures................................................................................................................................................6
7: Manpower Requirement..............................................................................................................................6
8: Material Requirement...................................................................................................................................6
9: Test Reports for Material Sika Grout:.........................................................................................................6
10: Health & Safety Provisions:........................................................................................................................6
11: QA Approval & Quality Requirements.......................................................................................................8
QA Approval.....................................................................................................................................................8
Quality Requirements........................................................................................................................................8
12: Record to be Produced...............................................................................................................................8
13: Distribution..................................................................................................................................................9
14: Site Safety Approval Requirements............................................................................................................9
15: Risk Assessments and Control Measures..................................................................................................9
16: Environmental Aspect, Impacts & Control Measures..............................................................................9
17: List of Hazardous Material To Be used....................................................................................................10
17.1 : Sika Grout...............................................................................................................................................10
Main Components:........................................................................................................................10
Hazards..........................................................................................................................................10
Storage Requirements:..................................................................................................................10
17.2 : Water (if mixed with Sika Grout ).........................................................................................................10
Hazards..........................................................................................................................................10
17.3 : Cleaning Agents (if applicable)..............................................................................................................10
Types:............................................................................................................................................10
Hazards..........................................................................................................................................10
17.4 : Additional Admixtures (if any used).....................................................................................................10
Description....................................................................................................................................10
Hazards..........................................................................................................................................10
17.5 : Sealants or Protective Coatings (if applied postgrouting)...................................................................11
Types:............................................................................................................................................11
Hazards..........................................................................................................................................11
17.6 : Other Possible Additives........................................................................................................................11
Expansive Agents (if used):.........................................................................................................11
General Considerations:..................................................................................................................................11
MSDS (Material Safety Data Sheets):.........................................................................................11
1
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
18: List of Hazardous Wastage To Be Generated..........................................................................................11
18.1 : Residual Sika Grout Mixture.................................................................................................................11
Description.....................................................................................................................................11
Hazards..........................................................................................................................................11
18.2 : Packaging Materials...............................................................................................................................11
Description.....................................................................................................................................11
Hazards..........................................................................................................................................11
18.3 : Cleaning Agents and Wastewater.........................................................................................................12
Description.....................................................................................................................................12
Hazards..........................................................................................................................................12
18.4 : Used Personal Protective Equipment (PPE)........................................................................................12
Description.....................................................................................................................................12
Hazards..........................................................................................................................................12
18.5 : Spill Residues..........................................................................................................................................12
Description.....................................................................................................................................12
Hazards..........................................................................................................................................12
18.6 : Hardened Grout Waste.........................................................................................................................12
Description.....................................................................................................................................12
Hazards..........................................................................................................................................12
18.7 : Contaminated Soil or Materials............................................................................................................13
Description.....................................................................................................................................13
Hazards..........................................................................................................................................13
19: Permits:......................................................................................................................................................13
20: Attachments..............................................................................................................................................13
2
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
1: Scope:
The scope of work for ansab Contracting in the Seven Fences Project includes the
preparation and construction of a site office, fulfilling the architectural, mechanical, and civil
requirements as outlined in the contract with SEVEN. This scope is to be executed in strict
compliance with the project’s quality standards, ensuring that all work is completed safely,
on time, and within the stipulated budget.
2: References:
1. Contract
2. Shop Drawings
3. Material Submittal
4. Approved Sample
5. Material Inspection Request
6. Technical Data Sheet
7. Lab Test Reports
8. Foundation Detail ( Shop Drawing & MSRS)
9. Survey Report Approval Of Foundation
10. Inspection Testing Plan (ITPs)
4: Definitions:
Sika Grout is a high-performance, non-shrink, cementitious grout designed for precision grouting
applications. It offers excellent flowability and high early strength, ensuring stability and durability for
structural components. Ideal for base plate grouting, anchoring, and various other construction uses.
