0% found this document useful (0 votes)
7 views

wall tiling Productivity Monitoring Form

Uploaded by

Nash Ran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

wall tiling Productivity Monitoring Form

Uploaded by

Nash Ran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Wall Tiling Productivity Monitoring Form

Project Title: _________________________________________________________________________________________________________________________________________________________________________ _


Breakdown of Manpower Size Please indicate the % of time taken in each activities
Mechanical and 1 2 3 4 5 6 7
Non-Mechanical
Concreting
Equipment used
(if any)
Trade Safety and
Tiled Tile Size Machine
Manhour Productivity Mechanical: Trade Health Mixing of
Area 1,2 2 (mm) Operator Transportation Patching and
S/no Location 2 Taken (m /manhour) Tower Crane, Manpower Manpower 8 Cement Laying of Grouting/ Cleaning of
(m ) Manpower 6 of Materials to Plastering (if Setting Out
Material Hoist, Size 3 4,5 Size 7 Mortar/Tile Tiles Pointing Tiles
Size Location any)
etc. Adhesive

Non Mechanical:
Scaffold/ladder/
bench,
Wheelbarrow, etc.
9
E.g. Blk 123 1 x Material Hoist 6% 8% 13% 4% 56% 8% 5%
#05-13 25 12.82 1.95 300 x 300 2 men 1 man 2 men
1 x Wheelbarrow
Toilets Percentage of time taken for Activities 1 to 7 MUST add up to 100 %.

Remark:

Recorded By: __________________________ Checked By: _______________________


Date: __________________________ Date: _______________________

Notes:
1) The manhours taken do not include hours clocked by the site management team.
2) Activities that are performed off-site shall not be included (e.g. prefabrication, pre-installation).
3) The trade manpower size refers to the gang size only.
4) The machine operator manpower size refers to operators of lifting equipment, transportation equipment and temporary hoist.
5) Mechanical equipment that do not require a designated operator, for example scissor lift shall not be recorded under Machine Operator manpower.
6) The safety and health manpower size refers to safety supervisor, rigger/signaller and housekeeping worker.
7) The time taken for the transportation of materials within the site by crane or other mechanical means shall be taken into account in the total manhours taken for the specific trade.
8) The manhours taken for the erection/dismantling of scaffolding, if any, shall be recorded under the activities “Setting out”.
9) The trade productivity value shown in the example is not meant for benchmarking purpose.