0% found this document useful (0 votes)
16 views2 pages

Housekeeping Checklist dec-2024 3rd week

Uploaded by

Ashish Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

Housekeeping Checklist dec-2024 3rd week

Uploaded by

Ashish Yadav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Document KEC/IMS/EHS/07/FI50

No.
Issue. No. 02 Rev. No. 00
CHECKLIST FOR SITE
KEC HOUSEKEEPING Issue. Date 08-12-2018 Rev. Date 00-00-00

Page No. 1

Name of the project


Date
BT S- 2 6
Inspected By
Akhilesh mihrce
AGTIVITIES OBSERVATION REMARKS
SRNO.
STRUCTURAL FABRICATION / ERECTION SITE AREA
1 Walkways, passages kept clear of material.
Area and roads kept clear for manoeuvring of cranes and
2
material handling equipment.
3 Scrap, cut-pieces, welding electrode stubs, hand-tools
kept tidy in workarea and disposed suitably.
Scrap-bin available at site.
Welding cables, power cables routed properly to avoid
5 run-over by vehicle or tripping hazards and obstruction to
personnel movement.
Compressed gas hoses routed properly in the site.
Compressed gas cylinders and hoses kept away from hot
work and grinding work.
8
At least 1 metre on both sides of gantry rails is kept clear
of material.
Floor kept clear of water, oil spillage /accumulation.
CIVIL WORKS AREA
All approach, aisle, ingress / egress to / from site,
1 excavated pits, ramps, walkways kept clear of material
debris tools etc.
Scaffolding material, shuttering boards, etc. are stacked
2
properlyat site. No
Stacking of bricks, hollow blocks are done in safe
3
manner.
Nails removed from wOoden planks timber and not
protruding out.
Saw dust, wood chips and scrap wOod cleared from
5
carpentry shop and disposed suitably.
Debris from demolition and excavated earth cleared from
6
site and accesses
ELECTRICAL INSTALLATIONS & BOOTHS
Approach to DB, Panels, Switches kept clear
1
2 Fire extinguishers installed at an easy accessible location.
Welding cables and power cables are routed separately.
3
Routing of cables are done properly to avoid obstruction
4
&tripping hazards.
Floor of electrical booths kept dry.
5
6 Rubber mats are in place at electrical panels.

Page 1 of 2
Document KECIIMS/EHS/07/F/50
No.
Issue. No. 02 Rev. No. 00
CHECKLIST FOR SITE
KEC HOUSEKEEPING Issue. Date 08-12-2018 Rev. Date 00-00-00

Page No. 2

ACTIVITTES OBSERVATION REMARKS


SR NO
STORES
1 Walkways, entry and exits kept clear.
2 Materials placed on racks are safely accessible.

3
Compressed gas cylinders are segregated as full or
empty and type of gas.
Verticaly stored cylinders are secured / chained to
avoid toppling and horizontal once guarded against
rolling down.
Flammable storage areas are isolated from store,
5 office and work areas.
6 Cement bags are stacked in proper gradient safely.
Corrosive material (e.g. acids, alkalis) are stored
7 away from other material and kept on collection trays
to safeguard against accidental leakage.
8 Storing area for lifting tools &tackles, ropes, wire
ropes & PPE is dry, clean &free of corrosive material
Easy accessibility to installed fire extinguishers
9 ensured in store.