0% found this document useful (0 votes)
9 views

Weekly

Uploaded by

yvrr reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Weekly

Uploaded by

yvrr reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

JAMMALAMADUGU DIVISION Dt :: 16-10-2023

8th Week Target for VS Login, Tashildar Login and Final RoR 25-10-2023 to 31-10-2023.
S Name of TOTAL GT WORK BALANCE VS
Name of the Name of the DATE OF ORI VRO Tashildar RDO JC Final
N the EXTENT IN Login Remarks
Mandal Village RECEIVED YESTERDAY TODAY TOTAL IN Login Login Login LOGIN RoR
o Division IN A-C A-C
IN A- C IN A-C A-C
1 MUDDANUR 4415.12 13-04-2023 2478.59 0 2478.59 1936.53
JAMMALAMADUGU

MUDDANUR
2 PENIKALAPADU 2653.76 08-06-2023 947.05 0 947.05 1706.71

3 DONKUPALLI 744.65 01-06-2023 0 0 0 744.65 GT WORK


KONDAPURAM
4 YANAMALACHINTALA 2390.90 08-06-2023 1268.24 0 1268.24 1122.66

5 DUVVURU DUVVURU 6789.99 08-06-2023 4572.14 0 4572.14 2217.85

9th Week Target for VS Login, Tashildar Login and Final RoR 01-11-2023 to 07-11-2023.
S Name of TOTAL GT WORK BALANCE VS
Name of the Name of the DATE OF ORI VRO Tashildar RDO JC Final
N the EXTENT YESTERDAY TODAY TOTAL IN IN Login Remarks
Mandal Village RECEIVED Login Login Login LOGIN RoR
o Division IN A-C IN A- C IN A-C A-C A-C
RAMACHANDRAYAP
1 MYLAVARAM 2645.09 19-07-2023 0 0 0 2645.09
JAMMALAMADUGU

ALLI
2 KONDAPURAM KONDAPURAM 1198.53 12-09-2023 379.65 0 379.65 818.88
CHINNASINGANAPA
3 DUVVURU 1196.77 12-09-2023 0 0 0 1196.77
LLI
4 JAMMALAMADUGU MORAGUDI 1146.21 12-09-2023 0 0 0 1146.21
5 PRODDATUR REGULAPALLI 278.87 12-09-2023 0 0 0 278.87

10th Week Target for VS Login, Tashildar Login and Final RoR 08-11-2023 to 14-11-2023.
S Name of TOTAL GT WORK BALANCE VS
Name of the Name of the DATE OF ORI VRO Tashildar RDO JC Final
N the EXTENT YESTERDAY TODAY TOTAL IN IN Login Remarks
Mandal Village RECEIVED Login Login Login LOGIN RoR
o Division IN A-C IN A- C IN A-C A-C A-C
1 KONDAPURAM K.VENKATAPURAM 996.52 30-05-2023 0.00 0 0.00 996.52
JAMMALAMADUGU

2 KOTHAPALLE 2125.60 08-06-2023 0 0.00 0.00 2125.60


PRODDATUR
3 NANGANURUPALLI 1320.79 12-09-2023 0 0 0.00 1320.79

4 DUVVURU MADIREPALLE 2167.83 28-03-2023 0 0.00 0.00 2167.83

5 PEDDAMUDIAM MEDIDINNE 1491.64 13-06-2023 0 0.00 0.00 1491.64


11th Week Target for VS Login, Tashildar Login and Final RoR 15-11-2023 to 21-11-2023.
S Name of TOTAL GT WORK BALANCE VS
Name of the Name of the DATE OF ORI VRO Tashildar RDO JC Final
N the EXTENT YESTERDAY TODAY TOTAL IN IN Login Remarks
Mandal Village RECEIVED Login Login Login LOGIN RoR
o Division IN A-C IN A- C IN A-C A-C A-C
JAMMALAMADUGU

1 PEDDAMUDIAM CHINNAMUDIAM 2388.77 13-06-2023 0 0 0.00 2388.77


2 MYLAVARAM KALLUTLA 3234.90 12-09-2023 0 0.00 0.00 3234.90
3 DUVVURU IDAMADAKA 2405.54 08-06-2023 0.00 0.00 0.00 2405.54
4 NALLABALLE 2865.04 28-03-2023 0 0.00 0.00 2865.04
MUDDANURU
5 VELPUCHERLA 2233.27 13-04-2023 0.00 0 0.00 2233.27

12th Week Target for VS Login, Tashildar Login and Final RoR 22-11-2023 to 28-11-2023.
S Name of TOTAL GT WORK BALANCE VS
Name of the Name of the DATE OF ORI VRO Tashildar RDO JC Final
N the EXTENT YESTERDAY TODAY TOTAL IN IN Login Remarks
Mandal Village RECEIVED Login Login Login LOGIN RoR
o Division IN A-C IN A- C IN A-C A-C A-C
1 PRODDATUR TALLAMAPURAM 3079.46 08-06-2023 0.00 0.00 0.00 3079.46
JAMMALAMADUGU

2 PEDDAMUDIAM DIGUVAKALVATALA 4844.99 13-04-2023 0 0.00 0.00 4844.99


3 JILLELA 3840.24 08-06-2023 0 0.00 0.00 3840.24
DUVVURU
4 MACHANAPALLE 3454.25 28-03-2023 0 0.00 0.00 3454.25
5 MUDDANUR KOSINEPALLI 4030.55 13-06-2023 0.00 0.00 0.00 4030.55

13th Week Target for VS Login, Tashildar Login and Final RoR 28-11-2023 to 04-12-2023.
S Name of TOTAL GT WORK BALANCE VS
Name of the Name of the DATE OF ORI VRO Tashildar RDO JC Final
N the EXTENT YESTERDAY TODAY TOTAL IN IN Login Login
Remarks
Mandal Village RECEIVED Login Login LOGIN RoR
o Division IN A-C IN A- C IN A-C A-C A-C
JAMMALAMADUGU

1 PRODDATUR PEDDASETTYPALLI 5675.31 19-08-2023 0 0.00 0.00 5675.31


TALAMANCHIPATN
2 MYLAVARAM 4401.76 08-06-2023 0 0.00 0.00 4401.76
AM
3 DENEPALLI 4090.05 14-08-2023 0 0.00 0.00 4090.05
4 MUDDANUR BONDALAKUNTA 5704.18 28-03-2023 0 0.00 0.00 5704.18
5 KORRAPADU 5089.43 13-04-2023 0.00 0.00 0.00 5089.43

14th Week Target for VS Login, Tashildar Login and Final RoR 05-12-2023 to 11-12-2023.
S Name of TOTAL GT WORK BALANCE VS
Name of the Name of the DATE OF ORI VRO Tashildar RDO JC Final
N the EXTENT YESTERDAY TODAY TOTAL IN IN Login Login
Remarks
Mandal Village RECEIVED Login Login LOGIN RoR
JAMMALAMADUGU

o Division IN A-C IN A- C IN A-C A-C A-C

1 MYLAVARAM M.KAMBALADINNE 7959.47 12-09-2023 0 0.00 0.00 7959.47

2 MUDDANUR MANGAPATNAM 12766.11 17-03-2023 0 0.00 0.00 12766.11

You might also like