5: Personals Responsibilities:
In a construction project involving Sika Grout Application, a well-defined project organization with
key personnel and their responsibilities is crucial for the successful execution of the work. The
following are key personnel and their respective responsibilities in the context of Sika Grout
Application: (Ansab General Contracting Project Organization Chart is attached)
5.1 : Project Manager:
Responsibilities:
Overall project oversight.
Budgeting and cost control for Sika Grout Application activities.
Coordination with other project stakeholders.
Ensuring adherence to project timeline.
Quality control and assurance.
3
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
4
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
Concrete surfaces should be clean, rough, sound, and free from oil, grease, cement laitance, and
all loosely adhering particles.
Absorbent surfaces should be saturated thoroughly with clean water.
Galvanized anchor bolts should be free from scale, rust, oil, and grease.
6.3 : Mixing:
Begin by adding 3.25 to 3.5 liters of water per 25 kg bag into a clean mixing vessel to achieve the
desired consistency.
Slowly introduce the Sika Grout powder into the water.
The grout is optimally mixed using a forced action mixer for 2 to 3 minutes until the mixture is
free of lumps.
Alternatively, a slow-speed drill with a maximum speed of 500 rpm can be used.
The recommended water temperature for mixing Sika Grout should ideally be between 15°C and
25°C (59°F to 77°F)
6.4 : Application:
5
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
Safety Measures:
Follow all safety protocols and provide necessary PPE (Personal Protective Equipment) to all
workers.
Conduct regular safety meetings and site inspections to ensure a safe working environment.
7: Manpower Requirement:
Construction Manager
Surveyor
Civil Engineer
Supervisor
Foreman
Mason
Mason Helper
Carpenters
Mixer Machine operator
Third-Party For Testing
8: Material Requirement:
Sika Grout
Clean, Potable water
Formwork materials
Curing compound (if applicable)
6
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
3. Working at Heights: Fall Protection Systems: Install and use fall arrest systems,
guardrails, safety nets, and other fall protection measures in all areas where workers are
exposed to height risks. Scaffolding and Platforms: Ensure that all scaffolding and working
platforms are stable, properly erected, and inspected regularly.
4. Lifting Operations:
Crane Safety: Only qualified personnel should operate cranes, and all lifting operations
should be supervised by a competent person.
Rigging Safety: Ensure that all rigging equipment is in good condition and that the load is
properly secured and balanced before lifting.
Communication: Use clear and agreed upon signals for communication between crane
operators and riggers.
5. Welding and Cutting Operations
Fire Prevention: Implement fire prevention measures such as having fire extinguishers on
hand, and ensuring that flammable materials are removed from the welding area.
Ventilation: Provide adequate ventilation to remove fumes and gases produced during
welding or cutting.
Welding Screens: Use welding screens to protect other workers from arc flash and to
contain sparks.
6. Hazardous Materials
Handling and Storage: Store hazardous materials like gases, solvents, and paints in
designated areas with proper labeling. Ensure safe handling procedures are in place.
MSDS (Material Safety Data Sheets): Keep MSDS accessible for all hazardous materials
used onsite.
7. Emergency Preparedness
First Aid: Ensure that first aid kits are readily available and that there are trained first
aiders onsite.
Emergency Evacuation Plan: Develop and communicate an emergency evacuation plan
that includes routes and assembly points.
Rescue Plans: Have a rescue plan in place for workers who may be incapacitated at height
or in confined spaces.
Implementing these safety provisions helps mitigate risks and ensures a safer working
environment during steel erection activities.
7
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
Quality Requirements:
1) Ensure that the substrate has been properly prepared, cleaned, and pre-wetted as
described in the method statement.
2) Measure and record ambient temperature, substrate temperature, and relative
humidity. Ensure they are within the recommended range for application.
3) Accurately measure the amount of water to be used for mixing. Use a calibrated
measuring jug or scale.
4) Ensure that the grout is mixed for the correct duration (approximately 3 minutes) to
achieve a homogeneous consistency.
5) Perform a flow test (ASTM C1437) or similar to verify the consistency of the mixed
grout. Adjust water content within the recommended limits if necessary.
