Work Done Certificate 3-1-2025
Work Done Certificate 3-1-2025
Certified that the following works pertains to M/s SKR Constructions India Private Limited (formerly M/s SKR Constructions),
Hyderabad have been completed satisfactorily.
S. Agreement Balance of
Agt. No. and Contract value Work done
No Name of Work concluding work Remarks
Date (in Rs.) (in Rs.)
. authority (in Rs.)
SE R&B 11,04,55,7
Widening & Strengthening of 02/24.25 Work in
Nalgonda 36.11 2,76,13,934.02 8,28,41,802.08
1 Chillepally - Somaram road from Dt: 10/06/2024 Progress
Km 0/0 - 10/0 in Suryapet District
Widening & Strengthening of
SE R&B
2 Huzurnagar-Yathavakila road 03/24.25 14,36,08,107.5 10,77,06,080.6 Work in
Nalgonda 3,59,02,026.89
from Km 7/0 to 16/5 in Suryapet Dt: 10/06/2024 9 9 Progress
District
Widening & Strengthening of
SE R&B
3 Chilkur - Jeripothulagudem road 09/24.25 10,97,61,890.8 Work in
Nalgonda 1,64,64,283.62 9,32,97,607.23
from Km 0/0 - 8/0 in Suryapet Dt: 15/06/2024 6 Progress
District
Widening and Strengthening
SE R&B
of Garidepally - Alingapuram 22/24.25 18,96,30,867.0 18,01,49,323.6 Work in
4 Nalgonda 94,81,543.35
road from Km 0/0 to 15/5 in Dt: 24/07/2024 0 5 Progress
Suryapet District
Executive Engineer,
R&B Division Suryapet,
Work Done Certificate
Certified that the following works pertains to M/s SKR Constructions India Private Limited (formerly M/s SKR Constructions),
Hyderabad have been completed satisfactorily.
Agreement Balance of
S. Agt. No. and Contract value Work done
Name of Work concluding work Remarks
No. Date (in Rs.) (in Rs.)
authority (in Rs.)
Executive Engineer,
PR Division Kodad,
Work Done Certificate
Certified that the following works pertains to M/s SKR Constructions India Private Limited (formerly M/s SKR Constructions),
Hyderabad have been completed satisfactorily.
Agreement Balance of
S. Agt. No. and Contract value Work done
Name of Work concluding work Remarks
No. Date (in Rs.) (in Rs.)
authority (in Rs.)
Package No.MBBD-PLK-04 (4 works) Work
SE PR
in Mahabubabad district Est cost Part completed
1 REGION 05.04.2022 8,39,81,632.00 8,39,81,632.00 -
A Rs.964.71 lakhs + Part B Rs.68.12 final bill to
WARANGAL be paid
lakhs = Rs.1032.82 lakhs
Package No.5(17 works)in
Thorrur(M)of Mahabubabad district
1)R/F PR road to Kasna thanda EC
2 Work
Rs.100.00 lakhs 2)PWD Road SE PR 37/2022-23
completed
(Haripirala) to Bhimuni Thanda EC REGION Dt:14.07.202 8,91,18,315.00 8,91,18,315.00 -
final bill to
Rs.60.00 lakhs 3)R/F R&B Road to WARANGAL 2 be paid
Seethya Thanda(deshya Thanda) EC
Rs.30.00 lakhs 4)R&B Road to
Hatchu thanda EC Rs.30.00
Package No.4 (6 works) in
Peddavangara(M) of Mahabubabad
district 1) Gantlakunta to Work
SE PR
Kanvaigudem EC Rs.75.00 lakhs 2) completed
3 REGION 5,73,43,946.00 5,73,43,946.00 -
Koripally to Rangapur EC Rs.120.00 final bill to
WARANGAL be paid
lakhs 3) R/F Bommakal to Ausali
Thanda EC Rs.135.00 lakhs 4)
Peddavangara
Special Repairs to Road From PWD
Road to BC Thanda to PWD Road
Peddamupparam (Danthalpally) via
SE PR /2023-24
Amarsingh Thanda, Haripirala, Work in
4 REGION Dt:23.09.202 14,59,30,889.77 8,75,58,533.86 5,83,72,355.90
Cheekatayapalem and Progress
WARANGAL 3
Peddamupparam in Thorrur Mandal
of Mahabubabad District -EC
Rs.1965.00 lakhs
Agreement Balance of
S. Agt. No. and Contract value Work done
Name of Work concluding work Remarks
No. Date (in Rs.) (in Rs.)
authority (in Rs.)
Package No.3/407/III/BTR/MRR (2
works) in Peddavangara (M) of
Mahabubabad district Pack EC
SE PR
Rs.975.00 lakhs 1) R/F PWD road to Work in
5 REGION 6,83,10,485.00 5,12,32,863.75 1,70,77,621.25
Pocharam via R.C thanda EC Progress
WARANGAL
Rs.600.00 lakhs 2) R/F PWD road to
Vaddekothapally via Bothala thanda
EC Rs.375.00 lakhs
Executive Engineer,
PR Division, Mahabubabad.