0% found this document useful (0 votes)
13 views3 pages

May_Jun_2023 (1)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views3 pages

May_Jun_2023 (1)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Total No. of Questions : 8] SEAT No.

8
23
P567 [Total No. of Pages : 3

ic-
[6004]-503

tat
B.E.(Electrical Engineering)

7s
POWER SYSTEM OPERATION AND CONTROL

9:2
02 91
4:3
(2019 Pattern) (Semester - VII) (403141)

0
31
1/0 13
Time : 2.30 Hours] [Max. Marks : 70
0
6/2
.23 GP

Instructions to the candidates:


1) Solve Q.1 or Q.2,Q.3 or Q.4,Q.5 or Q.6 and Q.7 or Q.8.
E
82

8
2) Figures to the right indicate full marks.
C

23
ic-
3) Neat diagram must be drawn wherever neccesary.
16

tat
4) Assume suitable data, if necessary.
8.2

7s
5) Use of a non-programmable calculator is allowed.
.24

9:2
91
49

4:3
30
31
01
02

Q1) a) Explain the necessity of maintaining frequency constant. [4]


6/2
GP

b) Explain the droop characteristics of the speed governor system. [6]


1/0

c) Explain the working of proportional plus integral load frequency control


CE
82

8
of an isolated power system along with its frequency response curve.[8]

23
.23

ic-
OR
16

tat
Q2) a) Draw the complete block diagram of single area load frequency control.[4]
8.2

7s

b) Explain the necessity of automatic generation control (AGC). Also, explain


.24

9:2

the concept of area control error (ACE) of a single area and two area
91
49

4:3

case. [6]
30
31

c) With the neat block diagram, explain two area of load frequency control.
01
02

[8]
6/2
GP
1/0

Q3) a) Define the terms related to the constraints of the Unit Commitment: [4]
CE
82

i) Crew Constraints
.23

ii) Minimum uptime


16

iii) Minimum downtime


8.2

iv) Spinning reserve


.24
49

P.T.O.
b) State the various methods for the unit commitment. Hence, explain the

8
23
‘priority list method’ for unit commitment. [5]

ic-
c) Explain with the mathematical formulation, the Lagrange Multiplier method

tat
of economic load dispatch with transmission loss and no constraints of

7s
generation limit while meeting the load. [8]

9:2
OR

02 91
4:3
0
31
Q4) a) What is the need for a unit commitment study in the power system?
1/0 13
Explain. [4]
0
6/2
.23 GP

b) Write a short note on: [5]


i) Heat rate curve of a thermal generating unit.
E
82

8
C

23
ii) Cost curve of a thermal generating unit.

ic-
c) Using the priority list method prepare a unit commitment table using
16

tat
three generating units, for load values such as 400MW, 900MW, and
8.2

7s
1100MW.The incremental fuel cost of three units and other details are as
.24

9:2
follows: [8]
91
49

4:3
(IC)1 = (0.003P1 + 8)*103 Kcal/MWhr
30
31

(IC)2 = (0.002P2 + 8.5)*103 Kcal/MWhr


01
02

(IC)3 = (0.004P3 + 9)*103 Kcal/MWhr


6/2
GP
1/0

Maximum and minimum generation limits are,


CE
82

8
50<P1<500 MW;40<P2 <400 MW;20<P3<200 MW

23
.23

ic-
The fuel cost is (CP) 1 = 1.1 Rs / Kcal, (CP) 2 = 1.05Rs / kcal,
16

(CP)3 = 1.25Rs / kcal.


tat
8.2

7s
.24

9:2

Q5) a) What is the need for interconnection of the power system? [4]
91
49

4:3

b) Explain in detail: Interchange evaluation with unit commitment. [4]


30
31

c) With an example explain the economic interchange between interconncted


01
02

utilities. [10]
6/2
GP

OR
1/0
CE
82
.23
16
8.2
.24
49

[6004] - 503 2
Q6) a) What do you mean by power pool? What is the role of the power pool in

8
energy control? [6]

23
ic-
b) Write a short note on: Capacity Interchange, diversity interchange. [6]

tat
c) Explain: [6]

7s
i) Energy Banking.

9:2
02 91
ii) Emergency Power Interchange.

4:3
0
31
1/0 13
Q7) a) State the procedure to draw the QV curve. Hence, draw the QV curve
0
6/2
with appropriate labeling showing stable-unstable regions. [4]
.23 GP

b) What are the effects of voltage instability on the power system? Explain
E

in detail. [6]
82

8
C

23
c) Derive the expression of the power-voltage relationship for drawing the

ic-
PV curve in detail and hence draw the PV curve with appropriate labeling
16

tat
showing stable-unstable region. [7]
8.2

7s
OR
.24

9:2
91
Q8) a) What is the use of the PV curve in voltage stability analysis? State the
49

4:3
drawbacks associated with the PV curve method. [4]
30
31

b) Write a short note on load characteristics in the voltage stability. [6]


01
02

c) What is the concept of voltage collapse in the power system? What are
6/2
GP

the causes of voltage collapse? [7]


1/0
CE
82

8
23
.23

 ic-
16

tat
8.2

7s
.24

9:2
91
49

4:3
30
31
01
02
6/2
GP
1/0
CE
82
.23
16
8.2
.24
49

[6004] - 503 3

You might also like