0% found this document useful (0 votes)
11 views

Pending Issues Ffrom Client

Uploaded by

Sangeeta Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Pending Issues Ffrom Client

Uploaded by

Sangeeta Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

J Kumar Infraprojects Limited

Dwarka Expressway Package-I


Pending Iaaues of Utility Payment from Client

S.No. Description Amount in (Cr.) Remarks


(A) Main EPC Works
MC-10-Repair of D-Wall, Centre Piles, Shed Work
1 7.00
on Tunnels
2 Power Supply to the Project from IICC
3 Drawings of Canopy Shed approval from PC

4 Drawing of Separator from PC-Approval required 11.37

5 D-Wall Repair 7.00


6 RE Wall-MC-10-Drawing approval required 5.47
7 NCR-MC-11 9.37
8 NCR-MC-16 2.44
9 NCR-MC-17 2.00
10 Other NCR Site issues 9.00
11 Breacket +Sheating 3.76

(B) COS
COS-4 MEP-Drawing of substations, tunnels, DG
1 and RMU+Transformer foundation-Approvad Mr. Surender Singh from LKT
Drawing required
COS-3-Road side drain-Structural + Hydraulic
2 Mr. Atul Jolly
Design required

COS-3-Art Work in MC-10-Shallow Tunnel on


3 pillars-Art Work on painted surface to be done and Mr. Rajender Rawat/Mr. Dilip Kumar
MS Artwork to be done in continuation

COS-2-Correction factor letter be again on


4 25.07.2024 for 33.6 cr. in response to letter from MD Sir may discuss with member
NHAI
Beautification-COS-Returned by AE -Supply of good
5 4.10
earth is being deducted by AE

MEP COS-Approval is being delayed by AE team -


6
requirements comes from them in piece-med

Fire Approval-MIST system-Whether required in


7
MCA1, MCA2, MCA3 & MCA4
8 Signages COS pending from our side
9 Car Policy claim 60.00 Mr. Ashok Singh/H.O.
J Kumar Infraprojects Limited
Dwarka Expressway Package-II
Pending Iaaues of Utility Payment from Client

S.No. Description Amount in (Cr.) Remarks

(A) Main EPC Works

1 CRRI Joint discussion with PD on 26.07.2024 17.00 Mr. Satyavrat Tyagi

2 IIT Roorkee 7.20 Mr. Satyavrat Tyagi

3 IOCL Culvert 4.26 Mr. Sirohi/Ashok

4 PVC Sheet covering 5.60 Mr. Atul Jolly

5 Road Marking + Safety device+Electrical work 10.79

6 To talk to senior officers for LD Notice MD Sir

7 NSV Report for Bituminous Work 3.31

(B) COS

COS Beautification-Strip Line Chart for Lighting -Qty Surya Electrical/Mr. Surender Singh/Mr.
1
and Rates Satyavrat Tyagi

Letter for difference in amount of Noise Barrier best


2 5.00
on 25.07.2024

FOB and Toll Plaza are under scrutiny/approval RO


3 Mr. Gourav
office

4 Signage COS in with PIU Mr. Manish Purabia

Drawing for Pier, Pier Cap and Segment for


5 reinforcement required from Mr. Avikshit for Mr. Atul Jolly/MD Sir
certification of quantities from AE/NHAI

6 Signages COS are pending from our side


Naveen

48

Male

4641180016232850.00

Nov-26

444

Sangeeta Verma