0% found this document useful (0 votes)
11 views1 page

40 rules

Uploaded by

Billal Rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

40 rules

Uploaded by

Billal Rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

10/19/24, 1:42 AM Activity | Debesh kumar | LinkedIn

Comment

Repost

Send

Debesh kumar • 2nd Following


Manager - NQA (Snowtex Sportswear ltd)
1yr •

Md Sohag Hossain • 2nd


Ex Human Resources Department at Fakir Fashion Ltd. Follow
1yr •

গার্মেন্টস ফ্লোরের জন্য ৪০টি প্রয়োজনীয় সূত্র জেনে রাখুন


01. Target = 60 ÷ ( SMV x No. of worker x working hour x expected efficiency)
.
02. Target = 60÷SMV.
03. Team target =(60÷SMV)x Present operator x Organization efficiency .
04. Target per day = Working hour x 60 x No. of operator / Target SMV.
05. Capacity=Average of total obserb time x 1.66 + 30% Allowance / 60.
06. Factory capacity=No. of operator x working minutes + Present % x
average factory efficiency.
07. Capacity per day = Present operator x working hour x organization
efficiency x Attendance.
08. Weekly capacity = No. of operators x Absenteesm x Clock minutes per
week x Average factory efficiency.
09. Marker efficiency = Area of patterns in the marker / Total area of the
marker x 100.
10. Load = (Contract size x work content) contract 1+ (Contract size x work
content)
Contract 2 + etc.
11. Load = Order quantity x Work content (SMV of garments).
12. Observe time = Total cycle time / No. of cycle.
13. Basic time = Avarage of observe time X Rating %.
14. Sam = Basic time x Allowance.
15. Rating = Observe time x Standard rating / Standard rating.
16. Cycle time = 60 / Team target.
17. Pitch time = Total SMV / Present operator.
18. Efficiency = Earn hour / Available hour x 100
19. Efficiency = SMV / Total time.
20. Earn hour = (Production x SMV) / 60.
21. Available hour = Working hour x Use machine(Total manpower)
22. Performance = (Earn hour / Available hour – Off standard time) x 100.
23. Improvement = 1-(Production / Capacity).
24. Balancing efficiency = 1-Balancing loss.
25. Loss pcs = (60/SMV)x Available hours x avg factory effi (61%) -Q.C Pass
26. Balancing loss = AML-TML/AMLx100.
27. Standard time = Net operation time x (1+ Ratio of loss time).
28. Daily output = Working hours (seconds) + Standard time.
29. Output per operator = Work hours (second) / Total time of operations.
30. Required No. of operators = Targeted daily output / Daily output per
operator.
31. Target daily capacity = Daily work hours / Standard process time (SPT).
32. Daily capacity per worker = Daily capacity / No. of workers = Daily Work
hours / Standard total processing.
33. Organization efficiency = Pitch time / Bottle neck process time (x100) =
100/140 x 100 = 71.4%
34. Upper limit = Pitch time / Target organization efficiency = 100 / 0.85 =
117.6 seconds.
35. Lower limit = 2 x Pitch time – Upper limit = 2 x 100 – 117.6 = 82.4
seconds.
36. Planned daily work flow = Daily work hours / Standard process time (SPT)
x organization efficiency.
37. Accumulated avarage time = Daily work hours/AccumulatedxNo.of
daysxstandard No.of workers in
The group/No. of pieces produced.
38. SMV = Basic time + Allowance time + bundle time.
39. DHU = No. of deffect observe / No. of garments checked.
39. Booking fabric K.G. = Order quantity / 12 x Fabric consumption per doz.
40. Garments K.G. = Total receive fabric kg – (Save return kg + Jhute kg +

https://www.linkedin.com/in/debesh-kumar-364495102/recent-activity/all/ 4/7

You might also like