0% found this document useful (0 votes)
13 views

3-Storeyed RCC Building

Uploaded by

usakichris
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

3-Storeyed RCC Building

Uploaded by

usakichris
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

A B C D E F G H I J K L M N O P Q R

174'
10' 10' 10' 10' 10' 10' 10' 10' 10' 12' 10' 10' 10' 10' 10' 10' 12'
W3 W3 W3 W3 W3 W3 W3 W3 W3 V2 W3 W3 W3 W3 W3 W3 V2
1 YSIZE
XSIZE

D2
YSIZE
XSIZE

YSIZE
XSIZE

YSIZE
XSIZE

12' W3 D2
YSIZE
XSIZE

YSIZE
XSIZE

D2
2 YSIZE
XSIZE
YSIZE
XSIZE

D2
32' W3
12'
YSIZE
XSIZE

YSIZE
XSIZE

UP V1
MD MD MD MD MD MD MD MD MD MD
YSIZE
XSIZE YSIZE
XSIZE

3 W3 W3 W3 W3 W3
D1

8' CORRIDOR CORRIDOR


4 YSIZE
XSIZE YSIZE
XSIZE YSIZE
XSIZE YSIZE
XSIZE YSIZE
XSIZE YSIZE
XSIZE YSIZE
XSIZE YSIZE
XSIZE YSIZE
XSIZE YSIZE
XSIZE

ENTRANCE

GROUND FLOOR PLAN


A B C D E F G H I J K L M N O P Q R
174'
10' 10' 10' 10' 10' 10' 10' 10' 10' 12' 10' 10' 10' 10' 10' 10' 12'
W3 W3 W3 W3 W3 W3 W3 W3 W3 V2 W3 W3 W3 W3 W3 W3 V2
1 D2

12' W3 D2

D2
2
D2
32' W3
12'
UP V1
MD MD MD MD MD MD MD MD MD MD
3 W3 W3 W3 W3 W3
D1

8' CORRIDOR CORRIDOR


4

FIRST FLOOR PLAN


A B C D E F G H I J K L M N O P Q R
174'
10' 10' 10' 10' 10' 10' 10' 10' 10' 12' 10' 10' 10' 10' 10' 10' 12'
W3 W3 W3 W3 W3 W3 W3 W3 W3 V2 W3 W3 W3 W3 W3 W3 V2
1 D2

12' W3 D2

D2
2
D2
32' W3
12'
DN V1
MD MD MD MD MD MD MD MD MD MD
3 W3 W3 W3 W3 W3
D1

8' CORRIDOR CORRIDOR


4

SECOND FLOOR PLAN


A B C D E F G H I J K L M N O P Q R
174'

2
32'

ROOF PLAN
A B C D E F G H I J K L M N O P Q R
174'
10' 10' 10' 10' 10' 10' 10' 10' 10' 12' 10' 10' 10' 10' 10' 10' 12'

23°

3' +38'-6" ROOF SLAB LEVEL


2'-6"
12'

+26'-6" SECOND FLOOR LEVEL

36' 12'
+14'-6" FIRST FLOOR LEVEL

12'

+2'-6" GROUND FLOOR LEVEL


2'-6" ±0'-0" NATURAL GROUND LEVEL

FRONT ELEVATION
R Q P O N M L K J I H G F E D C B A
174'
12' 10' 10' 10' 10' 10' 10' 12' 10' 10' 10' 10' 10' 10' 10' 10' 10'

23°

3' +38'-6" ROOF SLAB LEVEL


2'-6"
12'

+26'-6" SECOND FLOOR LEVEL

36' 12'
+14'-6" FIRST FLOOR LEVEL

12'

+2'-6" GROUND FLOOR LEVEL


2'-6" ±0'-0" NATURAL GROUND LEVEL

BACK ELEVATION
4 3 2 1 1 2 3 4
32' 32'
8' 12' 12' 12' 12' 8'

