0% found this document useful (0 votes)
11 views

ZONE -2-Model

Uploaded by

smddtlis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

ZONE -2-Model

Uploaded by

smddtlis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Drawing No.

N
BAIKUNTHPUR-WSS-NET-DN-LAYOUT-001
ZONE - II
J-12
GL-303.91m Sheet No. 2
PH-12.78m
J-39
GL-302.48m
PH-14.19m Key Map of Nagar Parishad BAIKUNTHPUR
J-33
GL-302.77m
PH-13.87m

mm
P-13

L-96m
D-125
ZONE-5

J-32

m
m
GL-302.84m

P-89
D-90m
L-212
PH-13.87m

D-90mm
L-53m
29 m

P-90
ZONE-1

P- 0m
SCHOOL SCHOOL

11 m J-37 ZONE-3

D- 264 GL-302.51m
L- ZONE-2
PH-14.13m
J-17 J-19 ZONE-4

GL-303.60m 8 GL-303.38m
J-5 2
GL-305.23m J-4 PH-13.13mP- mm PH-13.33m
0
D 1 m
- 1 P-
PH-11.69m
S.V GL-305.06m
PH-11.08m
J-21
GL-303.41m
L-42
P-11
D-125m
m
D-9 84
0
L-1 mm

D-125mm
P-4 J-24 m 93m J-90
PH-13.35m S.V L-170

P-12
D-160m

L-4m
m P-9 m GL-303.40m GL-299.45m
L-175m 5m
7
P-2 0mm D-12 6m PH-13.45m PH-16.78m
J-1
GL-305.27m 11 L-5
J-91
GL-299.28m
Legends
D- 11m

mm
P-53
PH-10.87m P-100 J-96

L-40m
J-22 L- PH-16.93m

D-90
D-90mm GL-303.60m GL-298.04m

D-125mm
J-2 P-5
D-90 7

L-65m
L-167m PH-13.35m PH-18.16m

P-10
Culvert
GL-304.86m J-26 m
PH-10.95m
J-6
GL-303.16m Existing OHT:- 2 L-45 m Water body / Canal
GL-303.81m m P-81

m
Open well
P-66 PH-13.61m

D-160m
PH-11.80m

L-67 m
D-90

L-68m
L-13 m

P-3
J-35

D-9 6
D-90mm mm Ward Boundary

0m
m
D-90 2

P-7
m
m
L-85m

P-3
L-55m GL-303.10m
PH-14.02m J-57 Average G.L. : 302.20M Property Line
Intake Well

L-6 mm
D- -74
J-38

L-5 m
J-3 J-29 GL-302.33m Water Treatment Pant

D- -70
Capacity : 325KL

6m
90m
7m

90
GL-303.02m

P
GL-304.83m GL-303.03m PH-14.99m Proposed OHT

P
PH-10.97m PH-13.75m PH-14.14m S.V Existing OHT

L-7 m
J-31

D -9 78
ZONE-2
Staging : 15.0M

0m
Road Line

1m
P J-83
GL-302.95m P P-6D -2 S.V P-1

P-
Hand Pump
PH-13.82mD- -59 J-54 GL-299.61m

L- mm
-200mD

D- -62
D-160mm m-250mm J-92 School
90
Container Height : 5.50M
SCHOOL

PH-16.62m

m
GL-302.10m
L-4 mm L-3
HOSPITAL

L-44m 5m L-9m

D-140mm
90
GL-299.06m

P
Panchayat Bhavan

48
6m PH-14.87m

L-48m
J-10 J-27 PH-17.15m Mandir

P-8
L-2 mm
J-40 J-70
Lattitude : 24° 43.714'N

D- -44
GL-303.05m

L-2 mm
Mosque
GL-303.07m

D-9 40
9m
GL-302.53m GL-301.48m

7m
PH-13.72m

90
P
Police Station
PH-12.35m
POLICE

P-
0
PH-14.24m P- J-43 PH-15.49m
D- 61
P-9
D-9 2
J-30 9
L- 0mm
GL-302.43m Longitude : 81° 24.820'E Petrol Pump
Electric Pole

m
GL-302.99m 62 PH-14.55m J-69
0m

P-42
Transformer

L-29m
L-2 5mm

D-90m
Transformer

L-15 m m
PH-13.78m P-52 GL-301.53m FSL : 322.70M
D-1 -16
69m

Municiple Boundary
m
WARD-10 P-54

28 m
9 3
J-9 J-47 D-90mm PH-15.43m Railway Line

D- P-9
2
P

L- 0m
D-90mm

L- 90m 3
16 m
m
GL-303.04m GL-302.20m L-39m
Location : Thana OHT- At Ward No.-14

D- P-3
EX.TUBWELL

WARD-13 L-41m J-65

m
PH-12.32m J-28 P PH-14.62m PRO.TUBWELL T.W.

