grounding work procedure_rev.3
grounding work procedure_rev.3
TITLE :
l) ey"
4P
03 07 okt 2013 ISSUED FOR REVIEW FA SG
CONTRACTOR COMPANY
Document. No.
Grounding Melhod
A. Preporolion
I . Moteriol delivery
2. lnspection'ond opproved by Compony
B. Solety Precoutions
I . Prepore JsA ond Sofeiy lnduclion
2. Tool box meeling
3. Use Complele PPE (Coveroll, sofeiy Shoes, sofely Gloss, Hondgloves) & Proper tools
4. ldentify Underground Cobles, Pipeline. surrounding working oreo by compony wiih lools
melol detector
5. Eleclricol Approvol drowing
6. work permil ond reloted eleciricol isoloted
Z. Preporotio working check list :
o. moleriol
b. monpower
c. tools
d. sofety equipment
e. scoffolding
f . meosurement lools
C. Grounding lnslollolion
I . Prepore Tools, Equipement, ond Moleriols
2. Determine grounding point to bel drilled
3. lnstoll ground rod (Min. 3 meier depth)
4. Meosure the grounding resistonce, if the volue is more thon lo ohm, odd the ground rod
instollotion to ochieve l0 ohm mqximum or less. (10 ohm for rod only withoui down
conductor))
Document. No.
D. Pre-Commissioningond Commissioning
1. Electricol isolotion of Hi-Line confirm by Compony (pod lock & safety grounding)
2. lnslolloiion pipe proiecior for down conductor coble include clomp
3. Prepore scofolding ond its occessories for working ot height
4. Dismontle existing port will be reploced {Arresler, Cut off Fuse , Stroin Rod,elc) ond
grounding conductor coble
5. Connection ond replocement existing port
6. Phisicolly ond visuol check oboul the conneclion
7. Continuily test ond check connection opproved by compony
8. reody to commissioning ond energized
9. house keeping ond preporotion to moving oihers points Hi-Line pole
10. Dismontle Scofollding simultontly
E. Re-lsolofion Procedure
l. Open pod lock ond LOTO tog
2. Open sofety grounding
3. Reody for commissioning ond energized