01-2024 Rate Schedule
01-2024 Rate Schedule
VAT RATES ENERGY TAX16 GEN SERVICE B (GS-B) & GEN POWER (GP) LOCAL FRANCHISE TAX8 SENIOR CITIZEN DISCOUNT17 SPECIAL DISCOUNT18
Generation 11.35% First 650 kWh no charge GS-B (5 kW ≤ demand < 40 kW) Varies per LGU Residential 5.00% GS-A 5.00%
Transmission 10.70% Next 350 kWh at 0.10 per kWh General Power Institution 50.00% GS-B & GP 3.00%
System Loss 11.29% Next 500 kWh at 0.20 per kWh Medium (40 kW ≤ demand < 200 kW)
Universal Charge, FIT-All & Energy Tax 0.00% Excess kWh 0.35 per kWh Large (200 kW ≤ demand < 750 kW)
Other Charges 12.00% Very Large (750 kW ≤ demand < 10,000 kW)
Extra Large (10,000 kW ≤ demand)
TOU GCA (adjustment per kWh)15 0.9364
1
Changes every month based on the movement in generation cost in accordance with Article 2 Section 2 of ERC Resolution No. 14, Series of 2022 dated December 19, 2022
2
Changes every month based on the movement in transmission cost in accordance with Article 2 Section 3 of ERC Resolution No. 14, Series of 2022 dated December 19, 2022
3
Changes every month based on the movement in generation and transmission costs and 12-month moving average system loss in accordance with Article 2 Section 4 of ERC Resolution No. 14, Series of 2022 dated December 19, 2022
4
Distribution, Supply, and Metering Rates in accordance with the Decision in ERC Case No. 2015-112 RC dated June 16, 2022
5
Subsidy provided by non-lifeline customers changes every month and applicable to subsidizing customers in accordance with Article 2 Section 5 of ERC Resolution No. 14, Series of 2022 dated December 19, 2022
6
Discount provided to lifeline customers, in accordance with ERC Decision in Case No. 2008-016 RC dated November 10, 2008 and Republic Act No. 11552 - % of Generation, Transmission, System Loss, Distribution, Supply and Metering Charges
7
Changes every month and applicable to subsidizing customers in accordance with Article 2 Section 6 of ERC Resolution No. 14, Series of 2022 dated December 19, 2022
8
Changes in accordance with ERC Resolution No. 2, Series of 2021
9
In accordance with the Notice of Resolution in ERC Case No. 2022-014 RC dated September 5, 2023, and Decision in ERC Case Nos. 2014-089 RC, 2016-008 RC, 2014-090 RC, 2014-188 RC, 2015-203 RC, 2016-144 RC, 2014-091 RC, 2014-189 RC, and 2015-204 RC dated March 22, 2023
10
In accordance with the Decision in ERC Case No. 2014-135 RC dated September 15, 2021
11
Collection suspended in accordance with the ERC Advisory dated May 22, 2020
12
In accordance with the ERC Order in Case No. 2013-195 RC dated January 15, 2019
13
Collection suspended in accordance with ERC Resolution No. 11, Series of 2023 dated August 4, 2023
14
Power Factor Adjustment - for qualified General Power customers, % of Distribution Charge (in accordance with ERC Order on Case No. 2011-088RC dated October 6, 2011)
15
Generation Charge Adjustment (GCA) added to Peak and Off-Peak generation charge rates of qualified Residential, IS and NIS customers (in accordance with ERC Order in Case No. 2012-117 RC, dated December 17, 2012)
16
Energy Tax, in accordance with Batas Pambansa Blg. 36 - for residential customers only
17
Senior Citizen Discount, In accordance with ERC Resolution No. 14, Series of 2022 and Republic Act No. 9994 - % of Generation, Transmission, System Loss, Distribution, Supply, and Metering; Net of Lifeline Discount for Lifeline Customers
18
Special Discount - for Private Hospitals duly registered and certified by the Department of Health (DoH) and Educational Institutions duly registered and certified by the Department of Education (DepEd): % of Distribution, Metering & Supply Charges