0% found this document useful (0 votes)
491 views1 page

ISO 3834 Audit Checklist

Ims doc

Uploaded by

jeetlearn73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
491 views1 page

ISO 3834 Audit Checklist

Ims doc

Uploaded by

jeetlearn73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

S.C. Railway Doc.

No: F/IMS/Weld Audit Check Sheet Ref: P/04


Carriage Workshops
Lallaguda Rev. No: 00 Effective Date: 21/12/2024 Page 1 of 1

FU Audit No. Date of audit Place of Audit Time MR No.(allotted by MR)


Start Finish
Scope of Audit Welding Quality Standard (ISO 3834-2:2021).

Name & Designation


Auditee Auditor

Clause Conformance Status


Requirement as per standard Points to be audited
No. (C/NC/Observation)
Awareness Training 1. Total No. of Supervisors available:
Programme on ISO 3834 2. Number of supervisors attended:
welding Standards
10.2 Welding Procedure 1. Total Number of joints identified for
Specification: The shop shall WPS:
prepare the welding-procedure 2. Number of WPS available on hand:
specification(s) and shall
ensure that these are used
correctly in production
10.3 Qualification of the welding 1. Total number of PQR:
procedures: Welding 2. Number of PQR available of hand:
procedures shall be qualified
prior to production
Welding Personnel
7.2 Welders and welding operators 1. Qualification Test carried out as per
shall be qualified by an the Standard:
appropriate test 2. Total Number of welders available:
3. Number of welders qualified:

7.3 The shop shall have at his Nomination of Supervisor responsible


disposal appropriate welding for welding activities:
coordination personnel
Non-Destructive Testing Personnel
8.2 The non-destructive testing 1. Total Number of inspection
personnel shall be qualified. personnel available:
Inspection personnel to be 2. Number of personnel qualified:
qualified as per ISO 9712
For CMT personnel: 1. Total CMT personnel available:
To be qualified in RT, UT, 2. Number of qualified personnel:
MPT, DPT as per ISO 9712
Equipment:
9.5 Equipment Maintenance 1. Total number of welding plants
The shop shall have available:
documented plans for the 2. Number of plants calibrated and
maintenance of equipment. checked:
Example of these items are as
follows:
Condition of guides in
equipment of thermal cutting,
ammeters and voltmeters, flow
meters etc. used for the
operation of the welding
equipment, cables, hoses,
connectors, temperature-
measurement instruments,
wire feeders and conduits.
10 Production planning: The shop
shall carry out adequate
production planning:

Page 1 of 1