Incor Newsletter q

Gggggggghhhhh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

S.

Tower A
Activity Work Progress
No Oct-24 Nov-24

Terrace Works - 80% completed Terrace Works - 85% completed


Mentioned approxmated
OHT Works - 90% completed OHT Works - 95% completed
Structure work progress 5%, eeven
1 LHT Works - 95% completed LHT Works - 95% completed
Works we don’t know about the
Water Proofing Works - To start Tanks Water Proofing - Preparatory
work realy going on.
Parapetwall Wall Works - Completed works started

Block work floors wise status : Block work Floors wise status :
a. 3rd to 23rd floor block work a. 3rd to 23rd floor block work
Completed. Completed.
b. 2nd and 1st floor 80% block work b. 2nd and 1st floor 90% block Block works only 80%
Brickwork completed. work completed. canged as 90%, but no
2 & Plastering work floor wise status : Plastering work floorwise status : works going on.
Plastering a. 18th to 12th floor, 6th to 10th a. 18th to 12th floor, 6th to 10th Plsting Works no changes,
floor plastring works completed. floor plastring works completed in progress.
b. 2nd, 3rd, 4th, 5th,11th floor and b. 1st to 5th floors, 11th floor and
19th floor Plastering works in 19th to 23rd floors Plastering works
progress. in progress.

Water proofing works floor wise


status :
a. 7th to 19th floors completed
Water a. 18th, 17th, 16th, 15th, 14th,
3 b. 2nd to 6th floors water proofing still progress
Proofing 13th, 9th, 7th, floors completed.
works in progress.
b. 12th, 11th, 10th, 8th, 6th, floor
water proofing works in progress.

18th floor- 90% Painting works Only 18th Floor took 4


18th Floor putty works 80% completed. months to complete, No
4 Painting completed. 1812,1816 flats are 100% Works going on. Still not
Sanding works in progress completed. started other floors.
17th floor - Putty works in progress.

a. 18th, 17th, 16th corridor flooring


a. 18th, 17th, 16th corridor flooring
completed, 15th
completed, 15th floor in progress.
floor in progress.
b. 14th to 18th floor flat tiling works
5 Flooring b. 13th to 18th floor flat tiling works No work progress
completed.
completed
c. 13th and 12th floor flooring works
C. 12th & 19th floor flooring works
in progress.
in progress.
18th floor windows 95 %
Doors & 18th floor windows 95% completed,
6 completed, Doors installation works No work progress
Windows Doors installation works in progress.
in progress.
CP &
7 Sanitary Starts from Nov-24 Starts from Dec-2024 Still not started
Works
18th, 17th & 16th floor fire fighting 18th, 17th & 16th floor fire fighting
Fire fighting
8 piping works piping works No work progress
works
completed completed. Further floors started

9 Podium 60% podium slab completed. 90% podium slab completed


Not unestand, 23 floors
Basement slab 90%
10 Basement Basement slab 85% completed raised without basement
completed
completed.
UG Tanks & UG Tank completed. UG Tank completed
11 No work progress
STP Works STP in progress STP in progress
Plumbing
12 No Information No Information No Information
Work
13 Lift Work No Information No Information No Information

14 Road Work No Information No Information No Information


Electrical
15 No Information No Information No Information
Works