Checklist for Equipment Inspection Power Sub Distribution Panel

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Checklist for Equipment Inspection Power Sub Distribution Panel

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Name: Checklist for Equipment Inspection

Project Code:
Checklist No. …………
Date:
Make:
Model:
Hired Contractor

Equipment Name & Number: 18-POWER/SUB DISTRIBUTION PANEL &


Note: Please write Yes or No in the given box and if some comments write in remarks column.
SN. Description Yes/No Remarks
1. Physical condition of panel should be good & sound. #
2. Panel should be kept on suitable stand. #
3. Junction boxes should be free from defects. #
4. All connection should be taken through ELCB/RCCB/MCB. #
5. Connection socket should be covered with auto lock.
6. Switches and display should be properly covered.
7. A danger signage should be marked.
8. Panel should be grounded as per IS 3043:1987. #
9. Further connection for extension of cable should be taken #
through male-female connector.
10. In case of flammable atmosphere single length cable shall
be use.
11. Canopy should be provided to avoid water getting entered #
due to rain or any other means.
12. Rubber mat should be provided to stand during operation. #
13. Input power cable should be free from defects.
14. Power input and output cable should be passes through #
glands.