What is BEAM?
BEAM =
Building Environmental Assessment Method
5
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
Hong Kong Green Building Council
The Vision
To help save the planet and improve the wellbeing of the people
of Hong Kong by transforming the city into a greener built
environment
The Mission
To lead market transformation by advocating green policies to the
Government; introducing green building practices to all
stakeholders; setting design, construction and management
standards for the building profession; and promoting green living
to the people of Hong Kong
6
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Society Limited
1996 2010
7
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Society Limited
Vision
A sustainable community and a green liveable built
environment in harmony with nature
Mission
To administer and develop the BEAM Plus assessment tools, and
build capacity in the community through education and training
to advance health and well-being
8
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Society Limited
Objectives
• Improve the environmental performance of the built environment across their life
cycle
• Provide healthier, higher quality, more durable and efficient working and living
environments for users
• Extend sound practices of BEAM Plus assessment tools beyond Hong Kong
9
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview - BEAM Development
1996 1999 2002 2004 2009 2010 2011 2012 2013 2016 2019 2021 2022 2023
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview - BEAM Plus Rating Tools
ND BEAM Plus
Neighbourhood BEAM Plus
Existing Buildings EB
NB BEAM Plus
New Buildings BEAM Plus
Interiors BI
DC BEAM Plus
Data Centres
BEAM Plus
Existing Schools
ES
11
©copyright,
©copyright, all rightsall rights reserved
reserved
Scope of BEAM Plus
Scope of BEAM Plus
Stages of Building Design Operation and Interiors Fit out/
Project Master Planning
and Construction Management Renovation
Development
BEAM Plus BEAM Plus
New Buildings Existing Buildings BEAM Plus
v2.0 v2.0 Interiors v2.0
BEAM Plus
Neighbourhood
v1.0
12
©copyright,
©copyright, all rightsall rights reserved
reserved
Benefits of Green Building
Why go GREEN?
According to the Green
Building Market Report
South East Asia 2014 by
BCI, the reasons for
engaging in green building
are:
1. Achieve lower
lifecycle costs
2. Achieve increased
property value/
marketability
13
©copyright,
©copyright, all rightsall rights reserved
reserved
Benefits of Green Building
Significant Benefits of
Using a Green Building Rating System
Opportunity to Learn
Ability to Create a Better More about the Specific
Performing Building Elements of a Green
Building
Global Perspective:
• With growing concerns about the environment and the ongoing energy
crisis, the concept of green building was developed
• Green buildings accelerate the adoption of building practices that result
in efficient use of natural, sustainable and renewable resources for
residential and commercial construction ➔ Sustainable communities
with sustainable urban infrastructure
• Building environmental assessment methods are considered one of the
most potent and effective means both to improve the performance of
buildings and to promote higher expectations and demand
• Governmental Mandates and/ or Incentives
15
©copyright,
©copyright, all rightsall rights reserved
reserved
Green Building Development
Local Action:
• BEAM Plus, assessed by BSL and certified by HKGBC, is the green building
assessment system to measure, improve and label the environmental
performance of buildings
16
©copyright,
©copyright, all rightsall rights reserved
reserved
Unique Market Position of BSL
• Developers seek gross floor area (GFA) concessions for green features in
their new buildings are required to undergo BEAM Plus green building
assessment and certification
17
©copyright,
©copyright, all rightsall rights reserved
reserved
Public Body Conversion
• With effect from 15 July 2016, both HKGBC and BSL have
become Public Bodies
18
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Practitioner
19
©copyright,
©copyright, all all rights
rights reserved
reserved
BEAM Pro Training Fundamental Course
[Prerequisite for non-BEAM Pro who wish to be
Elective Course BEAM Pro Credential
EDC EXAM
Yes
Online Registration Training 50 MC
3 hours Questions Pass
$1,000 90 mins
No
ES EXAM
Training 50 MC
Yes
1.5 hours Questions Pass
90 mins
No
START HERE
Remarks:
BSL’s Online Training Portal • BEAM Pro accredited with any credential could enrol other elective
©copyright, all rights reserved courses if he/she wishes to specialise in other BEAM Plus assessment tools
BEAM Professionals (BEAM Pro) 綠建專才
• The key roles of BEAM Pro are to integrate the green building standards and
practices into everyday building planning, design, construction & operation, and to
assist the clients to achieve the desired green building rating level
21
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Affiliate 綠建通才
• A BEAM Affiliate is a person accredited by the Hong Kong Green Building Council
Limited (HKGBC) as being competent to support green building design,
construction and operations.
