0% found this document useful (0 votes)
16 views

List of Documents Required for Processing

Uploaded by

fG
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

List of Documents Required for Processing

Uploaded by

fG
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1. Net Metering Agreement on Rs.

300/- stamp paper


· Authorized person’s PAN Card & Aadhar Card – Duly Signed
· ID Proof of 2 witnesses (i.e. Aadhar Card - Duly Signed)
2. GEDA Application Letter
3. Electricity Bill Copy (Latest Month’s)
4. Electricity bill payment receipt (Latest)
5. Solar Rooftop Estimate Payment Receipt
6. Chief Electrical Officer’s Approval (CEI) – with verified sign
7. CEI Drawing Approval – with verified sign
8. Drawings of the electrical installation (with Agency Signed & stamped)
9. Residence Ownership Proof
10. Authorization letter by CS
11. Proprietor Document (GST registration certificate)
12. Partnership deed or Company Memorandum
13. Meter Test Reports
14. Agency contractor license and supervisor license
List of Documents to be submitted in 2 separate files in below order

Sr. No. Description

Please mention Mobile no. & Email ID on file for Communication

1 Net Metering Agreement on Rs. 300/- stamp paper

2 Undertaking on Rs. 300/- Stamp Paper

3 Authority Letter or Board Resolution

4 Partnership deed or Company Memorandum

5 Authorized person’s PAN Card & Aadhar Card – Duly Signed, PAN Card in the name of Company

6 ID Proof of 2 witnesses (i.e. Aadhar Card - Duly Signed)

7 GEDA Application Letter

8 Electricity Bill Copy (Latest Month’s) & Bill payment receipt

9 Solar Rooftop Estimate Payment Receipt

10 Chief Electrical Inspector’s Approval (CEI) – with verified sign

11 CEI Drawing Approval – with verified sign

12 Drawings of the electrical installation (with EA Signed & Stamped)

13 HT Meter, ABT Meter Test Reports & CTPT Test Reports

14 LT Meter Test Reports & relevant CTPT Test Reports

Remarks:
1 Company rubber stamp & embossed seal (Required at the time of agreement)

2 After examination of the file further requirement of documents shall be furnished as and when desired.

3 After scrutinizing the complete file, date of agreement signing will be communicated

You might also like