0% found this document useful (0 votes)
32 views2 pages

Cost Estimation Exam

Uploaded by

momagrabi77
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

Cost Estimation Exam

Uploaded by

momagrabi77
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Cost Estimation Exam

Answer The Following Questions


Write the right expression for the following: [ 5 Marks ]
o Revenues Minus Expenses.

o Allocating the overall costs estimate to individual work items to establish base line for measuring performance.

o Site Expenses & Office Expenses.

o Materials & Labors Costs.

o Technical Package that include all plans , specifications & BOQ.

Complete The Sentences: [ 5 Marks ]


o Rough Of Magnitude Estimation Considered As Class No. ……………………......………. Or Class No. ...................................

o Cost Estimation With Accuracy +10/-10% Considered As Class No. …………………………….……….……….…………………………..

o Budgetary Cost Estimation Accuracy Between ………………………………………………………………..…………………………………..…….

o ……………………………… offers include all costs till delivery to destination.

o ……………………………... offer include only manufacturing & packing costs.

State True Or False: [ 5 Marks]


o Preliminary Cost Estimation Can Cancel Projects.

o NPV Depend On Construction Cost Estimation Results.

o Design & Specifications level depend on project type.

o Using Bus ways instead of cables always increase costs more than 70%.

o In Lump Sum Contacts, payment are based on actual installed quantities.


Cases Studies: [ 35 Marks ]

o State steps that should be taken if you cost estimator for lumpsum project. [ 5 Marks ]

……………………………………………………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………………………………………………

o If you have an item with QTY.250, but installed 300 – so contractor payment will be based on which quantities if

contract was remeasured or lump sum. [ 5 Marks]

…………………………………………………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………………………………………………….

o For Administration Building we are working on in shop drawing module: [ 15 Marks]

Support your answer with needed comments or documents.

▪ Average Length for Lighting Outlets Will Be:

…………………………………………………………………………………………………………………………………………………………………….

▪ Average Length for Fire Alarm Outlets Will Be:

…………………………………………………………………………………………………………………………………………………………………….

▪ Average Length for Data Outlets Will Be:

…………………………………………………………………………………………………………………………………………………………………….

o Create a break down sheet without prices for below items: [ 10 Marks]

▪ Fire Alarm Outlet.

▪ Panel Board.