• In a typical project setting, BEAM Affiliates work under a BEAM Pro to support the
green building certification process.
22
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Practitioners – Rules of Conduct
23
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Practitioners – Rules of Conduct
24
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Assessors
25
©copyright,
©copyright, all rightsall rights reserved
reserved
Qualification of BEAM Assessors (NB/EB/BI)
26
©copyright,
©copyright, all rightsall rights reserved
reserved
Qualification of BEAM Assessors (NB/EB/BI)
27
©copyright,
©copyright, all rightsall rights reserved
reserved
Qualification of BEAM Assessors (ND)
28
©copyright,
©copyright, all rightsall rights reserved
reserved
Assessment Procedures
29
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview of Assessment Procedures
Yes
BEAM Pro
Response First appeal
to BSL Final appeal
to HKGBC
No time limit set for the return but will
affect the overall project lead time.
30
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview of Assessment Procedures
Normal Route
Yes
BEAM Pro BEAM Pro
Response Response First appeal
to BSL Final appeal
to HKGBC
No time limit set for the return but will
affect the overall project lead time.
Remarks:
EB v2.0 Selective Scheme: 45 working days (BSL) + Applicant (BEAM Pro) Response Time
32
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview of Assessment Procedures
For BI (v1.0)
Yes
BEAM Pro
Response First appeal
to BSL Final appeal
to HKGBC
No time limit set for the return but will
affect the overall project lead time.
33
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview of Assessment Procedures
For BI (v2.0)
Yes
BEAM Pro
Response First appeal
to BSL Final appeal
to HKGBC
No time limit set for the return but will
affect the overall project lead time.
34
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview of Assessment Procedures
Normal Route
5/15 working
days per credit 45 working BSL
NB CA head OP NB RFA days issues result
Submission Application1 Submission to
Applicant
Remaining
Credit-by-credit
credits
submission up to
Anticipated Gold
rating
1 For BA approval on or after 30 June 2024 35
©copyright,
©copyright, all rightsall rights reserved
reserved
Compliance Assessment (CA)
Features:
• Carry out before OP
• Batch by batch submission, instead of Single-Bundle submission
• Credit based assessment
• Credit achieved in CA will not be assessed in RFA (with exception)
3. Performance Check -
36
Compliance Assessment (CA)
Submit
PA OP RFA
CA
throughout
construction
Design Construction
38
Registration
39
©copyright,
©copyright, all rightsall rights reserved
reserved
Time Limit for Commencing Assessment
Applicant should commence project assessment within the following time limit
(counted from the date of the Acknowledgement Letter):
BEAM Plus Tools Time Limit
NB V2.0 / NDC V1.0 Two years for PA
Comprehensive Scheme A – PA & FA One year for PA
EB V2.0 / Comprehensive Scheme A – FA only One year for FA
EDC V1.0 Comprehensive Scheme B One year for FA
Selective Scheme One year for FA
Existing Schools v1.0 One year for FA
Interiors One year for FA
Neighbourhood Two years for FA
* NB / NDC – the FA should be completed within 18 months of the date of issuance of the OP.
* EB V2.0 / EDC V1.0 (Comprehensive Scheme A) – the applicant shall commence the FA within 30
months from the commencement of PA
40
©copyright,
©copyright, all rightsall rights reserved
reserved
Before Project Assessment
41
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview of Assessment Procedures
Provisional Final
Tools
Assessment Assessment
Interiors
Neighbourhood
Remark
1) Can be omitted with reasonable justification. 42
©copyright,
©copyright, all rightsall rights reserved
reserved
Performance Pledge for Assessment
44
©copyright,
©copyright, all rightsall rights reserved
reserved
Submission cut-off time
Example A:
If a designated public holiday falls on Friday (5th), the cut-off time for submission will be on
Wednesday (3rd) 12:00 noon and thereafter the submission will be processed on the next
Monday (8th).
Example B:
If a designated public holiday falls on Monday (20th), the cut-off time for submission will
be on Thursday (16th) 12:00 noon and thereafter the submission will be processed on
Tuesday (21st).
45
©copyright,
©copyright, all rightsall rights reserved
reserved
Submission cut-off time
Example C:
If a designated public holidays fall on Tuesday to Thursday (17th to 19th), the cut-off time
for submission will be on Friday (13th) 12:00 noon and thereafter the submission will be
processed on the next Friday (20th).
