0% found this document useful (0 votes)
10 views

Mus Report 2924 Night Report

Uploaded by

hazrulgladys9090
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

Mus Report 2924 Night Report

Uploaded by

hazrulgladys9090
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

06:00-06:15

Staged up flow rate to 400 gpm/500 psi, while rotating string with 20 rpm, observed increase in
pressure from 500 psi to 700 psi @ 2863 m.

06:15-07:00

Dry back reaming from 2866 m to 2852 m with 20-50 rpm, 6-20 klb. Ft torque. Circulate @ 2852 m
with 50-100 gpm/60-100 psi, 22 rpm, 8 klb. Ft torque for 15 mins. Resumed dry back reamed 2852 m
to 2832 m and reamed down to 2842 m with 50 rpm, 7-19 klbs. ft torque.

07:00-08:00

Staged up flow rate to 900 gpm/1700 psi, 20-22 rpm, 5-18 klbs. Ft torque. No losses. Staged up
rotation at 900 gpm from 30 rpm to 70 rpm. @ 900 gpm/1700 psi, 70 rpm,10 klb. Ft, observed
pressure increase to 1830 psi. Immediately stopped pump, rotation and work string to 2842 m.

08:00-10:45

Staged up flow rate to 900 gpm/1700 psi, 20 rpm, 8-12 klb.ft torque. No losses. Continue back
reamed f/-2842 m t/-2841 m. Observed pressure increase to 1800 psi. Immediately stopped pump
and work string, staged up flow rate to 800 gpm/1450 psi, 20 rpm, 8 klb.ft torque. Observed
pressure increase to 1580 psi. Again stopped pump and work string, to 2852 m staged up flow rate
while back reamed to 2842 m, 600 gpm/920 psi, 22 rpm, 9 klb.ft torque. Observed pressure increase
to 940 psi. Worked string to 5852 m Observed pressure increase to 1000 psi. Stopped pump work
string with 550 gpm/ 1020 psi, 20 rpm, 6-16 klb. Ft.

10:45-11:30

Circulated @ 2850 m by staged up flow rate to 400 gpm/440 psi, 22 rpm, 8 klb. Ft torque. Observed
pressure increase to 500 psi. Stopped pump and work the string, back reamed f/-2580 m t/-2840 m
with 50 gpm/50 psi, 22 rpm, 7-13 klb. Ft torque.

11:30-12:00

@ 2842 m, break 3 single stand of # 72 make up TIW and side entry sub with same stand. Line up
cemet unit to string and trough to kill line for LOT..