ACTION-PRIORITY MATRIX
A key to successfully managing your tasks and activities, especially during a crisis, is having the skill to choose and
prioritise your activities wisely and focus your energy where it can be most impactful. We all have the same 24
hours in a day and much of our productivity lies in our ability to effectively sort through a long list of tasks and
requirements from multiple sources which all seem to be urgent and important.
However, if you choose your priorities poorly, you could easily find yourself having to constantly put out fires, being
stretched thin on important deadlines or being bogged down in low-yield, time-consuming tasks that stop you from
moving forward.
The Action Priority Matrix is a simple planning technique that helps you choose which activities to prioritise (and
which ones you should drop) in order to maximise your time, effectively manage your workload and respond to
changing priorities.
By plotting each activity on the Action-Priority Matrix, you can quickly see the tasks/projects that “steal” your energy
and time and those that could give you the greatest return on your efforts.
Action Priority Matrix
10
To use the matrix, make a list of your ongoing
activities and goals. Score each task on impact
and effort, using a 0 to 10 scale.
10
STEP 2 – SCORE THE ACTIVITIES ON IMPACT AND EFFORT AND PLOT THEM ON THE MATRIX
Score the list of activities on impact (from 0 for no impact to 10 for maximum impact) and on effort involved
(from 0 for no real effort to 10 for major effort). Tasks that are high on impact are those with long-lasting
consequences or results. One way to evaluate the impact of a task is to ask yourself the following questions:
“Will the project or clients suffer if this task isn’t done?” and/or “Does others’ work depend on me completing
this task?” On the other hand, high effort tasks are tasks that tend to require recurrent focus and long
completion windows (time).
High impact - high effort tasks require proper planning and may also require additional resources
(delegating, project planning tools). These are the things you usually never get around to doing, because
they’re too hard, and there’s so much noise and operational need in between. The general rule for this group
is to schedule time to work on these tasks. Putting them off will just bump them up until they become urgent,
or are never addressed. You should probably have only a small number of tasks listed here. Do not leave
such tasks until the last minute.
Low effort - low impact tasks are referred to as “filler” tasks as you would only tackle those as and when
you have spare time. Since the impact is low they do not require immediate action, but because the effort is
also low it can create a sense of achievement when those boxes do get ticked. Activities or tasks that fall into
this category can easily serve as distractions. Eliminate these or leave them for later.
Low impact - high effort tasks should be re-evaluated and probably dropped if you are unable to automate
them. By deciding to drop or at least postpone these tasks to a later time you are able to lower your anxiety
(as the immediate task list is reduced) and free up your time to focus on more high impact activities and
projects.
ADDITIONAL TIPS
Keep Stakeholders informed. As tasks move up and down the priority ladder, don’t not forget to keep
everyone up to date on the changes and how they impact the project deliverables and timelines.
Compile a plan and tracker of your tasks and update regularly
Be mindful of optimism and wishful thinking. Be realistic in your appraisal of your tasks, especially when performing
it for the first time. To mitigate this, consider three things: First, how much time would you need to complete a task
if everything went as well as it possibly could? How much time would you need to complete a task if everything
went as poorly as it possibly could? Finally, based on your answers to the above two questions, work out the
average time required for this task.
Be mindful of inaccurate recollection of the time similar tasks took in the past. The best predictor of how much
time it will take you to complete as task is to look at past results as accurately as possible. Ask yourself the following
questions and answer them as honestly as possible: “How much time did this specific task take me in the past?
What other factors could have influenced my time-frames? e.g. Did I receive additional help from team members in
order to meet the previous deadline? Was I working on a different system which I am more familiar with? Was I
working simultaneously on other projects at the time, which may have slowed down my progress?”
Be mindful of over-focusing on execution and completion. Do not get fixated on task duration and getting the task
completed as quickly as possible, at the expense of the quality. Remember: your output should be about accuracy,
completeness and consistency and NOT JUST TIME.
Be mindful of underestimating of the occurrence of random events. It is almost always never smooth sailing,
therefore your plan must incorporate time for random events such as falling ill and being booked off work for a
period, or perhaps something more urgent and important comes up and you are required to re-direct your efforts
for a while.
Be mindful of scaling issues. As the size of the project increases our ability to accurately project its duration
decreases. When the complexity of a project increases or project actions multiply over time, ensure you re-adjust
your project time-frames accordingly.
If you have any further questions, please do not hesitate to consult your regional
Organisational Effectiveness Specialist.