6) Ensure formwork is secure and watertight to prevent grout leakage.
7) Apply grout continuously to avoid cold joints and ensure a consistent pour.
8) Check for proper vibration or tapping to release entrapped air, but avoid over-
vibrating, which can lead to segregation.
9) Inspect the grout surface for uniformity and absence of voids or cracks. Trowel as
necessary for desired finish.
10) Monitor and record the initial set time to ensure it aligns with the product
specifications.
8
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
11) Curing Duration Records log the start and end times of the curing period, ensuring
compliance with recommended durations.
12) Compressive Strength Test Records maintain records of sample collection, curing
conditions, and compressive strength test results at specified intervals (1 day, 7 days, 28
days).
13) Shrinkage Monitoring Records document observations for any signs of shrinkage or
cracking during the curing period.
14) Daily Activity Logs record daily activities related to grouting, including the number
of batches mixed, application progress, and environmental conditions.
15) Observations and Issues note any deviations from the method statement,
observations of defects, and actions taken to address issues.
16) Non-Conforming Material Reports document instances of non-conforming material,
including batch numbers, nature of the issue, and corrective actions taken.
17) Rectification Logs record details of any rectification work performed, including
methods used and results achieved.
18) Final Inspection and Approval Records
Visual Inspection Reports: Conduct and document final inspections of the grouted
area, noting any defects or inconsistencies.
Approval Records: Obtain and log approvals from quality control supervisors or
project engineers before proceeding to subsequent project phases.
13: Distribution :
As per Site Requirements
9
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
10
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
General Considerations:
MSDS (Material Safety Data Sheets): Attach MSDS for each hazardous material listed,
providing detailed safety, handling, and emergency information.
Handling Instructions: Include proper methods for handling each material safely,
particularly during mixing, application, and cleanup.
Disposal Procedures: Outline how to safely dispose of each material or any waste
containing these materials, ensuring compliance with environmental regulations.
11
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
Dust and Debris: Residual dust from bags or containers can become airborne,
causing respiratory hazards.
Disposal:
Should be collected and disposed of as hazardous waste if contaminated. Clean
packaging may be recycled if permitted.
12
Method Statement / Risk Assessment
Sika Grout Application
Rev: B Date of Issue 13-08-2024
19: Permits:
General Work Permit
Shift Permit (As Per Requirement)
20: Attachments
Organization Chart
Competency of those involved.
Equipment Register
ITP Plan and Checklist
13
Risk Assessment Document Ref 3HASA13-HASA-07-AGC-ST-ME S-0004
Section I -Enter general information about the site and job task.
Section II - Determine whether any of these operations apply to the job task to be performed. Make note of any special training, permit, certification, and risk
assessment requirements.
Section III - Identify any human/organizational factors that could impact the ability to perform the work safely.
1. Break the job down into steps - Be as specific as possible. Write each job step in a new row of column A (Activity/Step). It’s a good idea to leave an
extra row between steps in case you need them later. Add additional rows to the table as needed, or if completing the JSA on paper, print
additional copies of the sheet to accommodate all job steps.
2. Determine the hazards associated with each job step and write them in column B (Hazards). Use the examples of hazards provided below to
trigger your thinking about different types of hazards and energy sources.
3. List any control measures that will be taken to ensure that step is done safely in column C (Control Measures). Use the control measure examples
and hierarchy provided to trigger your thinking about different types of controls and their effectiveness at reducing risk. Controls toward the top
of the table tend to be more effective at minimizing the severity and/or likelihood of an event than the controls toward the bottom of the table. If
this job involves a Life Crucial Operation, continue to step 4. Otherwise, repeat steps 2-3 for each of the job steps identified, then proceed to step
8.
4. Considering the hazards involved and the control measures that will be in place, determine the worst credible severity of an incident that could
result from this job step. Use the severity table provided. Write the severity number in column D (Severity).
5. Considering the hazards involved and the control measures that will be in place, determine the likelihood that an incident will result from this job
step. Use the likelihood table provided. Write the likelihood number in column E (Likelihood).
