Activity - 241223 - Murung Raya Coal - Drilling - Daily - Rig - 01 - AIR
Activity - 241223 - Murung Raya Coal - Drilling - Daily - Rig - 01 - AIR
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302 0.00 3.70
7.90 15.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam General
Cement Standing
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
3.70 3.70 5.20 1.50 0.25 17%
5.20 6.70 1.50 0.50 33%
6.70 7.90 1.20 0.70 58%
7.10
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 10:00 3.000
Setting water supply 10:00 12:00 2.000
Rest time 12:00 13:00 1.000
Drilling 13:00 17:00 4.000
Back to Mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302 15.00 35.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam General
Cement Standing
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
20.00
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 10:00 3.000
Drilling 10:00 12:00 2.000
Rest time 12:00 13:00 1.000
Drilling 13:00 17:00 4.000
Back to Mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302 35.00 45.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Work
Foam Standing
Cement Work
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
10.00
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Drilling 7:00 12:00 5.000
Rest time & Waiting rain 12:00 14:00 2.000
Drilling 14:00 17:00 3.000
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy & Rainy
Coordinate by GPS
Hard Sand stone from: 35.00 - 45.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302 45.00 60.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Work
Foam Standing
Cement Work
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
15.00
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Drilling 7:00 12:00 5.000
Rest time & Waiting rain 12:00 14:00 2.000
Drilling 14:00 17:00 3.000
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy & Rainy
Coordinate by GPS
Hard Sand stone from: 45.00 - 60.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC Standing
Bentonite General
Foam General
Cement Work
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
Waiting Portal & Rest time 6:00 13:00 7.000
Go to site 13:00 14:00 1.000
Setting water supply 14:00 15:30 1.500
Drilling (Flushing & Reaming) 15:30 17:00 1.500
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Standing
Cement General
Liquid Polymer (Liter) General
Fuel - Solar (liter) General
Fuel - Bensin (Liter) General
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Geophysical Logging 13:00 14:00 1.000
Rig Down 14:00 15:00 1.000
Make acces next plan 15:00 17:00 2.000
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Standing
Cement General
Liquid Polymer (Liter) General
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting slippery road & Make acces 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Moving Rig 13:00 16:00 3.000
Set up rig 16:00 17:00 1.000
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC Standing
Bentonite
Foam
Cement
Liquid Polymer (Liter)
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
OFF DAY 6:00 18:00 12.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302 0.00 25.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Standing
Cement General
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
25.00
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Change oil 40 & Change PCD 13:00 14:00 1.000
Drilling 14:00 17:00 3.000
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302 25.00 45.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Work
Cement Standing
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
20.00
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 10:00 3.000
Drilling 10:00 13:00 3.000
Rest time 13:00 14:00 1.000
Drilling 14:00 17:00 3.000
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Hard Sand stone from: 25:00 - 45.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302 45.00 63.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Work
Cement Standing
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
18.00
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 10:00 3.000
Drilling 10:00 13:00 3.000
Rest time & Waiting Rain 13:00 15:00 2.000
Drilling 15:00 17:00 2.000
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Hard Sand stone from: 45.00 - 63.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302 63.00 75.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Work
Cement Standing
Liquid Polymer (Liter) 1 Work
Fuel - Solar (liter) 15 General
Fuel - Bensin (Liter) General
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
12.00
ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting slippery hauling road 7:00 9:00 2.000
Continue drilling 9:00 12:00 3.000
Rest & meal 12:00 13:00 1.000
Continue drilling 13:00 16:30 3.500
Flushing & pull up road 16:30 17:00 0.500
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Hard Sand stone from: 63.00 - 75.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement General
Liquid Polymer (Liter)
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 11.0
Crew : Rengki (CUTI) 11.0
Crew : Ipung 11.0
Signatures
Driller : Ratno
Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery hauling road & waiting LV 7:00 9:00 2.000
LV breakdown (Trouble kampas rem),all crew 9:00 16:30 7.500
All crew rig 01 back to mess 16:30 17:00 0.500
11.000
Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will geophysical logging
