0% found this document useful (0 votes)
127 views92 pages

Activity - 241223 - Murung Raya Coal - Drilling - Daily - Rig - 01 - AIR

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views92 pages

Activity - 241223 - Murung Raya Coal - Drilling - Daily - Rig - 01 - AIR

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 92

--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Minggu
DATE : 1 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302 0.00 3.70

7.90 15.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam General
Cement Standing
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 10.80


Total Coring : 4.20
Total Depth Drilled : 15.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
3.70 3.70 5.20 1.50 0.25 17%
5.20 6.70 1.50 0.50 33%
6.70 7.90 1.20 0.70 58%
7.10

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 10:00 3.000
Setting water supply 10:00 12:00 2.000
Rest time 12:00 13:00 1.000
Drilling 13:00 17:00 4.000
Back to Mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS

Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Senin
DATE : 2 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302 15.00 35.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam General
Cement Standing
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 20.00


Total Coring : 0.00
Total Depth Drilled : 20.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
20.00

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 10:00 3.000
Drilling 10:00 12:00 2.000
Rest time 12:00 13:00 1.000
Drilling 13:00 17:00 4.000
Back to Mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS

Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Selasa
DATE : 3 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302 35.00 45.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Work
Foam Standing
Cement Work
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 10.00


Total Coring : 0.00
Total Depth Drilled : 10.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
10.00

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Drilling 7:00 12:00 5.000
Rest time & Waiting rain 12:00 14:00 2.000
Drilling 14:00 17:00 3.000
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy & Rainy
Coordinate by GPS
Hard Sand stone from: 35.00 - 45.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Rabu
DATE : 4 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302 45.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Work
Foam Standing
Cement Work
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 15.00


Total Coring : 0.00
Total Depth Drilled : 15.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
15.00

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Drilling 7:00 12:00 5.000
Rest time & Waiting rain 12:00 14:00 2.000
Drilling 14:00 17:00 3.000
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy & Rainy
Coordinate by GPS
Hard Sand stone from: 45.00 - 60.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Kamis
DATE : 5 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC Standing
Bentonite General
Foam General
Cement Work
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
Waiting Portal & Rest time 6:00 13:00 7.000
Go to site 13:00 14:00 1.000
Setting water supply 14:00 15:30 1.500
Drilling (Flushing & Reaming) 15:30 17:00 1.500
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS

Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Jumat
DATE : 6 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B006C 235347 9971661 302

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Standing
Cement General
Liquid Polymer (Liter) General
Fuel - Solar (liter) General
Fuel - Bensin (Liter) General
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Geophysical Logging 13:00 14:00 1.000
Rig Down 14:00 15:00 1.000
Make acces next plan 15:00 17:00 2.000
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS

Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Sabtu
DATE : 7 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Standing
Cement General
Liquid Polymer (Liter) General
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting slippery road & Make acces 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Moving Rig 13:00 16:00 3.000
Set up rig 16:00 17:00 1.000
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS

Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Minggu
DATE : 8 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC Standing
Bentonite
Foam
Cement
Liquid Polymer (Liter)
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
OFF DAY 6:00 18:00 12.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS

Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Senin
DATE : 9 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302 0.00 25.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Standing
Cement General
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 25.00


Total Coring : 0.00
Total Depth Drilled : 25.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
25.00

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Change oil 40 & Change PCD 13:00 14:00 1.000
Drilling 14:00 17:00 3.000
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS

Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Selasa
DATE : 10 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302 25.00 45.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Work
Cement Standing
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 20.00


Total Coring : 0.00
Total Depth Drilled : 20.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
20.00

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 10:00 3.000
Drilling 10:00 13:00 3.000
Rest time 13:00 14:00 1.000
Drilling 14:00 17:00 3.000
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS
Hard Sand stone from: 25:00 - 45.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Rabu
DATE : 11 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302 45.00 63.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Work
Cement Standing
Liquid Polymer (Liter) Work
Fuel - Solar (liter) General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 18.00


Total Coring : 0.00
Total Depth Drilled : 18.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
18.00

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting Slippery hauling road 7:00 10:00 3.000
Drilling 10:00 13:00 3.000
Rest time & Waiting Rain 13:00 15:00 2.000
Drilling 15:00 17:00 2.000
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS
Hard Sand stone from: 45.00 - 63.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Kamis
DATE : 12 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302 63.00 75.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite General
Foam Work
Cement Standing
Liquid Polymer (Liter) 1 Work
Fuel - Solar (liter) 15 General
Fuel - Bensin (Liter) General
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 12.00


Total Coring : 0.00
Total Depth Drilled : 12.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
12.00

ACTIVITY HOURS
Remark From To AGG
Go to site 6:00 7:00 1.000
Waiting slippery hauling road 7:00 9:00 2.000
Continue drilling 9:00 12:00 3.000
Rest & meal 12:00 13:00 1.000
Continue drilling 13:00 16:30 3.500
Flushing & pull up road 16:30 17:00 0.500
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS
Hard Sand stone from: 63.00 - 75.00 M
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Jumat
DATE : 13 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement General
Liquid Polymer (Liter)
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 11.0
Crew : Rengki (CUTI) 11.0
Crew : Ipung 11.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery hauling road & waiting LV 7:00 9:00 2.000
LV breakdown (Trouble kampas rem),all crew 9:00 16:30 7.500
All crew rig 01 back to mess 16:30 17:00 0.500
11.000

Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will geophysical logging
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Sabtu
DATE : 14 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B009 235282 9971658 302

