Signed OTL (1)
Signed OTL (1)
AIRCRAFT
OWNER
OPERATOR
A flight, shall not be commenced until the pilot has issued pilot’s acceptance report either on tech-log or any other appropriate document and flight preparation
forms have been completed, certifying that the pilot-in-command is satisfied that:
a) The aeroplane is airworthy and the appropriate certificates (i.e. airworthiness, registration) are on board the aeroplane;
b) The instruments and equipment prescribed in Para 6 of Section 8 Series “O” Part II for the particular type of operation are to be undertaken are installed
and are sufficient for the flight;
c) A maintenance release as prescribed in Para 8.7 of Section 8 Series “O” Part II has been issued in respect of the Aeroplane;
d) The mass of the aeroplane and centre of gravity location are such that flight can be conducted safely, taking in to account the flight condition expected;
g.2) The operations manual must describe the content and use of the operational flight plan.
Signature Not Verified
Unit Conversion: Litre to Pound Signed by: Deep
1 Litre = 2.2046 lbs Kumar
SECTION- ll
BEECHCRAFT B-300 (Super king Air 360) AIRCRAFT
VT- (MSN: )
S/N. DETAILS OF NEXT SCHEDULED MAINTENANCE/ OUT OF DUE AT /ON DONE AT/ON CRS NO. SIGN. (AME/AUTH. PERSON)
PHASE COMPONENT CHANGES DUE
AIRCRAFT PERFORMANCE LOG *ENGINE PARAMETERS: IN-FLIGHT PARAMETER TO BE RECORDED UNDER STABILIZED CRUISE CONDITIONS
SEC. TIME MACH IAS PRESSURE Ng (%) RPM (Np%) Torque (%) ITT (˚C) OIL PRESSURE (PSI) OIL TEMP. (˚C) FUEL FLOW (Lbs./Hr.)
OAT (˚C)
NO. (KNOTS) ALT. (FEET) LH RH LH RH LH RH LH RH LH RH LH RH LH RH
1)
2)
*NOTE: Parameters to be recorded in each sector under stabilized engine conditions and sector time is not less than 60 minutes.
PILOT DEFECT REPORT ACTION TAKEN REPORT PILOT SPECIAL REPORT
PILOT SIGN AME/AUTH. PERSONNEL
SEC NO DEFECT OBSERVED (IF NONE, ENTER NIL) RECTIFICATION / CRS NO. DATE
& LIC. NO. SIGN & LIC No.
1)
PILOT SIGN. & LIC NO.:
2)
DATE:
Distribution: 1st Copy: White page – To remain in the Book, 2nd Copy: Yellow Page- To subcontract CAMO, Certifies that the work, except as otherwise
3rd Copy: Blue Page - To flight operation, specified, was carried out in accordance with CAR-
Signature Not Verified
145 and in respect of that work on the aircraft is AME SIGN. & LIC NO.:
APPROVED BY DGCA VIDE LETTER NO.: DATE: DATE:
considered ready for release to service.
Signed by: Deep
………………………………………………………………….…………………………………………………….….……………………………………………………………………………………………………………………….………………………………………………………………………………………………………………...
Kumar
SECTOR NO.: DATE & TIME: SECTOR NO.: DATE & TIME:
PILOTS ACCEPTANCE CERTIFICATE OF A/C: PILOTS ACCEPTANCE CERTIFICATE OF A/C:
“I hereby certify that aircraft as per CAR section 8 series O part II has been complied with” and Section 4& 5 of the “I hereby certify that aircraft as per CAR section 8 series O part II has been complied with” and Section 4& 5 of the Tech Log
Tech Log read and understood read and understood
NAME: LIC NO.: PILOT SIGN: NAME: LIC NO.: PILOT SIGN:
AIRPORTS AUTHORITY OF INDIA Sheet No……….
SECTION- 4
VT- MSN:
DEFERRED DEFECT/MEL RELEASE
Details of AME’s
Work order Attended Sign and
Defect Place of Place of MEL Cat/ AME’s/PIC
Date / Sector & MEL no./Rectificati Station, Lic. No
S/N Reported By Details of Defect MEL MEL Deferred To Sign and Lic
Time Tech log Pg Ref. on Time /
AME/PILOT Invoke Revoke (Time/Date) No.
Carried Date
Out/CRS No.
Necessary maintenance support information which has to be brought to notice of commander needs to know other then above
S/N. Date of entry Maintenance Support Information Signature/Lic. No./ App. Closing Date with
No./Date Signature/Lic.No./App. No