3' +38'-6" ROOF SLAB LEVEL


3' +38'-6" ROOF SLAB LEVEL
2'-6"
2'-6"
12'
12'
+26'-6" SECOND FLOOR LEVEL
+26'-6" SECOND FLOOR LEVEL

36' 12'
36' 12'
+14'-6" FIRST FLOOR LEVEL
+14'-6" FIRST FLOOR LEVEL

12'
12'
+2'-6" GROUND FLOOR LEVEL
+2'-6" GROUND FLOOR LEVEL 2'-6" ±0'-0" NATURAL GROUND LEVEL
2'-6" ±0'-0" NATURAL GROUND LEVEL

RIGHT SIDE ELEVATION LEFT SIDE ELEVATION


DOOR & WINDOW DETAIL

5' 3'
1'-6" 1'-6"
2'-6"

9'
7' 7' 6'-9"

F.F.L

MD D-1 D-2

6' 2'-9"
1'-6"
2' 2'
6'-3"

6'-6" 6'-6"

3' 6'-10"
F.F.L

W3 V2 V1
A B C D E F G H I J K L M N O P Q R
174'-0"
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0"

1
F3 F3 F3 F2 F3 F3 F2 F3 F3 F2 F2 F3 F3 F2 F3 F3 F3 F3
12'-0" 12'-0"

2
32'-0"

F2 F1 F1 F4 F1 F1 F4 F1 F1 F4 F4 F1 F1 F4 F1 F1 F4 F2

3 F2 F4 F4 F3 F4 F4 F3 F4 F4 F3 F3 F4 F4 F3 F4 F4 F4 F2
8'-0"

4 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1

FOOTING LAYOUT PLAN


A B C D E F G H I J K L M N O P Q R
174'-0"
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0"

C1 C2 C2 C1 C2 C2 C1 C2 C2 C1 C1 C2 C2 C1 C2 C2 C1 C1
1
12'-0" 12'-0"

C1 C1a C1a C1 C1a C1a C1 C1a C1a C1 C1 C1a C1a C1 C1a C1a C1 C1
2
32'-0"

C1 C2 C2 C1 C2 C2 C1 C2 C2 C1 C1 C2 C2 C1 C2 C2 C1 C1
3
8'-0"

C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
4

COLUMN LAYOUT PLAN


A B C D E F G H I J K L M N O P Q R
174'-0"
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0"

1
12'-0" 12'-0"

2
32'-0"

3
8'-0"

RETAINING WALL LAYOUT PLAN


A B C D E F G H I J K L M N O P Q R
174'-0"
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0"

PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB2 PB1 PB1 PB1 PB1 PB1 PB1 PB2
1
PB1
12'-0" 12'-0"
PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2
PB1

PB1
PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB2 PB1 PB1 PB1 PB1 PB1 PB1 PB1
2
32'-0"

PB1
PB2
PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2

PB2
PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB2 PB1 PB1 PB1 PB1 PB1 PB1 PB2
3
8'-0"
PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1

PB1
PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB2 PB1 PB1 PB1 PB1 PB1 PB1 PB2
4

PLINTH BEAM LAYOUT PLAN


A B C D E F G H I J K L M N O P Q R
174'-0"
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0"

FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB2 FB1 FB1 FB1 FB1 FB1 FB1 FB2
1
FB1
12'-0" 12'-0"
FB2

FB2

FB2

FB2

FB2

FB2

FB2

FB2
FB1
FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1
FB3

FB3

FB3

FB3

FB3

FB3

FB3

FB3

FB3

FB3
2
32'-0"

FB1
FB2
FB2

FB2

FB2

FB2

FB2

FB2

FB2

FB2
FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB2 FB1 FB1 FB1 FB1 FB1 FB1 FB2
3
8'-0"
FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1
FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB2 FB1 FB1 FB1 FB1 FB1 FB1 FB2
4

FIRST & SECOND FLOOR BEAM LAYOUT PLAN


A B C D E F G H I J K L M N O P Q R
174'-0"
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0"

RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB2 RB1 RB1 RB1 RB1 RB1 RB1 RB2
1
12'-0" 12'-0"
RB2

RB2

RB2

RB2

RB2

RB2

RB2

RB2
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB2 RB1 RB1 RB1 RB1 RB1 RB2
RB3

RB3

RB3

RB3

RB3

RB3

RB3

RB3

RB3

RB3
2
32'-0"