46
©copyright,
©copyright, all rightsall rights reserved
reserved
Submission Media
47
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview of iBEAM
©copyright,
©copyright, all rightsall rights reserved
reserved
Overview of iBEAM
©copyright,
©copyright, all rightsall rights reserved
reserved
iBEAM Features and Benefits
50
©copyright,
©copyright, all rightsall rights reserved
reserved
iBEAM Features and Benefits
Reduced
human
dependence
System and
Enhanced
process
consistency
integrity
Effectiveness
and efficiency
of iBEAM
Lower risks
Eliminated of irregular
latency practices
like bribery
Assessment process becomes Higher
smoother, more transparent transparency
and more efficient
51
©copyright,
©copyright, all rightsall rights reserved
reserved
User Authority
52
©copyright,
©copyright, all rightsall rights reserved
reserved
iBEAM User Guide
Submission by FTP, DVDs and USB drive are also acceptable, however, ONLY one kind
of medium of submission, whichever reaches BSL first, will be taken as the submission.
BSL reserves the right to reject any incomplete submission. Formal procedure on
project assessment and timeline for performance pledge shall commence until
complete set of submission materials are submitted.
54
©copyright,
©copyright, all rightsall rights reserved
reserved
Assessment Process
The Applicant will receive a Notification of the Assessment Result after the ASC
meeting. If their target rating cannot be achieved, a Post-TRC clarification will be
issued.
The Applicant shall choose either one of the following options and confirm their
choice to BSL within 5 working days from the date of issuance of the Notification of
the Assessment Result:
Option A:
i. Notify BSL their acceptance to proceed post-TRC and answer the list of questions
ii. Assessment report will be issued in 20 working days
iii. The performance time pledge will only count up to the issuance of the
Notification of Assessment Result
Option B:
i. Notify BSL the acceptance of the assessment result and not to proceed with the
post-TRC clarification
ii. The normal performance time pledge will follow
56
©copyright,
©copyright, all rightsall rights reserved
reserved
Review Mechanism
There is a 10-working day review period where the BAS and the Applicant can
resolve any differences and misunderstanding via BSL.
Upon the conclusion of the review, or upon the lapse of the 10-working day
review period, or upon the acceptance of the results by the Applicant, the
result will be forwarded to HKGBC for issuance of certificate or the “First
Stage PA Result Letter” which can be used for submission to BD to apply for
consent to commence work.
If the applicant is still dissatisfied with the assessment result after the review,
a further period of 10 working days will be allowed for the applicant to
lodge an appeal following the established Appeal Procedures.
57
©copyright,
©copyright, all rightsall rights reserved
reserved
Appeal
59
©copyright,
©copyright, all rightsall rights reserved
reserved
Credit Interpretation Request (CIR)
• Upon receiving the CIR and its payment, BSL would take 60
calendar days to process the CIR
60
©copyright,
©copyright, all rightsall rights reserved
reserved
Process of CIR
• Normally for Credits, CIR will only be accepted after the project
registration and before the commencement of each of the PA or
FA assessment
61
©copyright,
©copyright, all rightsall rights reserved
reserved
Multiple PAs/ FAs for Large Developments
• Large projects with multiple development phases and hence separate OP (or
Completion Certificate or Handover) would be allowed to carry out one PA/
multiple PAs with multiple FAs under the assessments for BEAM Plus NB
• Project applicants shall notify BSL with justifications for agreement before
commencement of PA/ FA
62
©copyright,
©copyright, all rightsall rights reserved
reserved
Key Information on Multiple PAs/ FAs
63
©copyright,
©copyright, all rightsall rights reserved
reserved
Assessment Fees
• https://www.beamsociety.org.hk/en_fees.php
Registration Fees
Assessment Fees
Credit Interpretation Request
Fee for First Appeal
Fee for Final Appeal
Re-assessment fees
Two-stage Assessment
Fee for Re-issue of BEAM Plus Certificate (HK$2,000)
Fee for Issue of Variation Order (HK$2,000)
Fee for Duplicate Copy of Agreement (HK$1,000)
64
©copyright,
©copyright, all rightsall rights reserved
reserved
Technical Review Committee (TRC)
Project Quality
Assessment Monitoring
Development
and Strategy
65
©copyright,
©copyright, all rightsall rights reserved
reserved
Role of Expert Panel
66
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Assessor’s Duties
67
©copyright,
©copyright, all rightsall rights reserved
reserved
Communication Channel
68
©copyright,
©copyright, all rightsall rights reserved
reserved
Technical Circular Letters & FAQs
69
©copyright,
©copyright, all rightsall rights reserved
reserved
Technical Circular Letters & FAQs
70
©copyright,
©copyright, all all rights
rights reserved
reserved
BEAM Plus NB v2.0
71
©copyright,
©copyright, all rightsall rights reserved
reserved
The Revamp of NB Rating Tool
72
©copyright,
©copyright, all rightsall rights reserved
reserved
Fundamentals of Major Revision
Beyond
Statutory Adaptability Certainty Practicality
Requirements
73
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Plus New Buildings v2.0
• Major refurbishment
74
©copyright,
©copyright, all rightsall rights reserved
reserved
Performance Categories for NB v2.0
Integrated Design and
Construction Management (IDCM) New!
