5.- Production Order Processing HANA 21 July 2022
5.- Production Order Processing HANA 21 July 2022
Logistics > Materials Management > Purchasing > Purchase Order > Create >
Vendor/Supplying Plant Known
We will turn off the Document Overview because we will be creating this purchase order
directly rather than starting with a purchase requisition.
Next, we need to open the header section of the purchase order screen to enter organizational
data values:
Next, to make entering the data easier, close the header section of the screen and open the line
item section:
We are going to purchase these materials from Battle Creek Baking Supplies. We assigned this
vendor the number ##S100, so enter that number in the Vendor field:
Entering vendor ##S100 and pressing the enter key will produce the following screen:
Close the Header portion of the screen, then enter the remaining materials that need to be
purchased as shown below:
Material Qty
##R300 1000
##R310 1000
##R320 500
##R330 500
##R340 1000
##R350 1000
##R360 500
##R370 500
##R390 2000
##R400 1000
##R410 500
After entering the materials and quantities from the list above, press the enter key and SAP will
add the material descriptions (aka Short Text) and units of measure, as well as some warning
messages:
No errors
This screen shows there are not errors in the purchase order—just warnings that are not a
problem.
Click on the cancel icon ( ) to close the message window. Finally, enter 100 for the storage
After entering 100 for the storage location and pressing the enter key, the SAP system will show
the description of the storage location:
Click on the Save icon ( ) to save the purchase order. This will produce the following pop-
up window:
Click on Save
Logistics > Materials Management > Inventory Management > Goods Movement > GR
for Purchase Order
Click on the Purchase Order Field, and then click on the search icon, which will produce the
following search window:
Make sure the vendor field is blank and that the purchasing organization is ##PR and the
purchasing group is ##S:
After selecting your purchase order, the number will appear on the goods receipt screen, but
the details won’t appear until you press the enter key:
Press the enter key to call up the items in the purchase order:
Logistics > Production > MRP > Evaluations > Stock/Requirements List Collective
Display
Enter ##PT for the plant and 0## for MRP Controller, then click on Continue to produce the
following screen:
You should now have inventory on hand for all raw materials.
Now both materials can be viewed. Double-click on ##S210 to make sure it is selected:
Click on the convert planned order to production order icon ( ), which will
produce the following screen:
Click on the Save icon ( ) to save the production order. You will get the following
message:
Click on Yes
This message is warning us that costs cannot be calculated based on the material routing as we
have not provided enough cost information. This level of configuration is beyond the scope of
this course. After clicking on Yes you should get a message like the following:
Click on the refresh icon ( ) on the Stock/Requirements List to see the new production order:
To make things easier, we will copy this order number from the stock/requirements list. To do
this, click on the details icon ( ) next to the production order:
Logistics > Production > Shop Floor Control > Goods Movement > Goods Issue / Goods
Receipt
From the dropdown lists, choose Goods Issue and Order. Then paste your production order
number in the field next to the Order pulldown using the keys Ctrl and V:
Enter 100 for the storage location, ##PT for Plant, select
Propose the OK Function in the Future and Propose All Items
and then click on the Adopt icon ( )
Press the enter key and all items from your purchase order will be displayed with the OK value
checked for each item and the storage location set to 100:
Click on Post
click the Post icon ( ) and you should be returned to the Enter Goods Issue: Initial Screen
and with the following message:
Logistics > Production > Shop Floor Control > Confirmation > Enter > For Order
Paste your order number in the Order field, then press the enter key and the following screen
will appear:
Enter 500 for Yield to conf., then click on the Save icon ( ) and the following message
should appear:
Select Goods Receipt and Order from the pulldown lists, paste your production order in the
field next to Order using the Ctrl-V, then press the enter key. This will produce the following
screen:
After clicking on Post icon ( ) and you will get a message like the following:
Click on the refresh icon ( ) to confirm that you now have 500 lb. of dough in stock.
With ##F110 selected, double-click on the first planned order to begin the process of converting
it into a production order:
After confirming that the production order is for 7 cases of snack bar, click on the Save icon
( ) to save the production order. Click Yes on the warning message:
Click Yes
Click on the refresh icon ( ) on the Stock/Requirements List to see the new production order:
Next, copy the production order number from the stock/requirements list. To do this, click on
the details icon ( ) next to the production order:
9. Goods Issue
To complete the production order for ## NRG-A bars, we need to issue the batch of dough that
we made previously. Switch to another session, then follow the menu path:
Logistics > Production > Shop Floor Control > Goods Movement > Goods Issue / Goods
Receipt
After pasting the order number and clicking on the enter key, the following screen will appear:
Change the storage location to 200 (Production), press the enter key and then click on the Post
icon ( ) to confirm the goods issue. You should be returned to the Enter Goods Issue:
Initial Screen and with the following message:
Logistics > Production > Shop Floor Control > Confirmation > Enter > For Order
Paste your order number in the Order field and click on the Continue icon ( ) and the
following screen will appear:
Enter 7 for Yield to conf., then click on the Save icon ( ) and the following message should
appear: