KPI - Presentasi Weekly_SITE W49
KPI - Presentasi Weekly_SITE W49
KPI PLANT
WEEK 49
PLANT/EQUIPMENT PERFORMANCE
PHYSICAL AVAILABILITY MTBF
WTD MTD YTD WTD MTD YTD
LOADER LOADER
PLAN ACT % PLAN ACT % PLAN ACT % PLAN WH ACT % PLAN WH ACT % PLAN ACT %
XE490DK-1-2 92% 94% 103% 84% 94% 112% 88% 87% 100% XE490DK-1-2 100 679,3 75 75% 100 679,3 75 75% 100 88 88%
PC400LCSE-8 92% 100% 108% 85% 100% 118% 91% 97% 106% PC400LCSE-8 100 470 470 470% 100 470 470 470% 100 777 777%
PC300SE-8M0 92% 89% 97% 90% 89% 99% 90% 93% 103% PC300SE-8M0 100 572 82 82% 100 572 82 82% 100 671 671%
PC300SE-8M0_ CRU 88% 78% 89% 90% 63% 70% 86% 85% 99% PC300SE-8M0_ CRU 100 203,4 51 51% 100 203,4 51 51% 100 40 40%
HAULER PLAN ACT % PLAN ACT % PLAN ACT % HAULER PLAN WH ACT % PLAN WH ACT % PLAN ACT %
XGA3250D2WC 87% 93% 106% 89% 94% 107% 88% 92% 105% XGA3250D2WC 100 3432,7 127 127% 100 3432,7 127 127% 100 136 136%
FM260JD 84% 90% 107% 85% 99% 116% 84% 91% 108% FM260JD 100 953,9 191 191% 100 953,9 191 191% 100 114 114%
UNIT SUPPORT PLAN ACT % PLAN ACT % PLAN ACT % UNIT SUPPORT PLAN WH ACT % PLAN WH ACT % PLAN ACT %
XE215C-1-2 89% 92% 103% 87% 73% 84% 88% 75% 85% XE215C-1-2 100 320 46 46% 100 320 46 46% 100 63 63%
PC210-10M0 92% 99% 108% 88% 99% 114% 92% 96% 104% PC210-10M0 100 128,6 129 129% 100 128,6 129 129% 100 319 319%
D85ESS-2 82% 90% 109% 88% 90% 102% 89% 91% 102% D85ESS-2 100 804,5 80 80% 100 804,5 80 80% 100 129 129%
GD535-5 93% 62% 67% 90% 67% 74% 90% 93% 104% GD535-5 100 67,7 68 68% 100 67,7 68 68% 100 297 297%
GR2605 II 0% 0% 0% 0% 0% 0% 40% 42% 104% GR2605 II 0 0 0 0% 0 0 0 0% 100 45 45%
GD705-5 93% 84% 90% 87% 84% 96% 88% 80% 91% GD705-5 100 95,9 96 96% 100 95,9 96 96% 100 43 43%
LW1200K 90% 99% 110% 95% 99% 104% 68% 49% 72% LW1200K 100 93,8 94 94% 100 93,8 94 94% 100 31 31%
WA500-6R 93% 100% 107% 91% 100% 109% 94% 99% 106% WA500-6R 100 133 133 133% 100 133 133 133% 100 382 382%
BW211D-40 49% 58% 118% 90% 47% 52% 91% 84% 93% BW211D-40 100 122,2 31 31% 100 122,2 31 31% 100 174 174%
Hrs
800 680
GD535-5 64 100% 0 100%
600
GR2605 II 0 0% 168 100%
400
GD705-5 27 97% 1 3%
200
LW1200K 0 0% 1 100% 0 0 0 0 0 0 0 0 0 0
0
WA500-6R 0 0% 0 0% D00 D01 D02 D03 D04 D05 D06 D07 D08 D09 D10 D11
BW211D-40 7 3% 206 97% Dur 1516 0 0 0 680 0 0 0 0 0 0 0
TOTAL 204 32% 439 68%
30 25 2
2
20 1,5 20 1,5
1 Dur (Hrs)
1 15
10 1 Freq
0,5 10
0 0 5 0 0,5
38,12 1,47 2,27 1,33 0,00
PREVENTIVE 0 0
AC SYSTEM ELECTRICAL SYSTEM GET HYDRAULIC SYSTEM