Innovations and
Additions (IA) Sustainable Site (SS)
BEAM
Health and Plus NB
Wellbeing Materials and
(HWB)
v2.0 Waste (MW)
75
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
NB v2.0‘s Features – New Category
Smart Design
& Prerequisites
Technologies
IDCM
Green Integrative
Construction Design
Practices Process
76
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
NB v2.0‘s Features – IDCM
** Applicant must attempt all applicable stages to attain any partial credit.
77
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
NB v2.0‘s Features
Unlike V1.2, there is no area
weighting under EU and HWB!
Credit point
Retail
Education
Energy saving (%)
78
©copyright,
©copyright, all rightsall rights reserved
reserved
NB v2.0‘s Features
Credit Bonus IA
80
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
NB v2.0‘s Features – Prescriptive & Performance
Path
• EU 1 – 3: Allow applicant to select either prescriptive or
performance path
Example: EU 2 – Reduction of CO2 Emissions
Energy Analysis
Enhancement
Active System Passive Design Passive Design
beyond Statutory
81
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Scoring – NB
Each Category
CLASSIFICATION Overall (IDCM, SS, MW,
EU, WU & HWB)
Flexibility
GOLD 65% 20%
amongst
categories
SILVER 55% 20% achievement
82
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
Scoring Example - NB
Achieved
Achieved Achieved Total % of Category Weighted
Applicable Minimum
Category Normal Bonus Achieved Achieved Weight Achieved
Credits Percentage
Credits Credits (1) Credits Credits (2) Factor Score
(20%)?
WU 12 2 0 2 16.7% 7% 1.2 NO
Pre-requisite
Overall Rating 71.9
Achieved
1. A factor of 1.2 is applied in score calculation for attaining bonus and additional
bonus credits.
2. Maximum possible score under each category is 100%.
83
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Prerequisites
84
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Prerequisites
85
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Prerequisites
Recycle Bins
86
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Prerequisites
87
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
Innovations & Additions
88
©copyright,
©copyright, all rightsall rights reserved
reserved
Innovations & Additions
89
©copyright,
©copyright, all rightsall rights reserved
reserved
Submittal Checklist
(Sample of SS2)
90
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Plus EB v2.0
91
©copyright,
©copyright, all rightsall rights reserved
reserved
The Revamp of EB Rating Tool
92
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Plus Existing Buildings V2.0
New Concept:
Staged Submission
93
©copyright,
©copyright, all rightsall rights reserved
reserved
New Concept
Plan
Better than
Act Do Yesterday
Check
94
©copyright,
©copyright, all rightsall rights reserved
reserved
New Features
Features
• New ‘Management Aspects’ to promote
green practices & management
➢ e.g. Green Purchasing Plan
• ‘Better than Yesterday’ as practical
improvement for aged building
➢ Adoption of Selective Scheme (self
improvement)
• Waste Aspects enhanced to encourage
waste management
➢ Promote & advocate to waste
management
• Tenants participation in the scheme to
arouse behavioral change
95
©copyright,
©copyright, all all rights
rights reserved
reserved
EB v2.0 Assessment Framework
EB v2.0
Assessment
Obtain
intermediate
Submission of
results for MAN
SA
& WU
Maximum 3 years
Obtain
Submission of Submission of MWA, EU, IEQ,
intermediate
MAN & WU and IA, with updated data
result for SA
for MAN, SA & WU
7 main aspects
• Management
• Site Aspects
• Energy Use
• Water Use
• IEQ
98
©copyright,
©copyright, all rightsall rights reserved
reserved
Comparison
Summary of credits
MAN 23 + 6B 44 + 5B
SA 22 + 3B 49 + 2B
MWA 17 + 7B 53 + 2B
EU 39 + 9B 51 + 2B
WU 23 + 8B 41 + 14B
IEQ 26 + 5B 50 + 2B
IA 12B (Max. 10B) 0
Total 150 + Max. 50B 288 + 27B
99
©copyright,
©copyright, all rightsall rights reserved
reserved
Comparison
Grading Methodology
Comprehensive
Scheme:
Selective
Scheme:
100
©copyright,
©copyright, all rightsall rights reserved
reserved
Comparison
Certification
4 grades 4 grades
• Platinum • Excellent
• Silver • Good
• Bronze • Satisfactory
101
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Plus Interiors
102
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Plus Interiors
103
©copyright,
©copyright, all rightsall rights reserved
reserved
Framework & Process
Single-stage Certification:
104
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
Validity
Certificates are valid for 5 years from the date of their issue.