6. Multiply the severity number by the likelihood number and enter the product in column F (Risk).
7. Consider the risk rating against the thresholds provided in the Overall Risk Ratings.
i. Very low and low risk ratings of 1-3. This level is generally considered acceptable provided that all control measures are applied.
ii. Medium risk ratings of 4-6. Medium risk requires a planned approach to control the hazard and applies additional controls if required.
Action taken must be documented on the risk assessment form.
iii. High and Very High-Risk ratings of 8-24. For all high and very high risk, Column G (Additional control measures) must be implemented to
further reduce the risk to a medium or low level. Such activities shall not be proceeded until applying additional control measures. The
Construction Director/Manager or facility Manager must personally review the activities with a High or Very High residual risk score and approve
additional control measures by signing off the JSA.
8. Repeat steps 2-7 for each of the job steps identified.
Section IV - Provide the name, company, and title of those who prepared and reviewed/approved this form in the signature box provided. The Construction
Director/Manager or facility Manager must review and approve the additional control measures that have a High or Very High-Risk rating before proceeding
the task. Additional space is also provided for crew members to sign the JSA if desired.
Reference Table in completing Section III – Job Safety Analysis (Column B – Hazard)
Biological & Environmental Electrical Chemical Gravity/Height Mechanical & Motion
Altitude Arc Flash Air Emissions Equipment Being Thrown
Animal Bite/Sting Buried Chemical Products Tipping/Collapsing Off/Under Equipment
Blood-Borne Pathogens Utilities Carcinogenic Excavation/Trench Disintegration of
Contaminated Damage to Leads/Cables Combustible/Flammable Falling Objects Moving Components
Food/Water Insect- Damage to Switches Explosive Floor Openings/Edges Driving/Vehicle
Borne Disease Pests Energized Toxic Grating Removed Traffic
Poisonous Plants Circuits/Conductors Corrosive Inadequate Support Ejection of Workpiece/Debris
Precipitation Inadvertent Energization Reactive Lack of Access Entanglement
Temperature/Humidit Lack of Isolation/Grounding Client/Process Ladders/Stairs Suspended Friction
y Unsanitary Missing/Damaged Insulation Chemicals Lack of Load Unstable/Insecure Movement/Shifting
Conditions Weather Overhead Lines Containment Materials Work Moving Parts
Wind/Turbulence Overload of Circuits Leakage/Spills Above/Below Others Work Pinch/Crush Points
Pressure Stored Energy Material Incompatibility at Height/Fall Hazards Projectiles
Abrasive Blasting (Batteries/Capacitors) Produced/Disturbed by Work Walking/Working Surface Rotating Equipment
Compressed Gases Water Near Electrical Asbestos Slippery Sharp Edges, Corners, or Points
High Pressure Fluid Conductors Lead Uneven Shearing
Pressure Testing Work Environment Silica Obstructed Stored Energy
Pressure Washing/Blasting Cluttered Welding Fumes Steep (Springs/Accumulator
Radiation Confined Dust Moving/Swaying/Pitching s) Striking
Intense Light Space Water Discharges Insufficient/Unstable Trapped Between Equipment
Lasers Damaged Tools/Equipment Wastes Generated Ergonomic and Fixed Structures
Microwaves Entrapment Hazardous Awkward Unexpected/Uncontrolled
Naturally Occurring Erosion Non-Hazardous Postures/Movement Movement
Radioactivity Hazardous Atmosphere Sound Excessive Force/ Exertion
Radioactive Material Oxygen Rich/Deficient Continuous Heavy/Awkward Load
X-Rays Contaminants Noise Repetitive Motion
Ignition Sources Intermittent Same Position
Inadequate Noise Extreme Vibration
Ventilation Poor Noise Impact
Lighting/Glare Noise
Restricted Access/Egress
Runoff
Reference Table in completing Section III – Job Safety Analysis (Column C – Control Measure)
Most Effective Controls Examples
Elimination Make connections at ground level before erecting Remove a dangerous machine from
(Remove the hazard service a structure to eliminate work at height Provide power outlets to avoid trailing
altogether) cords
Substitution Use latex rather than oil-based paints
(Replace the Reduce energy, such as speed, force, amperage, pressure, and temperature
