Check list for getting approval for installation of new fuel station along state Roads
1. General information
Mauza-Kerap , Thana-Rafiganj,
Bihar
(As applicable)
CHECK LIST-2
Check list for getting approval for Installation of new fuel station along state Roads
A-For Fuel stations on existing service roads/slip roads
Measurement Whether comply
Sl. No Item Norms
at stie with norms
1 Whether the fuel station is on service road/Slip road (and Yes
not on the entry/exit ramp of service/Slip Road) yes
Yes
2 i) Size of plot in Rural stretch As per Oil company Yes
35x35 requirement
ii) Size of plot in urban stretch
N/A
iii) Size of plot in hilly and mountainous stretch
3 Whether the fuel station satisfy the general condition of
sitting access conditions, drainage, building line, sign
yes Yes Yes
boards etc.
depending upon the availability of road
B- Fuel stations in Rural Stretches
Measurement Whether comply
Sl. No Item Norms
at stie with norms
1 Acceleration lane N/A Minimum 100m
2 Deceleration lanes N/A Minimum 70m
3 Distance of intersection with any category of road and
median gap:
(Carriageway having width 5.50m or more and road length
minimum 300m or more either of Bituminous/ Concrete/
interlocking Concrete block shall be treated as intersection,
irrepective of the category of road)
Plain and rolling terrain 500m 300m Yes
Hilly and mountainous terrain N/A 100m
4 Any Barrier inluding Toll Plaza/Railway level crossing N/A Minimum 1000m
Distrance from the start of approach road of road over
N/A
5 Bridge (ROB) Minimum 200m
6 Distrance from start of Grade separator/ Fly over N/A Minimum 300m
7 Distance from nearest fuel station: Undivided carriageway Undivided carriageway 300m Yes
(for both sides of carriageway) and divided carriageway Divided carriageway 100m
(with no gap in median at this location 6000m
21 (i) provision of drinking water and toiled facilities along yes As per Drawing Yes
with proper display baord at the entry to fuel station.
(ii) provision of proper drainage arragement for fuel station yes As per satisfaction yes
premises.
22 Provision of adequate signs and marking as per the Yes As shown in the drawing Yes
drawings.
2 Any barrier including Toll plaza/ Railway level crossing Minimum 1000m Yes/ No
3 Distance from the state of approach road of Road over Yes/ No
Bridge (ROB) Minimum 200m
4 Distance from start of Grade separator/ Fly over Minimum 300m Yes/ No
Distance from nearest fuel station. Undivided carriagey way Yes/ No
5 (For both sides of Carriageway) Minimum 300m
6 Provision of Service/ Connection Road Necessary at claustering of
fuel station/intersection with
any category of road less than
300m
(i) Length of the servie road including declaration and Mention the length in m
acceleration lanes for regulating entry to / exit from
proposed fuel station.
(ii) Whether additional land acquisition is required beyond
the avilable ROW (to accommodate service roads.
Deceleration/acceleration lances, etc,)
(iii) If yes, mention the additional L.A required to be done
by the owner of the fuel station
(iv) Whether additional land acquisition is above beyond the Yes/No/ Not
available ROW (to accommodate such service applicable
roads,decelaration/acceleration lands, etc.) has been done by
the owner of the fuel station.
(v) If yes, whether the documentray evidence of the L.A. Yes/No
details are attached
7 Gradient of road section Maximum 5% Yes/No
8 Slope of fule station premises/Service Area for drainage Maximum 2% Yes/No
purpose N/A
9 Length of Buffer Strip Maximum (12 m plain) Yes/No
Maximum (5 m Hilly) Yes/No
10 Width of buffer strip extending inside the fuel station plot Minimum 3m Yes/No
beyond the available ROW
11 Heigth of curb for buffer strip Minimum 275mm Yes/No
12 Radius of truning curve Minimum 13mm Yes/No
13 Radius of Non-turning curve Minimum 1.5m Yes/No
Maximum 3m
(i) Whether additional land acquisition is required by the Yes/No
side of ROW (to provide prescribed truning radius by the
owner of the fuel station
(ii) If yes, mention the additional L.A required to be done by Mention Area Sqm
the owner of the fuel station
(iii) Whether additional land acquisition as above is required Yes/No/ Not
by the side of ROW (to provide prescribed turning radius applicable
has been done by the owner of the fuel station.
(iv)If yes, whether the documentary evidence of the L.A Yes/No/ Not
details are attached. applicable
14 Minimum downward slope of access roads towards the fuel Minimum 2% Yes/No
station
15 Difference in level between the road and fuel station and Minimum 300mm Yes/No
access area measured at the edge of the shoulder in the road.
If is certified that fuel station is neither operational nor energized and that the construction of the fuel station has not been commenced.
Further we bear full responsibility and genuineness of the site particulars mentioned above and for adherence to the stipulated norms.
It is further undertaken that fuel station shall not be energized till final NOC is granted by RCD
Note, If norms are not satisfied detailed explanation needs to be given otherwise application will not be considered. In all cases
supporting documents as per Annex-1 have to be submitted otherwise the case will be summarily rejected.
The above particulars along with the drawings and documents have been verified and are certified as correct as per prevailing site
conditions.
The right of way (ROW) availabe at proposed loacation from center line of the nearest carriage way is (9.45 )m.
I am satisfied with the field report of JE and AE I have also examined the particulars filled in above and found the application
in order and in compliance with State Govt. Guilelines of setting up fuel stations along RCD roads. The provisional
Permission/NOC is being recommended.