RB2

RB2

RB2

RB2

RB2

RB2

RB2

RB2
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB2 RB1 RB1 RB1 RB1 RB1 RB2
3
8'-0"
RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1

RB1
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB2 RB1 RB1 RB1 RB1 RB1 RB2
4

ROOF BEAM LAYOUT PLAN


A B C D E F G H I J K L M N O P Q R
174'-0"
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0"

1 S2
12'-0" 12'-0"

S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2

S1
S2

2
32'-0"

S2

S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2
S2
S1

3
8'-0"

S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2

FIRST & SECOND FLOOR SLAB LAYOUT PLAN


A B C D E F G H I J K L M N O P Q R
174'-0"
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 12'-0"

1
12'-0" 12'-0"

S2

2
32'-0"

S2

3
8'-0"

S2

4
5"x2" U-beam Rafter
ROOFING LAYOUT PLAN 3"x1.5" Hollow Purlin
FOOTING SCHEDULE
FOOTING SIZE REINFORCEMENT ( BOTTOM STEEL ) REINFORCEMENT ( TOP STEEL ) DEPTH
NO TYPE REMARK
L B H X - DIRECTION Y - DIRECTION X - DIRECTION Y - DIRECTION (FROM NGL)

1 F1 4'-6" 4'-6" 10" 16mm Ø @ 6" c/c 16mm Ø @ 6" c/c -6'-0" ISOLATED

2 F2 5'-6" 5'-6" 10" 16mm Ø @ 6" c/c 16mm Ø @ 6" c/c -6'-0" ISOLATED
3" cover
3 F3 6'-6" 6'-6" 12" 20mm Ø @ 6" c/c 20mm Ø @ 6" c/c -6'-0" ISOLATED

4 F4 7'-0" 7'-0" 12" 20mm Ø @ 6" c/c 20mm Ø @ 6" c/c -6'-0" ISOLATED

PB PB PB PB
THREE STOREY RCC
2'-0"

2'-0"

2'-0"

2'-0"
NGL NGL NGL NGL
Project
CLASSROOM
6'-0"

6'-0"

6'-0"

6'-0"
(174'x32')
1'-0"

1'-0"

1'-0"
10"

3" thick 1:3:6 lean concrete 3" thick 1:3:6 lean concrete 3" thick 1:3:6 lean concrete 3" thick 1:3:6 lean concrete
9" thick hardcore with sand filling 9" thick hardcore with sand filling 9" thick hardcore with sand filling 9" thick hardcore with sand filling
4'-6" 5'-6" 6'-6" 7'-0"

6'-6" 7'-0"
4'-6" 5'-6"
Subject FOOTING SCHEDULES
& DETAILS
4'-6"

5'-6"

6'-6"

7'-0"
Botto Steel Botto Steel Botto Steel
F1 Detail F2 Detail F3 Detail
Botto Steel Revision - Sheet No.
F4 Detail

Date MAY, 2023 S-09


R.S.E
121" Thk. 1:2:4 Concrete Work

412" Thk. 1:3:6 Concrete Work


6" Thk. Sand Filling
2'-0"

N.G.L Owner
9" thk; brick wall
112" thk; brick step
2'-6"

18" thk; brick step


3" thk:(1:3:6) Lean Conc:
3" thk: Sand filling
2'-0"
Address
NAME FOUNDATION TO GF GF TO 1ST FL NAME FOUNDATION TO GF

C1 C1a

SIZE 12" x 12" 12" x 12" SIZE 12" x 12"

BAR 16mmØ - 8Nos 16mmØ - 8Nos BAR 16mmØ - 8Nos

STIRRUP 10mmØ @ 4"~6" C/C 10mmØ @ 4"~6" C/C STIRRUP 10mmØ @ 4"~6" C/C

C2 Project THREE STOREY RCC


CLASSROOM
(174'x32')

SIZE 15" x 15" 15" x 15"

BAR 20mmØ - 10Nos 20mmØ - 10Nos

STIRRUP 10mmØ @ 4"~6" C/C 10mmØ @ 4"~6" C/C


COLUMN SCHEDULES
Subject
& DETAILS

Revision - Sheet No.