D- -80 GL-301.48m

40mm
GL-303.03m 90
Ex.&Pro.Sumpwell
J-71

26m
L-8 mm PH-15.15m
L-21 m

P-7
PH-13.74m J-41
5m
D-90 8

GL-301.43m
m

4m P-18
P-8

GL-302.43m PH-15.53m

1
-
WARD-11

L-36 m
D-110mm

L
-
Sluice Valve

D-90 8
D
J-64 PH-14.46m
WARD-14

m
L- mm

m
D- -35

P-4
GL-301.67m L-37m

D-110mm
P
90
Scour Valve

20
PH-15.12m J-67

L-7 m
L-51m

D- -65
P-20

90m
GL-301.36m

8m
Flow Meter

P
PH-15.27m FM
D-90mm
L-111m

J-44

D-90m
Air Valve av
P-82

P-47
J-53

L-52m
GL-302.18m
PH-14.58m GL-301.93m J-79
J-7 P-75 PH-14.79m GL-300.52m
Node
J-50

m
GL-303.11m D- 90mm
GL-302.08m P-46 PH-16.13m Flow Direction
PH-12.04m D P- L-72m
-9 36 PH-14.68m D-90mm

D-160mm
L- 0m Zone Boundary

L-263m
L-31m
D-90mm

21 m J-72
L-71m

P-5
P-77

m P-38 J-51 J-85


D-90 GL-301.02m P-79 Ward Boundary
mm GL-302.06m PH-15.61m GL-299.96m
L-22 PH-14.70m D-90m PH-16.67m
J-13 J-48 m m Existing Pipe
J-11 91 L-72m EP
GL-302.13m P- 0mm

P- mm
D- -96
GL-302.95m GL-302.69m

71
90 m
PH-14.63m 9 m New Proposed Pipe

L
PH-12.80m PH-12.46m
J-14 D- -51 NP
L

D-110mm
S.V Rider/Header Pipe
D-1 7m

GL-302.23m RP

L-118m
P-3 mm

P-24
J-16
L-40 m

PH-12.92m
L-
10

D-9 5

GL-302.14m
1

m
0m
P-5

P- J-18
D-9 45 GL-301.96m
PH-13.06m Pipe Table
0
L-4 mm P PH-13.19m J-55
J-8 0m D-9 -37 Diameter Material Proposed/Existing Colour Coding
0 GL-301.82m
GL-302.92m L-2 mm J-60
WARD-8 PH-12.22m 1m P
0
-
D-9 34
L-1 mm
7m
PH-14.90m

P-9
GL-301.66m
PH-15.06m
Ø 200mm
Ø 250 mm
HDPE PN-6
Proposed
Proposed

D- J-73 J-86 HDPE PN-6


90 7
L-9 mm

GL-300.85m GL-299.94m
D-9 85

L-3 mm
3m

J-68 PH-15.78m All Existing Pipes


P-

PH-16.67m
0

8m J-77
L-5 mm

J-66
D-9 -68

GL-301.45m
6m

GL-301.65m GL-300.87m
PH-15.39m P-1
0

J-20
P

PH-15.19m D-1 5 PH-16.00m


m

GL-301.83m P
D-9 -94 25
L-12 mm P-21
D-110m
L-19m
P-30

PH-13.33m 0 m
D-110m
D-125mm

J-25 L-5 mm 1m P-
L-199m

L-3 mm
D-9 83
S.V
J-74 m
P-17

3 0

D-9 51
J-15 GL-301.62m m L- 9

9m
GL-300.85m 0
P-7 L-1 mm

P-
GL-301.98m

0
m m

PH-13.53m
D-90 3
1 2

31m
L- 10m

J-78 PH-15.78m
D- P-2

D-1 3m

PH-13.00m m
L-66 m
L-5 m

P-1 m

GL-300.85m
D- -64
95

L-
90m

m
0m

25m

J-58 PH-16.02m J-89


4
P

J-97
GL-301.59m GL-299.84m
GL-298.24m
P- 9 PH-15.00m PH-16.76m
D-90 5 J-23 J-75 PH-18.36m
BT ROAD
L-55 m

