Book1

permohonan pengambilan deposit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Book1

permohonan pengambilan deposit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 27

SAR TENTARA NASIONAL INDONESIA

DETASEWMEN MARKAS

RENOVASI GEDUNG PIMPIN


Analisa Harga Satuan Pekerjaan MA

Kode Satuan Koefesien


No. Uraian Pekerjaan
(ID) (Unit) (Index)
1 2 3 4 5
Pembongkaran Waterprofing Lama
. A Tenaga
a) Pekerja L.01 OH 0.2900
b) Mandor L.04 OH 0.0240
B Bahan
a)
b)
C Peralatan
a) Alat Angkat Ls 0.0004
b)
D Overhead & Profit 0.1500

Pembuangan Waterproofing Keluar Lokasi


A Tenaga
a) Pekerja L.01 OH 0.1100
b) Mandor L.04 OH 0.0200
B Bahan
a)
b)
C Peralatan
a) Alat Angkat Ls 0.0004
b)
D Overhead & Profit 0.1500

Plafond Gypsum Rangka Besi Hollow


A Tenaga
a) Pekerja L.01 OH 0.2000
b) Tukang L.02 OH 0.3000
c) Mandor L.04 OH 0.0300
B Bahan
a) Rangka Besi Hollow M1 0.6500
b) Papan Gypsum 9mm Lbr 0.3472
c) Skrup Gypsum Kg 0.1200
d) Compound Gypsum Kg 0.3000
C Peralatan
a) Alat Kerja Ls 0.0060
b)
D Overhead & Profit 0.1500

List Gypsum
A Tenaga
a) Pekerja L.01 OH 0.0400
b) Tukang L.02 OH 0.0750
c) Mandor L.04 OH 0.0030
B Bahan
a) List Gypsum M1 1.0500
b)
C Peralatan
a) Alat Kerja Ls 1.0000
b)
D Overhead & Profit 0.1500

Greding Permukaan Lantai Beton


A Tenaga
a) Pekerja L.01 OH 0.2000
b) Mandor L.04 OH 0.0300
B Bahan
a)
b)
C Peralatan
a) Alat Kerja Ls 0.0020
b)
D Overhead & Profit 0.1500
Lapisan Aspal Cair
A Tenaga
a) Pekerja L.01 OH 0.0800
b) Tukang L.02 OH 0.0750
c) Mandor L.04 OH 0.0050
B Bahan
a) Aspal tier Flinkote Ltr 0.1500
b)
C Peralatan
a) Alat Kerja Ls 1.0000
b)
D Overhead & Profit 0.1500

Waterproofing Membran Sanded


A Tenaga
a) Pekerja L.01 OH 0.6500
b) Tukang L.02 OH 0.7800
c) Mandor L.04 OH 0.3500
B Bahan
a) Membrane Sanded 3mm M2 1.1500
b) Gas Elpiji Kg 0.8500
C Peralatan
a) Alat Angkat Ls 0.0045
b) Alat kerja Ls 0.0066
D Overhead & Profit 0.1500

Waterproofing Membran Granule


A Tenaga
a) Pekerja L.01 OH 0.7000
b) Tukang L.02 OH 0.7800
c) Mandor L.04 OH 0.4000
B Bahan
a) Membrane Sanded 3mm M2 1.2000
b) Gas Elpiji Kg 0.8500
C Peralatan
a) Alat Angkat Ls 0.0055
b) Alat kerja Ls 0.0090
D Overhead & Profit 0.1500

Lapisan Kawat Kasa


A Tenaga
a) Pekerja L.01 OH 0.0450
b) Tukang L.02 OH 0.0300
c) Mandor L.04 OH 0.0100
B Bahan
a) Kawat Kasa M2 1.1500
b)
C Peralatan
a) Alat Angkat Ls 0.0045
b) Alat kerja Ls 0.0066
D Overhead & Profit 0.1500

Cor Mortar M Nol


A Tenaga
a) Pekerja L.01 OH 0.6800
b) Tukang L.02 OH 0.4800
c) Mandor L.04 OH 0.2500
B Bahan
a) Mortar ( Pasir +Semen) M3 0.0650
b)
C Peralatan
a) Alat Angkat Ls 0.0250
b) Alat kerja Ls 0.0250
D Overhead & Profit 0.1500

Grooting Pembuangan
A Tenaga
a) Pekerja L.01 OH 0.2500
b) Tukang L.02 OH 0.2000
c) Mandor L.04 OH 0.1000
B Bahan
a) Semen Grouting Kg 1.6000
b)
C Peralatan
a) Alat Kerja Ls 1.0000
b)
D Overhead & Profit 0.1500

