Rate Amount

Sl. No. Description Quantity Per Unit


(in Rs.) (in Rs.)
1 Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank
for all lifts and with an initial lead of 3KM and up to 3m depth including all operational, incidental, labour charges such
as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work
excluding dewatering charges etc., as per SS 20 B(APSS 308).

(BLKD-CSTN-2-2)
Ordinary Soil - Mechanical Means up to 3m depth
Unit : 1 cum
Taking output : 240.00 cum
a) Labour
Mazdoor ( Unskilled) 8.32 Nos. 575.00 1 No. 4784.00
Add for MA @ 20% 0.20 4784.00 956.80
b) Machinery
Shovel 0.85 cum 110hp (Part I (I&CAD
Works)) 6.00 hours 3204.10 1 Hour 19224.60
Crew charges (Part I (I&CAD Works)) 6.00 hours 353.60 1 Hour 2121.60
Add MA on crew charges 0.20 2121.60 424.32
Conveyance for 3 Kms 240 cum 163.00 1 cum 39120.00
(Unloading at open area 3 Kms &
unloading at Site 3 Kms)
66631.32
Overheads & Contractors Profit @
13.615% 0.13615 66631.32 9071.85
Cost for 240 cum ( a+b+c+d) 75703.17
Rate per 1 cum (a+b+c+d) / 240 Total Rs. 315.43
Or Say 315.00

TGMSIDC Civil Data - 100 Bedded DH at Peddapalli Page-1 of 1