0% found this document useful (0 votes)
27 views3 pages

Adobe Scan 31 Dec 2024

Uploaded by

singhgauravabes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views3 pages

Adobe Scan 31 Dec 2024

Uploaded by

singhgauravabes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

71328/2023/O/o CAO/CON/GKP/NER

GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
*****
No. 2023/W-l/NER/DUFLS/MULTI-TRACKS
New Delhi, dated: 17.10.2023
The General Manager,
North Eastern Railway,
Gorakhpur

Sub: Final Location Survey (FLS) for Multiple Trac


ks in North Eastern Railway.
Ref: CE/C/NER's letter No. W/Con/348/FLS/NL/D
05~ 10.2023. L/Third Line/3rd & 4th line/Survey dated

Sanction of competent authority is hereby comm


unicated for taking up Final Location
Survey (FLS) for below mentioned works at the cost
of Rs. 11.44 crores (Rupees eleven
crores forty four lakhs only):

SN Proposal -
Plan head Length (KM) Cost
-

l Sitapur City Junction-Sitapur Junction (In Lakhs)


3rd and 4th line DL 08.00 Km 16.00
....., Burhwal Junction-Sitapur Junction 3rd
DL 176.00 Km 352.00
and 4th line
3 Burhwal Junction-Jarwal Road 4th line
DL 16.00 Km 32.00
4 Jarwal Road-Gonda Junction 4th line
DL 46.00 Km 92.00
5 Gonda Junction-Mank3pur Junction 3rd DL 56.00 Km 1}2.00
and 4th line
6 Basti-Mankapur 3rd line DL 61.00 Km 122.00
7 Basti-Khalilabad 3rd line DL 30.00 Km 60.00
8 Domingarh-Gorakhpur 4th line DL 05.00 Km 10.00
9 Gorakhpur Jn.- Gorakhpur Cantt. 4th line DL 04.00 Km 08.00
10 Gorakhpur Cantt.-Kusmhi 4th line DL 11.00 Km 22.00
11 Baitalpur-Deoria Sadar 3rd line DL 07.00 Km 14.00
12 Oeoria Sadar-Bhatni Junction 3rd line DL 2t.00 Km 42.00
13 Bhatni Junction-Siwan Junction 3rd line DL 49.00 Km 98.00
14 Siwan Junction-Duraundha Junction 3rd DL 18.00 Km 36.00
line

Page 1 of2
t e

328/2023/O/o CAO/CON/GKP/NER

15 Duraundha Junction-Kopa Samhota 3rd DL 33.00 Km 66.00


line
16 Chhapra Junction-Chhapra Kacheri DL 04.00 Km 08.00
.Junction 3rd and 4th line
17 Barabanki-Burhwal 3rd line DL 27.00 Km 54.00
Total- 1,144 Lakhs.

2. The expenditure is chargeable to the Demand No. 85 - "Major Head 3001- Indian Railways
Policy Formulation, Direction, Research and other Misc. organizations- (Miscellaneous
Expenditure_General -Annexure 'A'- Surveys".

3. This issues with the concurrence of the Finance Directorate of the Ministry of Railways.

( pSinJ~
Director/Gati Shakti (Civil)-1,
A~>

Railway Board
No. 2023/W-I/NER/DL/FLS/MULTI-TRACKS New Delhi, dated: 17.10.2023
Copy to:

(i) The Principal Financial Advisor, North Eastern Railway, Gorakhpur.


(ii) The Principal Director of Audit, North Eastern Railway, Gorakhpur.
(iii)The Deputy Comptroller and Auditor General of India (Railways), Room No. 224, Rail
Bhavan, New Delhi. ';;
. \ .. A>\{_t,Y>"v
for Member (Fina~ ~1,ay Board
Copy forwarded to:
(i) Chief Administrative Officer/Const., North Eastern Railway, Gorakhpur.
(ii) ED(GS)F, JD{GS)F, WDO and Budget branches of Railway Board.

Page 2 of2
·N, E. aanm·
.' ,· . .
oftice of the
Chief Administrative Officer/Con.
Gorakhpur
Dated: f %.09..2024
. No- f'LS'NER/DY· CEfCon-l/CKP/3Nl-4th line

To.
'. F,ll'rOjecb.
CE ...__
North £15feMI Ra1t,T•Yt
LvdaNI"·

d
Sllb: Regarding aliga~_~i o~ J.~tt Ua·e b.etween_ ·-~•lf·ril-~iradei and Duraur1 f:t:-i-
·Keps Samtao·ta ~e.c_tio1l-:· . •. •

Ref: Raihvay. ,Board's l~~er .:~-~--2~~~lW-ll~ERlDL/FLS/MULTI-TRACKS dt.


rr. 10.2023 .(copy enclosed)',·

RaHw•y Bo~r~ in a?ove::reftrred fetter, have··s~nctioned the~F'inal Loc.~tion


Survev for 3~4 Jine-in the sectign. ·of Bhafi:li.;Siwan •s-iw-an~Dur~undha and Duraundha-- 7

Kopa Samhota se_ctioJJ. As -j,~t. :the: R~Hway ~9'ard1·s .g_u{de.li'nes, field survey has been
completed i~-~ th~ _se.~tiqn ~t Qh:at'ii-i-iZfradei .section. -a_nd. Duraundha-Kopa Sambota
section. Tbe.. alipinen:1 of- l~d-1iJ;J.~-- i-11: :tli~se sections 'are kept on· the north side of
xistingtract. A~c~i'dingly~: the-Con·ceptuarY~rd-Plan"s of Bhatni to Jiradei secton and
uraundha-Kopa- ~·amhota ·sectio"il_··have .been prepared and submitted to ·varanasi
~visio~. C~~~~ptual Y~~-P~_ar,i.~ 9! B~atni to ~ir~dei section have been approved from
~as• D1!,~10_0.. So., It. ~s{:<J~e~ted ~?· ~J:an. i_n the~~f~~ct:ions with due consideration·
.!'11pment .or pr~p9.~4. 3 •• l01e..:: l'hls, 1s for Y,(!~r ~(nd info.rmation and necessarv •• ~
:,·.;, ~ please:. ..
.:, ;;

,. ~.
--~~· ~

\ ,I • ' . ~i#)~
...
r,

;•
·,.
v---~\
Dy. CE-/Co~-1
Gorakbpur

,,

·,. .. " ..
.. • • ·~ .... :~. • ·. .••. . ·-~-.: ... --.. -~ .......... •
~. . : '. ~. ~, . •· , , • .