wall tiling Productivity Monitoring Form
wall tiling Productivity Monitoring Form
Non Mechanical:
Scaffold/ladder/
bench,
Wheelbarrow, etc.
9
E.g. Blk 123 1 x Material Hoist 6% 8% 13% 4% 56% 8% 5%
#05-13 25 12.82 1.95 300 x 300 2 men 1 man 2 men
1 x Wheelbarrow
Toilets Percentage of time taken for Activities 1 to 7 MUST add up to 100 %.
Remark:
Notes:
1) The manhours taken do not include hours clocked by the site management team.
2) Activities that are performed off-site shall not be included (e.g. prefabrication, pre-installation).
3) The trade manpower size refers to the gang size only.
4) The machine operator manpower size refers to operators of lifting equipment, transportation equipment and temporary hoist.
5) Mechanical equipment that do not require a designated operator, for example scissor lift shall not be recorded under Machine Operator manpower.
6) The safety and health manpower size refers to safety supervisor, rigger/signaller and housekeeping worker.
7) The time taken for the transportation of materials within the site by crane or other mechanical means shall be taken into account in the total manhours taken for the specific trade.
8) The manhours taken for the erection/dismantling of scaffolding, if any, shall be recorded under the activities “Setting out”.
9) The trade productivity value shown in the example is not meant for benchmarking purpose.