material/process with a less Use water-based detergents instead of organic solvents
hazardous one)
Engineering/Isolation Ventilation Isolate hazardous energy sources
(Design effective control Machine guarding Interlocks Secondary containment
Barriers
measures to protect people Enclosures Platforms and guardrails
Circuit breakers Exclusion zones Improve lighting
and
the environment)
Warning Signs Horns Labels
High visibility paint
(Alert people to the hazards) Backup alarms Beepers Tags
Administrative Work rotation to minimize exposure
(Provide training, Inspect safety equipment Training and supervision
procedures, etc.) Good housekeeping practices
PPE Safety glasses Fall harness and lanyards Respiratory protection
Least Effective (Personal protective Hearing protection Gloves High visibility vests
equipment)
Critical - 6 6 12 18 24
Minor - 1 1 2 3 4
Section III – Job Safety Analysis Risk Assessment (Post Control Measures)
(A) (B) (C) (D) (E) (F) (G) (H) (I) (J)
Activity/Step Hazards Control Measures Severity Likelihood Risk Additional Control measures Severity Likelihood Risk
Ensure all procedural requirements
are fulfilled.
Conduct pre-task briefing and brief
crew on scope of work, approved
plans, requirements, potential
emergencies, do’s and don’ts,
during advent of an emergency,
emergency contacts, hazards Assign trained banksman with
1: Work Preparation associated with the activities and motorized equipment and at
control measures. intersections and blind spots.
Preparation of tools, Traffic Rules Violations
Site Induction for all crew Banksman should be in high visible
Slip, Trip & Falls
equipment and manpower members including operators and jacket/vest
Worse Weather Condition 4 2 8 3 1 3
mobilization / demobilization, drivers is mandatory. Conduct daily TBT Training
Traffic accidents
control of equipment Only qualified and TP certified Post speed limits as per project
Emergency Situations
movement over the course of drivers be allowed to operate rules and ensure strict
activity equipment / Vehicles compliance.
Proper Inspection of all Housekeeping: Ensure that site
equipment/vehicles. area is kept clean at all times.
Exit route and safe area to be
discussed in PTB
All operatives shall be inducted
and trained.
Ensure that workers are wearing
half mask face cover
Secure applicable work permits
before starting activity.
Conduct pre-task briefing.
Use Proper Manual
Back Injury Handling Techniques.
Ensure that operatives are Conduct continuous Inspections
Musko skeletal Disorders
2: Material Handling trained in safe manual handling. of worksites
Fatigues
Ensure that all workers are using 3 2 6 Ensure that all workers are using 2 1 2
Pinch Points
proper PPEs including Dust Masks. PPEs
Respiratory disorders
Ensure proper access to job area. Keep site access free of obstructions
Slips, trips & falls
Ensure proper supervision Conduct daily TBTs.
by competent persons
at all times.
Identify and address pinch
point hazards.
Make sure to barricade the area
Incompetent ELCB must be installed in
3: Using Portable Power Tools and place a safety sign to avoid 3 3 9 2 3 6
Exposed live electrical Only trained and competent Designated supervisor to ensure
wiring and undetected workers permitted to use the safety compliance.
live cables in the walls power tools. Specific trainings for all involved
or floors. Competent electrician shall inspect parties
User exposed to power tools prior to start activity. Conduct Pre-Task Briefings prior
prolonged periods of Ensure electric cable are properly starting job to brief workers on job
high noise levels. Time connected and insulated. steps, associated hazards &
delays, Property Ensure availability of suitable fire control measures.
damage, minor to extinguishers on site along with
serious injuries with fire blankets.
the possibility of fatal Make sure competent fire watch is
injury present on site at all time during
Improper cable or poor hot work activity.
condition of power Proper Use of face shield and dust
tools, power tools can mask.
lead to electric shock Ensure use of PPEs specific to
and fire. tasks i.e., safety helmets, safety
Unavailability of glasses, safety gloves, safety
suitable fire shoes, ear plugs and face masks,
extinguisher and fire Hi-Visible vest/Full body coverall
blankets will be mandatory.
