C&W Organization_0
C&W Organization_0
At Zonal HQ
Chief Rolling Stock Engineer (Chg) Chief Rolling Stock Engineer (Fr.)
At Division
At Depot/Shed
CDO
SSE(Depot Incharge)
STC/KGP 3
C&W organisation set-up in a Division.
Codification and Numbering of Coaches.
Ineffective percentage.
Yard Stick.
Nomination of a Depot.
Concept of a Block Rakes.
Indication and Destination Boards.
Fire Extinguishers.
Brake Van Equipment.
Integrated Maintenance.
Rake link
Working Timetable.
A C&W Engineer is not only responsible for the maintenance of discipline, keeping
the morale of staff at a high level, but is also required to organize the execution of the
technical details of work and to ensure that the required tools and raw material are made
available. He has to ensure that quality standards are maintained and should be cost
conscious to cut down the expenditure to the minimum.
General Duties
The following items will help a C&W Engineers considerably in discharging his duties
and gaining proficiency in these will also materially contribute to the betterment of his
prospects:
STC/KGP 4
Job concern duties
STC/KGP 5
General information
- Sick-line outturn
- Position of Coaches in sicklines and Yard.
- Coaches marked sick on road-side stations, number of coaches released
and balance left over.
- Home line POH and NPOH coaches on the Divisions.
- POH coaches inside Shops under-going repairs and in shop-pockets
awaiting repairs ( to be collected by the CCR of the Division in whose
jurisdiction the shops are situated)
- POH coaches at the Stations / Yards awaiting feeding to the Shops.
- Stock held up for want of material and details of material required and
action taken by the Division for arranging the material.
STC/KGP 6