Certified projects are listed in a website database to indicate their client, location,
size, rating and validity period.
The certificate shall also expire when the tenant leaves the premises.
105
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Interiors v1.0
Application & Eligibility & Exclusions
BEAM Plus Interiors targets the most Excludes process related equipment and services
frequently encountered non-domestic associated with specialist design and operational
interior fit-out projects in Hong Kong: requirements.
e.g. IT server rooms; water meter cabinets;
auditoria; swimming pools, cold rooms; car parks
and loading bays.
TOTAL
100
Credits
MANAGEMENT ENERGY USE
INNOVATIONS
10 Credits 26 Credits Max 10
Extra credits
107
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Plus Interiors v1.0
Minimum Credit Scoring
The final certificate grading for projects certified under BEAM Plus
Interiors is conditional upon:
Platinum 75 15 18 17
Gold 65 13 16 15
Silver 55 11 12 12
Bronze 40 9 10 10
108
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Interiors v2.0
Performance Category
Non-Residential
109
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Interiors v2.0
Specific features
Standardisation of Credit Heads Non-Residential
Rating Methodologies
Minimum % for Each Performance Category
Overall Credit Points Rating
IDCM MAN MW EU WU HWB IA
≥75
≥65
≥55
≥40
110
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Interiors v2.0
Framework
Checklist based covering IDCM, MW, EU, WU and HWB Residential
111
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Interiors v2.0
Framework
Rating Methodologies Residential
≥45 items
At least 1 item
≥30 items
112
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
BEAM Plus Neighbourhood
113
©copyright,
©copyright, all rightsall rights reserved
reserved
BEAM Plus Neighbourhood
114
©copyright, all rights reserved
Eligibility and Timing for Certification
Fulfils two
“Prerequisites”
115
©copyright, all rights reserved
The Two Prerequisites
CAP1 CAP2
Minimum Neighbourhood Minimum Functional Uses
Amenities
▪ A minimum of TWO different functional
▪ A minimum of TWO different uses within the Assessment Area.
neighbourhood amenities (basic ▪ Functional uses include Residential,
services or recreational facilities) within office, retail, government facilities,
the Assessment Area. institutional and industrial (roads and
footpaths are excluded).
116
©copyright, all rights reserved
Assessment Stage and Validity
BEAM Plus
Neighbourhood
BEAM Plus New Buildings
BEAM Plus
Existing Buildings
117
©copyright, all rights reserved
Assessment Area
• Site Boundary: the platted Assessment Area = Site Area + Impact Area
property line of the Site
defining land and water
contained within it.
• Impact Boundary: The
parallel platted line 500M
away from the Site Boundary
• Impact Area: The area
between the Site Boundary
and the Impact Boundary
118
©copyright, all rights reserved
The Six Aspects
120
©copyright, all rights reserved
Determination of Overall Grade
Overall CA SA EA OEQ IA
score
Platinum 75% 50% 70% 70% 70% 3 credits
Gold 65% 40% 60% 60% 60% 2 credits
Silver 55% 30% 50% 50% 50% 1 credit
Bronze 40% 20% 40% 40% 40% N/A
121
©copyright, all rights reserved
BEAM Plus Data Centres
122
©copyright, all rights reserved
BEAM Plus Data Centres
Handy
Align with
BEAM Plus Family,
same performance
categories
Emphasis Uniqueness
Efficient energy use Assessment
is the key in Data framework, credit
Centres, new requirement are
requirement is tailored for Data
formulated Centres
123
©copyright, all rights reserved
BEAM Plus Data Centres
Scope of Application
1. Not less than 500 m2 ;
Whole building DC
development 2. DC associated function areas must not
larger than 25% of the floor area under
assessment; and
Note:
1. DC refers to organised spaces, commonly known as data halls, containing racks of IT equipment, such as
servers, data storage, etc., plus any spaces for supporting infrastructure and facilities (including switch rooms,
UPS rooms, battery rooms, etc.)
