(mean girth)

Scanned by CamScanner
(mean girth)

( The 3 m is height of the


building to common level.
If the building is gabled,
you will have to find the (The 67.83m is the
areas of the triangular total length of
gables as 1/2 x b x h) and partition walls)
this to the total walls area)

Scanned by CamScanner
Note that for plastering and painting
are calculated in the same way as
superstructure walling. However,
plastering are can be roughly twice the
area of walling as walls are plastered on
both sides i.e two sides. So for interior
partition walls , multiply the plaster area
you get by 2. For external walls, you
may calculate the outside and inside
plaster separately. Painting is done on top of
plaster. See here all openings i.e doors and
windows are deducted.

Scanned by CamScanner
Scanned by CamScanner
Floor finishings and ceilings are
calculated as areas with all the
necessary work description

Scanned by CamScanner
Skirting and cornice ( the part
between ceiling and walls just like
the way skirting is between floors
and walls) are calculated in length
with their size being described.

Scanned by CamScanner