NOTE: TOLERANCE ON THE NOMINAL MASS Date MAY, 2023 S-10


R.S.E
NO NOMINAL SIZE TOLERANCE ON THE NOMINAL MASS
mm %

1 UP TO AND INCLUDING 10 +/- 7


Owner

2 OVER 10 UP TO AND +/- 5


INCLUDING 16
Address
3 OVER 16 +/- 3
R.C.C PLINTH BEAM SCHEDULE
TOP REINFORCEMENT BOTTOM REINFORCEMENT TORSION STIRRUP
NAME SIZE (in) BAR
Right Right from left & right Middle Span
Left Middle Left Middle support (2h)
PB1 10"x 12" 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 10mmØ@4"C/C 10mmØ@6"C/C
PB2 10"x 15" 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 10mmØ@4"C/C 10mmØ@6"C/C

Project TWO STOREY


RCC CLASSROOM
(114'x32')

R.C.C PLINTH BEAM SECTIONS


REINFORCEMENT NOTE: TOLERANCE ON THE NOMINAL MASS
NAME & SIZE
LEFT MIDDLE RIGHT

NO NOMINAL SIZE TOLERANCE ON THE NOMINAL MASS Subject PLINTH BEAM SCHEDULES
PB1 (10"x12")
10" (Top Steel) 10" (Top Steel) 10" (Top Steel)
mm % & DETAILS
12"

12"

12"

10mmØ Stirrup 10mmØ Stirrup 10mmØ Stirrup


(Bottom Steel) (Bottom Steel) (Bottom Steel)
1 UP TO AND INCLUDING 10 +/- 7 Revision - Sheet No.

Date MAY, 2023 S-11


2 OVER 10 UP TO AND +/- 5
10" (Top Steel) 10" (Top Steel) 10" (Top Steel)
PB2 (10"x15") INCLUDING 16 R.S.E
15"

15"

15"

10mmØ Stirrup 10mmØ Stirrup 10mmØ Stirrup


(Bottom Steel) (Bottom Steel) (Bottom Steel)

3 OVER 16 +/- 3

Owner

Address
R.C.C FLOOR BEAM SCHEDULE
TOP REINFORCEMENT BOTTOM REINFORCEMENT TORSION STIRRUP
NAME SIZE (in) BAR
Right Right from left & right Middle Span
Left Middle Left Middle support (2h)
FB1 10"x 12" 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 10mmØ@4"C/C 10mmØ@6"C/C
FB2 10"x 15" 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 10mmØ@4"C/C 10mmØ@6"C/C
FB3 12"x 20" 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 2-16mmØ 10mmØ@4"C/C 10mmØ@6"C/C

Project TWO STOREY


RCC CLASSROOM
(114'x32')

R.C.C FLOOR BEAM SECTIONS


REINFORCEMENT NOTE: TOLERANCE ON THE NOMINAL MASS
NAME & SIZE
LEFT MIDDLE RIGHT

NO NOMINAL SIZE TOLERANCE ON THE NOMINAL MASS Subject FLOOR BEAM SCHEDULES
FB1 (10"x12")
10" (Top Steel) 10" (Top Steel) 10" (Top Steel)
mm % & DETAILS
12"

12"

12"

10mmØ Stirrup 10mmØ Stirrup 10mmØ Stirrup


(Bottom Steel) (Bottom Steel) (Bottom Steel)
1 UP TO AND INCLUDING 10 +/- 7 Revision - Sheet No.

Date MAY, 2023 S-12


2 OVER 10 UP TO AND +/- 5
10" (Top Steel) 10" (Top Steel) 10" (Top Steel)
FB2 (10"x15") INCLUDING 16 R.S.E
15"

15"

15"

10mmØ Stirrup 10mmØ Stirrup 10mmØ Stirrup


(Bottom Steel) (Bottom Steel) (Bottom Steel)

3 OVER 16 +/- 3

12" (Top Steel) 12" (Top Steel) 12" (Top Steel)


FB3 (12"x20") Owner
20"

20"

20"

10mmØ Stirrup 10mmØ Stirrup 10mmØ Stirrup


(Bottom Steel) (Bottom Steel) (Bottom Steel)

