Purchase Flow
Purchase Flow
PD (Project Director)
Engineer Dept:
Architect QS
CEO
irector)
ral Manager)
partment
Transport Dept:
PE Supervisor
ME/EE/SE Driver
Ass. Engineer
Site Engineer
Site Supervisor
LCM Dept:
GM
AGM
Sr Accountant GM GM GM
AM AM AM AM AM
Jr Purchaser
Manager
Office Assistant
Data Entry
Site Purchase PCM LCM Account Store Engineer
Budget/ Demand * * * *
PR * * * *
PO * * * * *
OI * * * *
GRN * * *
Payment * * *
Budget/ Demand Site
1
Request and inform the sector PE (Engineer)
Engineer
2
Checked the items and report to PCM
Purchase
3
Items Spec:, average price
PCM
4
Approved the budget
PR Site
1
Request & fill the Form, Checked & signed
Engineer
Checked the items, qty, work, balance the stock, 2
work done, adjust the planning target & report to
PCM
LCM
PCM
Approved the PR with weekly, monthly meeting 4
result & work done milestone.
PO Purchase
Compare the supplier, brand, price, country
origin, Engineer recommand or feedback, balance 1
qty calculate and stock controlling. Prepared and
approved with sign.
LCM
Account
Qty, Price & Supplier marked and balance the 3
budget.
Store
4
receive the PO list and prepared for store
Engineer
5
Confirm for the PO items
OI LCM
1
Checked the PO qty and controled the stock take 1
by site. OI announce for site, store. That is
approved for take the items from store.
Site
OI received intime and take the items from store. 2
Use the items for workdone.
PCM
3
OI approved and monitor the workdone.
Engineer
The items are arrived or not checked the store 4
and make the workdone
GRN Store
inform and checked all items with PO lists. Pay 1
the GRN to supplier, purchase, account & keep
one copy.
Purchase
Checked the GRN items is corrected or not with 2
PO lists & keep for payment.
Account
3
Mark the qty, price and checked the stock.
Payment Purchase
Payment Form prepared with the credit or cash 1
invoice, GRN & PO attached.
LCM
Account