2. The data halls and any related plant spaces should make up a significant majority of the floor area of the
assessed DCs
3. For Existing DCs, at least one (1) year operation data and records are required.
124
©copyright, all rights reserved
BEAM Plus Data Centres
Performance Categories
Energy Use Water Use Health and Wellbeing Innovations and Additions
125
©copyright, all rights reserved
Frameworks of BEAM Plus Data Centres
Prerequisite
IDCM-00-P1 - Sustainability Champions – Project
IDCM-00-P2 - Environmental Management Plan
IDCM-00-P3 - Timber Used for Temporary Works
Prerequisite requirements
126
©copyright, all rights reserved
Frameworks of BEAM Plus Data Centres
Prerequisite
MAN-00-P1 - Green Purchasing Plan
Prerequisite requirement
127
©copyright, all rights reserved
Frameworks of BEAM Plus Data Centres
Note:
1. Minimum percentage of credits under EU is applicable for NDC and EDC.
2. Minimum percentage of credits under MAN is applicable for EDC only.
128
©copyright, all rights reserved
Frameworks of BEAM Plus Data Centres
70% 75%
60% 65%
- - - - -
50% 55%
40% 40%
129
©copyright, all rights reserved
Frameworks of BEAM Plus Data Centres
Grading Methodologies – BEAM Plus EDC V1.0
- - - -
50% 50% 55%
130
©copyright, all rights reserved
BEAM Plus Existing Schools
131
©copyright, all rights reserved
BEAM Plus Existing Schools
Unique Simple
Assessment framework, Handy, yet precise green
Unique Simple credit requirement are building rating tool for
tailored for existing existing schools in
schools Hong Kong
Educational
Promote Behavioral
Educational change among teachers,
parent and students
through education
132
©copyright, all rights reserved
Benefits of BEAM Plus Existing Schools
Reinforce School
Reduce the carbon environmental Drive behavioral
footprint of schools as leadership change across the
well as operating costs community
Shaped a sustainable
Improved school development path for
environmental schools
performance on
Energy, water &
recycling aspects
A certified
green school
133
©copyright, all rights reserved
Two-book System
Technical Guidebook
Target: Operation-level
134
©copyright, all rights reserved
Frameworks of BEAM Plus Existing Schools
Innovations and
Health, Comfort &
Additions (IA)
Happiness (HCH)
135
©copyright, all rights reserved
Frameworks of BEAM Plus Existing Schools
Synergy
19%
Hardware
Health, side
Comfort & Soft-side
Element Element 63%
Happiness 18%
16% Efficient Use
of Resources
36%
Sustainable
Campus
Environment
15%
Sustainable
Leadership and
Learning Required
Professional Inputs
33%
Professional 33%
Inputs Not
Required
67%
136
©copyright, all rights reserved
Rating Methodology
How to achieve the target rating under BEAM Plus Existing Schools?
Rating Requirement
1. No pre-requisite requirement
Overall score:
Green
≥ 50
Green
137
©copyright, all rights reserved
BEAM Plus Bespoke
138
©copyright,
©copyright, all rightsall rights reserved
reserved
Bespoke Mechanism
Aim
• To provide flexibility to the special building types which are not intended to
be covered under the current BEAM Plus tools.
Principles
• All Bespoke projects shall follow the objectives of BEAM Plus credits as far as
practicable.
139
Copyright ©©copyright,
all all
2010 Business
©copyright, rights reserved
Environment
rights reservedCouncil
Bespoke Mechanism
Eligibility
a) Buildings with restricted access (e.g. military, prison, fire station, power
substation, airport, boundary crossing facility)
b) Buildings not normally occupied or for transient stay (e.g. pump houses,
sewage treatment plant, carpark building)
e) Any other building types not listed above subject to BSL’s acceptance
140
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
Bespoke Procedure
NO
Endorsed ? Appeal
YES
141
Copyright ©©copyright,
©copyright,2010 rightsall
allBusiness rights reserved
reserved
Environment Council
Bespoke Procedure
NO
Approved ? Appeal
YES
https://greenbuilding.hkgbc.org.hk/projects/index
143
©copyright,
©copyright, all rightsall rights reserved
reserved
Way Forward
144
144
©copyright,
©copyright, all all rights
rights reserved
reserved
We exercise to keep us healthy,
145
Follow Us
146
©copyright,
©copyright, all all rights
rights reserved
reserved