Flashing Alumunium
A Tenaga
a) Pekerja L.01 OH 0.0500
b) Tukang L.02 OH 0.0700
c) Mandor L.04 OH 0.0100
B Bahan
a) Aluminium Siku M1 1.0000
b) Baut Bh 4.0000
C Peralatan
a) Alat Potong Ls 0.8500
b) Alat Bor Ls 0.8500
D Overhead & Profit 0.1500

Pengecatan Plafon Expose


A Tenaga
a) Pekerja L.01 OH 0.0400
b) Tukang L.02 OH 0.0700
c) Mandor L.04 OH 0.0200
B Bahan
a) Material Cat Ltr 0.3000
b)
C Peralatan
a) Rol, Kuas dan alat cat Ls 0.2000
b)
D Overhead & Profit 0.1500

Pengecatan Plafond Gypsum


A Tenaga
a) Pekerja L.01 OH 0.0400
b) Tukang L.02 OH 0.0600
c) Mandor L.04 OH 0.0100
B Bahan
a) Material Cat Ltr 0.2000
b)
C Peralatan
a) Rol, Kuas dan alat cat Ls 0.2000
b)
D Overhead & Profit 0.1500

Pengecatan Dinding Lisplang


A Tenaga
a) Pekerja L.01 OH 0.0400
b) Tukang L.02 OH 0.0650
c) Mandor L.04 OH 0.0200
B Bahan
a) Material Cat Ltr 0.3000
b)
C Peralatan
a) Rol, Kuas dan alat cat Ls 0.2000
b)
D Overhead & Profit 0.1500

Aquaproof Permukaan Dak Beton


A Tenaga
a) Pekerja L.01 OH 0.2000
b) Tukang L.02 OH 0.1500
c) Mandor L.04 OH 0.0500
B Bahan
a) Material Cat Ltr 0.3400
b)
C Peralatan
a) Rol, Kuas dan alat cat Ls 0.2000
b)
D Overhead & Profit 0.1500

Pembongkaran Panggung Rooftop

Pengecatan Dinding Roof Top


A Tenaga
a) Pekerja L.01 OH 0.0400
b) Tukang L.02 OH 0.0650
c) Mandor L.04 OH 0.0200
B Bahan
a) Material Cat Ltr 0.3000
b)
C Peralatan
a) Rol, Kuas dan alat cat Ls 0.2000
b)
D Overhead & Profit 0.1500

Kupas/Amplas Cat Lama


A Tenaga
a) Pekerja L.01 OH 0.1200
b) Mandor L.04 OH 0.0300
B Bahan
a)
b)
C Peralatan
a) Alat Kupas M2 0.5000
b)
D Overhead & Profit 0.1500
Pengecatan Pipa Besi
A Tenaga
a) Pekerja L.01 OH 0.0700
b) Tukang L.02 OH 0.0750
c) Mandor L.04 OH 0.0200
B Bahan
a) Material Cat Ltr 0.3000
b) Thineer Ltr 0.3500
C Peralatan
a) Alat Kerja Ls 0.2000
b)
D Overhead & Profit 0.1500

Pasang Keramik Lantai


A Tenaga
a) Pekerja L.01 OH 0.3500
b) Tukang L.02 OH 0.3500
c) Mandor L.04 OH 0.0533
B Bahan
a) Keramik Lantai Dus 1.0000
b) Semen PC Kg 7.4000
b) Pasir Pasang M3 0.0250
C Peralatan
a) Alat Kerja Ls 0.0700
b)
D Overhead & Profit 0.1500

Pasang Hebel
A Tenaga
a) Pekerja L.01 OH 0.0350
b) Tukang L.02 OH 0.0400
c) Mandor L.04 OH 0.0098
B Bahan
a) Bata ringan tebal 10 cm Bh 1.8300
b) Mortar siap pakai Kg 0.1000
C Peralatan
a) Alat Kerja Ls 0.0200
b)
D Overhead & Profit 0.1500
RENOVASI GEDUNG PIMPINAN, AULA GATOT SUBROTO, GEDUNG B1, B2 DAN B3
MABES TNI CILANGKAP JAKARTA

Harga Satuan Jumlah Harga Jumlah Harga Pelaksaanan


(Rp) (Rp) (Rp) Volume Satuan
6 7 8 9 10
57,000.00
48,540.00
150,000.00 43,500.00
210,000.00 5,040.00
-

1,400.00
3,500,000.00 1,400.00

49,940.00 7,491.00

25,000.00
20,700.00
150,000.00 16,500.00
210,000.00 4,200.00
-

1,400.00
3,500,000.00 1,400.00

22,100.00 3,315.00

178,000.00
90,300.00
150,000.00 30,000.00
180,000.00 54,000.00
210,000.00 6,300.00
61,413.89
35,000.00 22,750.00
85,000.00 29,513.89
65,000.00 7,800.00
4,500.00 1,350.00
3,900.00
650,000.00 3,900.00