Unavailability of Maintain good housekeeping and
competent Fire Watch proper cable management.
at site.
Flying Objects
High Noise
Dust
Pre-task briefing shall be done
prior to start work activity
Materials to be stacked in drip tray
on level ground in storage area
Collapse of stacked
No stacking above than standard
of material.
level
Heavy loads
Follow instructions mentioned in
Uneven loads Close supervision of all work
MSDS form
Poor Lifting techniques activities at all times.
Manual handling technique trained
Liquid spillage Supervisor be aware about job
Maximum weight to lift per
Inhalation of chemical compliance and precautions
person should not exceed 20kgs
4: Storage of material fumes. 4 2 8 Only certified & pre inspected tools 2 2 4
Materials to be secured
Environmental aspects from falling/collapse will be allowed.
and impacts Engage enough number of persons
Make sure Emergency contact
Untrained workers for number posted and availability of for handling the material
the task. Unfit worker according to material weight
Eyewash facility, emergency
for the job
shower & first aider
Improper use of PPEs Dispose the waste buckets and
Slip, Trip and Fall brush as hazardous waste
Area shall be barricaded and
adequate signs posted around
Select and use of appropriate
Environmental aspects Safe proper storage of Materials Close supervision of all work
And impacts Follow instructions as mentioned activities at all times.
Slip trip fall. in MSDS form Supervisor be aware about
Personnel Injuries. Provision of appropriate PPEs job compliance and Hazards.
Adequate illumination and
ventilation provided
Maintain area clean and tidy
Eyewash facility, emergency
shower to be provided for in case
of direct contact
Ensure only approved limited
material storage
Ensure availability of spill kit and
drip trays
Provision of fire extinguishers
Dispose the waste chemical and
brush as hazardous waste as per
procedure
Clear access/egress free from
any obstructions
Heat stress awareness training
Exposure to extreme
Hot just before and during the hot
summer months to all applicable
personnel (who work outdoors)
Conduct mandatory Heat Stress
and those who manage personnel
Awareness training to all employees
and have responsibilities for
prior of deployment at site.
establishing heat stress mitigation
Provide rest shelter and water on
measures.
site prior of activity at site.
Ensure required rest period,
HSE Dept. to monitor on daily basis
and
for the weather condition at site.
minimum water needed.
HSE Dept. to identify the Heat
Provide own calibrated data
Index
6: Adverse Weather Conditions logging Temperature and 3 2 6 danger category on daily basis. 2 1 2
Humidity monitor to ensure
A standby qualified first aider/site
timely determination of weather
Nurse and first aid kit must be
condition.
available at site.
Danger category color coding shall
Ensure supply of water daily, to
be per the heat index.
provide abundant supply of water
Take appropriate action upon
at site.
developing symptoms of heat Ensure site with proper monitoring
cramps, heat exhaustion or heat and using kestrel equipment heat
stroke. stress program.
Ensure designated rest shelter have
sufficient drinking water station.
Administrative controls like
Stop work
Alarm others
Shutdown all machines e.g.,
generator, welding machines, etc.
Check wind direction
Proceed to nearest safe assembly
area in cross wind direction.
Participate in the headcount,
report
missing person (if any)
Stay at safe assembly area,
remain attentive, do not engage
in any unauthorized activity, wait
for further instruction.
All site personnel to participate
in
training drills. Conduct
emergency training drills in
coordination with SEVEN.
Maintain emergency contact list in
each work area.
Call Project Nurse or Site Safety
Manager for medical emergencies,
include 24/7 emergency contact
details in the emergency contact
list.
Note: Insert additional rows or print additional sheets as necessary to accommodate all job steps.