Observation
In 15% design & Procurement audit reports the Minor NC Ref 1682/1639 was closed
without objective evidence in March 2024 however, the supporting documents
were signed in July 2024.
Moreover, Engineering PQI and delayed reasons where not addressed properly
during external audit reporting, as well as no nonconformity was issued for
engineering PQI not conducted since beginning of the project.
The approved batch plant and mix design information is missing from MQMR
The RTR Pipe Works (nonmetallic installation procedure) was not approved and
Contractor already demobilized the RTR QC and have only 9 RFI’s raised for
inspection.
The PQPs revisions (including Organization charts) are not approved by Company.
The submitted revisions of PQP is not submitted within 21 days after the effective
date of Contract (February 2023) and Subsequent submittals to COMPANY within
seven (7) calendar days for any significant changes and no notification is issued
from company.
The risk register in PQP appendix 04 is not addressing the requirements of ISO
9001:2015.
The attached ISO 9001:2015 certificate was expired on June 21, 2024
Management review results are not submitted within 14 days for MRM-01 without
any violation from company.
MRM-02 was delayed for 2 months without any justification and violation from
company.
Materials and equipment preservation status and logs are not included in the QMR.
The heat treatment procedure is not included in the list of QMS procedures in PQP.
Contractor did not submit any customer satisfaction to determine and evaluate the
degree of COMPANY’s satisfaction through quarterly evaluation of COMPANY
assessments.
Contractor did not attach or develop the training program to introduce and
familiarize all CONTRACTOR and sub-contractor personnel with the project quality
requirements for their area of responsibility for every month.
Geotechnical Engineering report conducted for the Project does not bear
Geotechnical File number.
Request For Approval (RFA) Appendix A was not submitted to Quality Team
supervisor for Concrete Mix Design approval.
Tanks F-9063 and F-9064 Ring beam was constructed based on an "Issued for
Approval" (IFA) drawings, rather than a fully approved design (IFC).
The absence of the Reinforcing bars schedule and bending details IFC (Issued for
Construction) is missing nor issued by engineering.
Fabrication and bending were conducted on Site fabrication not meeting the
requirements.
Source of supply for backfill materials does not have approval from PMT/PID.
Bund walls for Tank 9063-9066 foundation details, Structural fill compacted
thickness below foundation shown on the IFC is only 400 mm not meeting the
requirement.
Control of drawings is given instructions in writing by Contractor and PMT.
Contractor shall adhere to Field Engineering change procedure.
The protective coating on the ring wall foundation started flaking due to direct
sunlight exposure.
Reference
ISO 9001:2015.
General
Schedule Q
SAEP-407
Schedule Q para 5.12.
PQP appendix 03
PQP appendix 03
Schedule Q attachment V.
PQP
SAEP-1152
SAEP-343
SAES-H-200
CONTRCTOR REPLY
Kindly re review the document as the dates of the reports to close the
NCR are combatable with the sequance of the closure.
this activity was in an existing damadged RTR line not in the project
so contractor provided a temporary RTR QCI for repairing the line
through those 9 RFI’s only.
The New Revised in next January 2025 will be reviewed and signed
for approval by Company
already the situation was remedied, the PQP was issued, work began
and it was updated to (Rev 4)
The New Revised in next January 2025 will include the risk register in
PQP
The first time the meeting was held without the presence of the
company's Quality Control Manager. Therefore, the meeting was
repeated and the deadline for sending the report was remedied.
The first time the meeting was held without the presence of the
company's Quality Control Manager. Therefore, the meeting was
repeated and the deadline for sending the report was remedied.
The New Revised in next January 2025 will be added The heat
treatment procedure
INCR log in the MQMR is only for each month individually and the
mentioned INCR was in defferent month.
it was updated and once we have new subcontractor will be
reflected
MSA will be submitted to PMT for approval and the material was
tested and found follow the requirements .