MAINTENANCE WORK EQUIPMENT ENGINE HYDRAULIC SYSTEM AC SYSTEM
Dur (Hrs) 48,85 9,93 2,83 0,92 4,77 Dur (Hrs) 38,12 1,47 2,27 1,33 0,00
Freq 4 4 3 1 1 Freq 3 3 2 1 0
Dur
10 2 2 100 6
Dur
2 100,00 30,00
1,5
1 50,00 20,00
1
0 0,00 0,5 10,00
TRANSMISSION PREVENTIVE MAIN FRAME /
ELECTRICAL SYSTEM STEERING SYSTEM 0 0,00
SYSTEM MAINTENANCE CHASSIS / VESSEL PREVENTIVE MAINTENANCE AC SYSTEM WORK EQUIPMENT
Dur (Hrs) 211,47 16,37 17,68 3,00 0,50 Dur (Hrs) 48,60 21,63 1,82
Freq 4 3 2 1 1 Freq 3 2 1
BW211D-40 • Beraing Drum Broken, Tensioner and Water pump • Wait part Open
Pareto Problem Redo Section A2B Pareto Problem Redo Section DT Pareto Problem Redo Section Support
Freq Vs Durability Freq Vs Durability Freq Vs Durability
2,5 35 25 1,2 1 1
2 30 20 1
25
0,8 0,8
15 0,8
1,5 20 0,6 0,6
0,6
1 15 10
0,4 0,4 0,4
10 5
0,5 0,2
5 0,2 0,2
0 0 0 0
ELECTRICAL WORK HYDRAULIC ELECTRICAL HYDRAULIC
AC SYSTEM ENGINE AC SYSTEM 0 0
SYSTEM EQUIPMENT SYSTEM SYSTEM SYSTEM AC SYSTEM
Dur 30,9 30,1 22,1 20,6 20,2 "Dur" 19,3 10,1 0 0 0 Dur 0 0 0 0 0
Freq 2 1 1 1 1 Freq 1 1 0 0 0 Freq 0 0 0 0 0
% Tase
5000
MODEL UNIT TYPE TYRE 4000
$0,08
PLAN ACTUAL % PLAN ACTUAL % 3000
2000 $0,04
1000
COMPACTOR 23.1-26 3500 3500 0
WEEK 45 WEEK 46 WEEK 47 WEEK 48 WEEK 49
$-
% Tase
$25,00
50% $20,00
40%
30% $15,00
20% $10,00
10% $5,00
0% $-
WEEK 45 WEEK 46 WEEK 47 WEEK 48 WEEK 49
COLOR INDICATOR = 100% ≤ X <105% PLAN 80% 80% 80% 80% 80%
ACT 32% 29% 26% 35% 52%
= ≥ 110% = 90% ≤ X <100% PLAN CPH $22,88 $22,88 $22,88 $22,88 $22,88
= 105% ≤ X < 110% = < 90% ACT CPH $27,52 $25,57 $22,38 $29,90 $34,32
40
40%
20
20%
0 0%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Actual 25 16 13 21 26 26 24 21 24 27 14 3
Day 31 29 31 30 31 30 31 31 30 31 30 31
Ach 81% 55% 42% 70% 84% 87% 77% 68% 80% 87% 47% 10%
Dev 19% 45% 58% 30% 16% 13% 23% 32% 20% 13% 53% 90%
80
60%
60
40%
40
20 20%
0 0%
Hauler Support Mainroad Wheel Loader
Plan 122 8 6 2
Act 119 8 6 1
Ach 98% 100% 100% 50%
Rp300 1000%
Rp200 508%
211% 500%
Rp100 49% 151% 148%
0% 0% 0% 0% 0%
Rp- 0%
BY BY EXTERNAL-
BY SPAREPARTS BY BAN BY BUCKET & BODY BY G.E.T BY TOOLS BY CONS GOODS BY OUTSIDE REPAIR BY COMPONENTS BY UNDERCARRIAGE
PELUMAS&COOLANT LABOUR
Plan Rp318.848.304 Rp257.383.068 Rp92.630.081 Rp- Rp13.320.526 Rp- Rp67.459.130 Rp- Rp53.992.510 Rp486.582.231 Rp46.038.965
Actual Rp648.062.964 Rp12.491.287 Rp18.250.000 Rp- Rp- Rp- Rp31.937.499 Rp11.671.440 Rp35.790.424 Rp- Rp31.126.131
Ach 49% 2061% 508% 0% 0% 0% 211% 0% 151% 0% 148%