Assignment 2-Network Design for a Company
Assignment 2-Network Design for a Company
This assignment is about designing a topology of a network for a critical large hospital
in which different departments have computers in different buildings and setting up their
network so that they can interact and communicate with each other by exchanging data.
The network is designed and simulated using a Cisco Packet Tracer (or other
alternatives).
Cisco Packet Tracer (CPT) is a multitasking network simulation software that can be
used to perform and analyze various network activities such as the implementation of
different topologies, selection of optimum paths based on various routers, and analysis
of different network configurations.
CASE STUDY
CCC (Computer & Construction Consultant) Agency was asked to design a computer
network to be deployed in the Main Site (at Ho Chi Minh City) and two Auxiliary Sites (at
DBPStreet and BHTQ Street) of a Specialized Hospital under construction. The key
characteristics of IT usage in this Hospital are as follows.
The data center, IT, and Cabling Central Local (using patch panelsgathering
wires)are located in a separateroom, 50 metersfrom buildings A and B.
For software acquisition, the Hospital uses a mix of licensed and open-source
software, hospital software (HIS, RIS - PACS, LIS, CRM, etc. ), office
applications, client-server applications, multimedia, and databases.
Other Sites:
The building has 2 floors, the first floor is equipped with 1 IT room and 1 Cabling
Central Local.
Implementing the connection between the main Site and the two Auxiliary Sites through
the WAN links, you can choose one of the technologies such as SD-WAN, MPLS, etc.
used for this link according to the cost of the solution.List all available out.
The dataflows and workload of the system (about 80% at peak hours 9g-11g and 15g-
16g) can be shared for the main Site and the two Auxiliary Sitesas follows:
Servers for software updates, web access, and database access, ..... The total
download estimate is about 1000 MB/day and the upload estimate is 2000
MB/day.
Each workstation is used for Web browsing, document downloads, and customer
transactions, ... The total download estimate is about 500 MB/day and the upload
estimate is 100 MB/day.
REQUIREMENTS
Analyze the network system requirements of the main Site and the two Auxiliary
Sites
Define areas with high load (network load) to select the appropriate device
configuration (load balancers are placed in necessary locations)
WAN connection diagram between the main Site and the two Auxiliary Sites(using
new WAN technology such as SD-WAN, MPLS, and OSPF routing protocol)
Step 4 (2 points): Design the network map using Packet Tracer or GNS3
simulation software
Step 5 (2 points):Test the system with popular tools such as ping, traceroute,
etc. on the simulated system.
Step 7 (1 point): Upload the simulation file (using Packet Tracer or GNS -3)
and the project report to BKeL before the deadline.
In the report and results demo of the Assignment, studentsare asked to test connectivity:
- Connect PCs between the main Site and the two Auxiliary Sites
For the talented engineer program, you are required to implement and test
a security solution for the Hospital:apply a security plan, add firewalls and
configure ACLs, implement IDS/ISP, and edit a security best practice guide.
REFERENCES
Information selectively comes from the Internet
TIMING
Softcopy (to be submitted to BKeL before the deadline) and hard copy (needed for
presentation and demo session).
NUMBER OF STUDENTS
GUIDES