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302
DHMR_B011
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam General
Cement Standing
Liquid Polymer (Liter) 1 General
Fuel - Solar (liter) 15 General
Fuel - Bensin (Liter) General
Engine Oil (Liter) General
Hydraulic Oil (Liter) General
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery hauling road,waiting LV go to 7:00 10:00 3.000
Pull down road & flushing 10:00 12:00 2.000
Rest & meal 12:00 13:00 1.000
Pengambilan alat logging 13:00 13:30 0.500
Geophysical logging,pull down road & flushing 13:30 14:30 1.000
Rig down 14:30 15:30 1.000
Searching new point drill & make access 15:30 17:00 1.500
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will moving to new point drill
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011 235219 9971706
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam General
Cement Standing
Liquid Polymer (Liter) General
Fuel - Solar (liter) General
Fuel - Bensin (Liter) General
Engine Oil (Liter) General
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 13.0
Crew : Rengki (CUTI) 13.0
Crew : Ipung 13.0
Signatures
Driller : Ratno
Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery hauling road,waiting LV go to 7:00 9:00 2.000
Moving & make access 9:00 12:00 3.000
Rest & meal 12:00 13:00 1.000
Continue moving 13:00 15:30 2.500
Set up rig 15:30 17:00 1.500
House keeping 17:00 17:30 0.500
Back to mess 17:30 19:00 1.500
13.000
Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will start drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235219 9971706 0.00 2.60
6.20 6.43
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Breakdown
Cement Breakdown
Liquid Polymer (Liter) 0.5 Standing
Fuel - Solar (liter) 10 Breakdown
Fuel - Bensin (Liter) Work
Engine Oil (Liter) General
Hydraulic Oil (Liter) General
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
2.60
2.60 3.20 0.60 0.00 0%
3.20 4.70 1.50 1.02 68%
4.70 6.20 1.50 1.04 69%
0.23
6.43 7.70 1.27 0.90 71%
ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery hauling road,waiting LV go to 7:00 9:00 2.000
Perbaikan sil control valve 9:00 9:40 0.667
Perbaikan gearbox 9:40 12:00 2.333
Rest & meal 12:00 13:00 1.000
Perbaikan corebarel 13:00 14:00 1.000
Start drilling (open hole & coring) 14:00 16:30 2.500
House keeping 16:30 17:00 0.500
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235219 9971706 7.70 20.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement Work
Liquid Polymer (Liter) 0.5 General
Fuel - Solar (liter) 10 General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
12.30
ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery road,waiting LV go to site 7:00 11:00 4.000
Rest time & Setting water supply 11:00 14:00 3.000
Drilling 14:00 16:30 2.500
House keeping 16:30 17:00 0.500
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235219 9971706 20.00 21.90
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement Work
Liquid Polymer (Liter) 0.5 Standing
Fuel - Solar (liter) 10 General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
1.90 21.90 22.40 0.50 0.50 100%
ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery road,waiting LV go to site 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Drilling 13:00 14:30 1.500
Rig di stop oleh warga (terkait lahan) 14:30 17:00 2.500
House keeping & Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 22.40 28.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement Work
Liquid Polymer (Liter) 0.5 Breakdown
Fuel - Solar (liter) 10 General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
5.60
ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery road,waiting LV go to site 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Drilling 13:00 14:30 1.500
Maintenance Gearbox (Bearing) 14:30 17:00 2.500
House keeping & Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 28.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement Standing
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting Langsiran LV 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Waiting Rain (LV tidak bisa naik) 13:00 17:00 4.000
House keeping & Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Rainy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 28.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Breakdown
Foam Standing
Cement Breakdown
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting LV breakdown 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Waiting LV breakdown (LV tidak bisa naik) 13:00 17:00 4.000
Back to mess 17:00 18:00 1.000
12.000
Remark :
Weather : Rainy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 28.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC Standing
Bentonite
Foam
Cement
Liquid Polymer (Liter)
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
OFF DAY 6:00 18:00 12.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)
Sample ID :
--
HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 28.00
CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC Breakdown
Bentonite
Foam
Cement
Liquid Polymer (Liter)
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0
Signatures
Driller : Ratno
Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part
DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
ACTIVITY HOURS
Remark From To AGG
Waiting LV breakdown 6:00 18:00 12.000
12.000
Remark :
Weather : Cloudy
Coordinate by GPS
Sample ID :