DHMR_B011

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam General
Cement Standing
Liquid Polymer (Liter) 1 General
Fuel - Solar (liter) 15 General
Fuel - Bensin (Liter) General
Engine Oil (Liter) General
Hydraulic Oil (Liter) General
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging : 59.54
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery hauling road,waiting LV go to 7:00 10:00 3.000
Pull down road & flushing 10:00 12:00 2.000
Rest & meal 12:00 13:00 1.000
Pengambilan alat logging 13:00 13:30 0.500
Geophysical logging,pull down road & flushing 13:30 14:30 1.000
Rig down 14:30 15:30 1.000
Searching new point drill & make access 15:30 17:00 1.500
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will moving to new point drill
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Minggu
DATE : 15 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011 235219 9971706

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam General
Cement Standing
Liquid Polymer (Liter) General
Fuel - Solar (liter) General
Fuel - Bensin (Liter) General
Engine Oil (Liter) General
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 13.0
Crew : Rengki (CUTI) 13.0
Crew : Ipung 13.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance : 138

Signatures
Driller : Ratno

Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery hauling road,waiting LV go to 7:00 9:00 2.000
Moving & make access 9:00 12:00 3.000
Rest & meal 12:00 13:00 1.000
Continue moving 13:00 15:30 2.500
Set up rig 15:30 17:00 1.500
House keeping 17:00 17:30 0.500
Back to mess 17:30 19:00 1.500
13.000

Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will start drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Senin
DATE : 16 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235219 9971706 0.00 2.60

6.20 6.43

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Breakdown
Cement Breakdown
Liquid Polymer (Liter) 0.5 Standing
Fuel - Solar (liter) 10 Breakdown
Fuel - Bensin (Liter) Work
Engine Oil (Liter) General
Hydraulic Oil (Liter) General
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 2.83


Total Coring : 4.87
Total Depth Drilled : 7.70
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Bahrul
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
2.60
2.60 3.20 0.60 0.00 0%
3.20 4.70 1.50 1.02 68%
4.70 6.20 1.50 1.04 69%
0.23
6.43 7.70 1.27 0.90 71%

ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery hauling road,waiting LV go to 7:00 9:00 2.000
Perbaikan sil control valve 9:00 9:40 0.667
Perbaikan gearbox 9:40 12:00 2.333
Rest & meal 12:00 13:00 1.000
Perbaikan corebarel 13:00 14:00 1.000
Start drilling (open hole & coring) 14:00 16:30 2.500
House keeping 16:30 17:00 0.500
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Selasa
DATE : 17 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235219 9971706 7.70 20.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement Work
Liquid Polymer (Liter) 0.5 General
Fuel - Solar (liter) 10 General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 12.30


Total Coring : 0.00
Total Depth Drilled : 12.30
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
12.30

ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery road,waiting LV go to site 7:00 11:00 4.000
Rest time & Setting water supply 11:00 14:00 3.000
Drilling 14:00 16:30 2.500
House keeping 16:30 17:00 0.500
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Rabu
DATE : 18 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235219 9971706 20.00 21.90

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement Work
Liquid Polymer (Liter) 0.5 Standing
Fuel - Solar (liter) 10 General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 1.90


Total Coring : 0.50
Total Depth Drilled : 2.40
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
1.90 21.90 22.40 0.50 0.50 100%

ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery road,waiting LV go to site 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Drilling 13:00 14:30 1.500
Rig di stop oleh warga (terkait lahan) 14:30 17:00 2.500
House keeping & Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Kamis
DATE : 19 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 22.40 28.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement Work
Liquid Polymer (Liter) 0.5 Breakdown
Fuel - Solar (liter) 10 General
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 5.60


Total Coring : 0.00
Total Depth Drilled : 5.60
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)
5.60

ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting slippery road,waiting LV go to site 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Drilling 13:00 14:30 1.500
Maintenance Gearbox (Bearing) 14:30 17:00 2.500
House keeping & Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Jumat
DATE : 20 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 28.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Standing
Foam Standing
Cement Standing
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki (CUTI) 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting Langsiran LV 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Waiting Rain (LV tidak bisa naik) 13:00 17:00 4.000
House keeping & Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Rainy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Sabtu
DATE : 21 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 28.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC General
Bentonite Breakdown
Foam Standing
Cement Breakdown
Liquid Polymer (Liter) General
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
Go to office site PT.MRC 6:00 7:00 1.000
Waiting LV breakdown 7:00 12:00 5.000
Rest time 12:00 13:00 1.000
Waiting LV breakdown (LV tidak bisa naik) 13:00 17:00 4.000
Back to mess 17:00 18:00 1.000
12.000

Remark :
Weather : Rainy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Minggu
DATE : 22 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 28.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC Standing
Bentonite
Foam
Cement
Liquid Polymer (Liter)
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
OFF DAY 6:00 18:00 12.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS
Next day,we will continue drilling
Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :
--

DAILY DRILLING REPORT

CLIENT : IUP PT Murung Raya Coal RIG NO.


PROJECT : Drilling - Stage 2 RIG TYPE
LOCATION : Tumbang Bondang SIZE
DAY : Senin
DATE : 23 Desember 2024

SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m)
DHMR_B011C 235218 9971706 302 28.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC Breakdown
Bentonite
Foam
Cement
Liquid Polymer (Liter)
Fuel - Solar (liter)
Fuel - Bensin (Liter)
Engine Oil (Liter)
Hydraulic Oil (Liter)
PERSONIL Hours
Driller : Ratno 12.0
Crew : Rengki 12.0
Crew : Ipung 12.0

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Ratno

Wellsite : Roland
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
: RIG 01 AIR Reaming/Flushing
: Jacro-175 Geophisical Logging
: AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOWN Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
Total (m) From (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Remark From To AGG
Waiting LV breakdown 6:00 18:00 12.000
12.000

Remark :
Weather : Cloudy
Coordinate by GPS

Time of western Indonesia (Waktu Indonesia Barat/WIB)

Sample ID :