Address
R.C.C ROOF BEAM SCHEDULE
TOP REINFORCEMENT BOTTOM REINFORCEMENT TORSION STIRRUP
NAME SIZE (in) BAR
Right Right from left & right Middle Span
Left Middle Left Middle support (2h)
RB1 10"x 12" 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 10mmØ@4"C/C 10mmØ@6"C/C
RB2 10"x 15" 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 10mmØ@4"C/C 10mmØ@6"C/C
RB3 12"x 20" 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 4-20mmØ 2-16mmØ 10mmØ@4"C/C 10mmØ@6"C/C

Project TWO STOREY


RCC CLASSROOM
(114'x32')

R.C.C ROOF BEAM SECTIONS


REINFORCEMENT NOTE: TOLERANCE ON THE NOMINAL MASS
NAME & SIZE
LEFT MIDDLE RIGHT

NO NOMINAL SIZE TOLERANCE ON THE NOMINAL MASS Subject ROOF BEAM SCHEDULES
RB1 (10"x12")
10" (Top Steel) 10" (Top Steel) 10" (Top Steel)
mm % & DETAILS
12"

12"

12"

10mmØ Stirrup 10mmØ Stirrup 10mmØ Stirrup


(Bottom Steel) (Bottom Steel) (Bottom Steel)
1 UP TO AND INCLUDING 10 +/- 7 Revision - Sheet No.

Date MAY, 2023 S-13


2 OVER 10 UP TO AND +/- 5
10" (Top Steel) 10" (Top Steel) 10" (Top Steel)
RB2 (10"x15") INCLUDING 16 R.S.E
15"

15"

15"

10mmØ Stirrup 10mmØ Stirrup 10mmØ Stirrup


(Bottom Steel) (Bottom Steel) (Bottom Steel)

3 OVER 16 +/- 3

12" (Top Steel) 12" (Top Steel) 12" (Top Steel)


RB3 (12"x20") Owner
20"

20"

20"

10mmØ Stirrup 10mmØ Stirrup 10mmØ Stirrup


(Bottom Steel) (Bottom Steel) (Bottom Steel)

Address
SLABS SCHEDULE
Short Direction Long Direction
Type Thickness Layer Remark
(in) Cont: Midspan Discont: Cont: Midspan Discont:
Top 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c
S2 4.5 Two Way
Bottom 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c
Top 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c
S1 4.5 One Way
Bottom 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c

10d @ 6"c/c

10d @ 6"c/c
NOTE: TOLERANCE ON THE NOMINAL MASS
Project
4.5" Thk: Slab
NO NOMINAL SIZE TOLERANCE ON THE NOMINAL MASS TWO STOREY
10d @ 6"c/c mm %
S2 S2 10d @ 6"c/c RCC CLASSROOM
1 UP TO AND INCLUDING 10 +/- 7
X1 X1
(114'x32')
2 OVER 10 UP TO AND +/- 5
INCLUDING 16

3 OVER 16 +/- 3 FLOOR SLAB SCHEDULES


Subject
10d @ 6"c/c & DETAILS
10d @ 6"c/c
S1 S1 4.5" Thk: Slab

X2 X2
S1 & S2 Slab Plan
Scale : 1 Revision - Sheet No.
4" = 1'-0"

Date APRIL, 2023 S-14


10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c
10d @ 6"c/c 10d @ 6"c/c 10d @ 6"c/c
R.S.E
5"

4" 10d @ 6"c/c 4" 4" 10d @ 6"c/c 4"

10d @ 6"c/c 10d @ 6"c/c

S1 Slab Section X1-X1

Owner
10d @ 6"c/c 10d @ 6"c/c
10d @ 6"c/c 10d @ 6"c/c
5"

4" 10d @ 6"c/c 4" 4" 10d @ 6"c/c 4"

10d @ 6"c/c 10d @ 6"c/c

S2 Slab Section X2-X2


Address
Project
TWO STOREY RCC
CLASSROOM

12'-0"
Main Steel - 16mmØ @ 6" c/c
(114'x32')
Dist: Steel - 10mmØ @ 6" c/c
Waist - 5" tk
Subject STAIR DETAIL
Riser - 6"
Thread - 12"

Revision - Sheet No.

Date APRIL, 2023 S-15


R.S.E

STAIR DETAILS

Owner

Address

You might also like