155,613.89 23,342.08

53,000.00
20,130.00
150,000.00 6,000.00
180,000.00 13,500.00
210,000.00 630.00
23,100.00
22,000.00 23,100.00

3,000.00
3,000.00 3,000.00

46,230.00 6,934.50

49,000.00
36,300.00
150,000.00 30,000.00
210,000.00 6,300.00
-

7,000.00
3,500,000.00 7,000.00

43,300.00 6,495.00
47,000.00
26,550.00
150,000.00 12,000.00
180,000.00 13,500.00
210,000.00 1,050.00
9,000.00
60,000.00 9,000.00

6,000.00
6,000.00 6,000.00

41,550.00 6,232.50

490,000.00
311,400.00
150,000.00 97,500.00
180,000.00 140,400.00
210,000.00 73,500.00
94,750.00
75,000.00 86,250.00
10,000.00 8,500.00
20,238.00
3,500,000.00 15,750.00
680,000.00 4,488.00
426,388.00 63,958.20

562,000.00
329,400.00
150,000.00 105,000.00
180,000.00 140,400.00
210,000.00 84,000.00
134,500.00
105,000.00 126,000.00
10,000.00 8,500.00
25,370.00
3,500,000.00 19,250.00
680,000.00 6,120.00
489,270.00 73,390.50

79,000.00
14,100.00
150,000.00 6,750.00
175,000.00 5,250.00
210,000.00 2,100.00
34,500.00
30,000.00 34,500.00

20,238.00
3,500,000.00 15,750.00
680,000.00 4,488.00
68,838.00 10,325.70

467,000.00
238,500.00
150,000.00 102,000.00
175,000.00 84,000.00
210,000.00 52,500.00
63,700.00
980,000.00 63,700.00

104,500.00
3,500,000.00 87,500.00
680,000.00 17,000.00
406,700.00 61,005.00

180,000.00
93,500.00
150,000.00 37,500.00
175,000.00 35,000.00
210,000.00 21,000.00
62,400.00
39,000.00 62,400.00

1,000.00
1,000.00 1,000.00

156,900.00 23,535.00

72,000.00
21,850.00
150,000.00 7,500.00
175,000.00 12,250.00
210,000.00 2,100.00
38,000.00
36,000.00 36,000.00
500.00 2,000.00
3,400.00
2,000.00 1,700.00
2,000.00 1,700.00
63,250.00 9,487.50

57,000.00
22,450.00
150,000.00 6,000.00
175,000.00 12,250.00
210,000.00 4,200.00
25,500.00
85,000.00 25,500.00

2,400.00
12,000.00 2,400.00
50,350.00 7,552.50

32,000.00
18,600.00
150,000.00 6,000.00
175,000.00 10,500.00
210,000.00 2,100.00
7,000.00
35,000.00 7,000.00

2,400.00
12,000.00 2,400.00

28,000.00 4,200.00

49,000.00
21,575.00
150,000.00 6,000.00
175,000.00 11,375.00
210,000.00 4,200.00
19,500.00
65,000.00 19,500.00

2,400.00
12,000.00 2,400.00

43,475.00 6,521.25

104,000.00
66,750.00
150,000.00 30,000.00
175,000.00 26,250.00
210,000.00 10,500.00
22,100.00
65,000.00 22,100.00

2,400.00
12,000.00 2,400.00

91,250.00 13,687.50

5,994,471.70

49,000.00
21,575.00
150,000.00 6,000.00
175,000.00 11,375.00
210,000.00 4,200.00
19,500.00
65,000.00 19,500.00

2,400.00
12,000.00 2,400.00

43,475.00 6,521.25

33,000.00
24,300.00
150,000.00 18,000.00
210,000.00 6,300.00
-

5,000.00
10,000.00 5,000.00

29,300.00 4,395.00
72,000.00
27,825.00
150,000.00 10,500.00
175,000.00 13,125.00
210,000.00 4,200.00
33,250.00
70,000.00 21,000.00
35,000.00 12,250.00
2,400.00
12,000.00 2,400.00

63,475.00 9,521.25

275,150.00
124,943.00
150,000.00 52,500.00
175,000.00 61,250.00
210,000.00 11,193.00
110,820.00
65,000.00 65,000.00
1,800.00 13,320.00
1,300,000.00 32,500.00
3,500.00
50,000.00 3,500.00

239,263.00 35,889.45

43,600.00
14,308.00
150,000.00 5,250.00
175,000.00 7,000.00
210,000.00 2,058.00
22,610.00
12,000.00 21,960.00
6,500.00 650.00
1,000.00
50,000.00 1,000.00

37,918.00 5,687.70
Lampiran I Kontrak Kerja Konstruksi
Nomor KKK/ /IX/2024
Tanggal September 2024

Pelaksaanan KETERANGAN
Harga Satuan Jumlah Harga (Rp)
11 12 13