D-90mm

m
D-9 7

L -89 m
L-59m
0m
m

GL-301.02m
P-72

GL-301.60m
P-8

m PH-13.38m PH-15.83m
CC ROAD
J-36 WARD-12
L-43 m

GL-300.91m J-88 KR ROAD


0m

J-76
D-11 9
m

PH-14.05m J-81 GL-300.11m


P-1

GL-300.36m P GL-300.58m
D- -67 PH-15.97m
PH-16.76m
PH-16.22m 90 J-80
L- mm GL-300.40m
58
m 8
L-4 mm

P-5 m PH-16.15m
D- -98

P-96 Project Name


1m

0m
D-9 6m
90
P

D-90mm
J-45 L-4
D-90mm

L-89m
L-36m

P-50

J-46 GL-300.37m
PH-14.58m Work of Augmentation of Water Supply System of Nagar Panchayat

J-42
GL-300.39m
PH-14.58m WARD-7
J-84
GL-299.91m
PH-16.64m
Baikunthpur, District Rewa (M.P.) Water supply scheme under Amrut
Mission 2.0
J-34
GL-301.02m GL-300.43m
PH-14.53m
PH-13.94m
L-1 10mm

J-95
D-1 -23

J-49 P Employer
00m

L- mm

D P-8 GL-298.63m
D- -49

GL-300.31m P-26 - D- -56 J-94


P

90
m

D-11 L- 90m 6 PH-17.94m


P
90

L- mm GL-298.82m
36

PH-14.65m 0m OFFICE OF CHIEF MUNICIPAL OFFICER


L-51 m 98 m 41
D-90mm

5 m J-93 m PH-17.73m
m
L-29m

P-2 mm
P-43

J-56 J-82 GL-298.83m URBAN LOCAL BODY/NAGAR PARISHAD, BAIKUNTHPUR


1 0 GL-299.97m
D-1 22m GL-300.09m PH-17.71m
L-1 PH-14.95m J-62 PH-16.48m DISTRICT-REWA (MADHYA PRADESH)
53 m

WARD-6
D- P-63

GL-299.83m
WARD-5
L- 0m

J-52
m

PH-15.08m
Contractor
9

GL-300.17m J-61
P-
PH-14.78m D -9 60
D-90m

GL-299.84m M/S RAM KINKAR TRIVEDI,


P-39
L-23m

0
L-4 mm PH-15.07m
8m Village-Kachur Po.-Mahmooodpur Dist -Rewa
L-3 m
D- -41
m

90m
1m

J-59
P

GL-299.89m
D- -8m
P- mm

PH-15.02m P-69 Design Consultant SMD Digital Testing Laboratory & Infrastructure
99
90

J-87
L

D 0mm
-9 GL-299.81m
L-58m PH-16.76m Registered Address :- A79/80, Soumya Privilege Trilanga,
J-63
GL-299.82m Near Aura mall Email Id :- [email protected],
PH-15.09m
Mobile No.- 07898470877
Drawing Name
Pipe Link No. P-
Pipe Length(m) L- Note:- 1. HDPE PE100 & PN-6 Class pipe as per IS 4984-1995 EP- Distribution Network Drawing of Nagar Parishad Baikunthpur
Pipe Dia(mm) D-
Junction Existing pipe, NP- Proposed pipe, RP - Header Pipe (Proposed Pipe).
J-
Junction Flow
Junction No. Direction
J-
GL-
Junction No.
Elevation(m)
2. Valve (Sluice, Scour) Shall be provided ar suatable location and as per Drawn By Checked By Approved By
GL- Elevation(m) Ph- Pressure(m)
Ph- Pressure(m) Indicative Diagram site condition in guidance of Engineer -in- Charge. VS SS MKK
Sheet Size :- A0 Scale :- 1:15 Rev :- R0 Date:- 02/02/2024
Rev :- R0 Date:- 00/00/0000

You might also like