0% found this document useful (0 votes)
161 views5 pages

Work Done Certificate 3-1-2025

Uploaded by

S.Krishna Rao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
161 views5 pages

Work Done Certificate 3-1-2025

Uploaded by

S.Krishna Rao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Work Done Certificate

Certified that the following works pertains to M/s SKR Constructions India Private Limited (formerly M/s SKR Constructions),
Hyderabad have been completed satisfactorily.

S. Agreement Balance of
Agt. No. and Contract value Work done
No Name of Work concluding work Remarks
Date (in Rs.) (in Rs.)
. authority (in Rs.)
SE R&B 11,04,55,7
Widening & Strengthening of 02/24.25 Work in
Nalgonda 36.11 2,76,13,934.02 8,28,41,802.08
1 Chillepally - Somaram road from Dt: 10/06/2024 Progress
Km 0/0 - 10/0 in Suryapet District
Widening & Strengthening of
SE R&B
2 Huzurnagar-Yathavakila road 03/24.25 14,36,08,107.5 10,77,06,080.6 Work in
Nalgonda 3,59,02,026.89
from Km 7/0 to 16/5 in Suryapet Dt: 10/06/2024 9 9 Progress
District
Widening & Strengthening of
SE R&B
3 Chilkur - Jeripothulagudem road 09/24.25 10,97,61,890.8 Work in
Nalgonda 1,64,64,283.62 9,32,97,607.23
from Km 0/0 - 8/0 in Suryapet Dt: 15/06/2024 6 Progress
District
Widening and Strengthening
SE R&B
of Garidepally - Alingapuram 22/24.25 18,96,30,867.0 18,01,49,323.6 Work in
4 Nalgonda 94,81,543.35
road from Km 0/0 to 15/5 in Dt: 24/07/2024 0 5 Progress
Suryapet District

Executive Engineer,
R&B Division Suryapet,
Work Done Certificate
Certified that the following works pertains to M/s SKR Constructions India Private Limited (formerly M/s SKR Constructions),
Hyderabad have been completed satisfactorily.
Agreement Balance of
S. Agt. No. and Contract value Work done
Name of Work concluding work Remarks
No. Date (in Rs.) (in Rs.)
authority (in Rs.)

Package No: TS23GAIIIA05 (MRL06-


Work
Keethavarigudem Kokkireni R and B SE PR 2020-21,
3,82,57,591.0 completed
1 Road at Rangapuram to Sarvaram Via Nalgonda Dt:15.09.202 3,82,57,591.00 -
Kothagudem, Kothur, 0 0 final bill to
be paid
Keethavarigudem Funchtion hall,
Garidepally Mandal Suryapet Dist)
Package No: TS23NCIIIA07 (MRL11- Work
SE PR 2020-21,
2 Kandulavarigudem to Rollavarigudem 2,21,68,035.0 - completed
Nalgonda Dt:15.09.202 2,21,68,035.00
via Dirsencherla in Neredcherla(M),
0 0 final bill to
Suryapet Dist) under PMGSYIII be paid
Package No: TS23MOIIIA08 (MRL02- Work
SE PR 2020-21,
3 Sirikonda to Burkacherla via 2,67,92,793.0 - completed
Nalgonda Dt:15.09.202 2,67,92,793.00
Mekalapati thanda in Mothey Mandal
0 0 final bill to
Suryapet Dist) be paid
Work
Package Consisting of 4 Road SE PR 2020-2021,
3,83,02,241.0 completed
4 works in Huzurnagar Constituency Nalgonda Dt : 3,83,02,241.00
04.02.2021 0 - final bill to
Est Cost Rs 455.00 Lakhs be paid
Package No: TS23ANIIIB04 (MRL01- Work
SE PR 2021-2022,
Gondriyala PWD Road to NH 65 via 2,02,25,058.0 - completed
5 Nalgonda Dt : 2,02,25,058.00
Kothagudem, Mangalithanda of
27.02.2021 0 final bill to
Ananthagiri(M) in Suryapet Dist) be paid
Package No: TS23CKIIIB03 (MRL16-
Work
Chilkur-Bethole PWD road at 5 km 400 SE PR 2021-2022,
3,56,18,331.0 completed
6 m to NH 65 via Kondapuram, Nalgonda Dt : 3,56,18,331.00 -
Madhavagudem, Mukundapuram in 27.02.2021 0 final bill to
be paid
Chilkur(M) in Suryapet Dist)
Package No: TS23MUIIIB05 (MRL16- SE PR 2021-2022, 3,85,91,223.00 3,85,91,223.0 - Work
7 NH65 - Mothey R and B road at Nalgonda Dt : 0 completed
Vijayaraghavapuram to Nadigudem to 27.02.2021 final bill to
Ravipahad R and B road at be paid
Keshavapuram via Kalakova,
Jagannadhapuram of Munagala(M) in
Suryapet Dist)
Agreement Balance of
S. Agt. No. and Contract value Work done
Name of Work concluding work Remarks
No. Date (in Rs.) (in Rs.)
authority (in Rs.)
Package No: TS23HZIIIB06 (MRL17-
Kodad Miryalaguda R and B road at Work
SE PR 2021-2022,
Huzurnagar to Chilkur Bethavolu R and 3,73,33,858.0 completed
8 Nalgonda Dt : 3,73,33,858.00
B road via Madhavarainigudem,
27.02.2021 0 - final bill to
Marrigudem, Karakayalagudem of be paid
Huzur Nagar(M) in Suryapet Dist)
Work
Package consisting of 18road works in SE PR
3,82,26,996.0 completed
9 Huzur Nagar Constituency, Suryapet Nalgonda 05.04.2022 3,82,26,996.00 -
Dist Estt Cost Rs. 452.00 Lakhs 0 final bill to
be paid
Package No: Pkg-SRPT-HZR-
Huzurnagar(Consisting of 8 BT
Renewal works) (R/F Pwd Road
Neredcherla To Annaram Cart Bridge
Estt Cost: Rs.287Lakhs, Special Repairs
to R/F Palakeedu to Bettethanda via
sajjapuram Estt Cost: Rs.15Lakhs, R/F
Vajenepally To Dondapadu Estt Cost:
Rs.81Lakhs, R/F PWD road to PWD road Work
SE PR 62/2022-23,
via Bakkamantulagudem Estt Cost: 5,99,53,162.0 completed
10 Nalgonda Dt: 5,99,53,162.00
Rs.62Lakhs, R/F Donabandathanda To
29.08.2022 0 - final bill to
Hanumantulagudem Estt Cost: be paid
Rs.170Lakhs, R/F Mellacheruvu to
Choutupally R&B Road at 3/2 Km to
Venkatrampuram Estt Cost:
Rs.31Lakhs, R/F Venkatrampuram to
Marrichettu Estt Cost: Rs.67Lakhs,
Special Repairs to R/F Thammaram to
Chinthalapalem Estt Cost:
Rs.10.21Lakhs)

Executive Engineer,
PR Division Kodad,
Work Done Certificate
Certified that the following works pertains to M/s SKR Constructions India Private Limited (formerly M/s SKR Constructions),
Hyderabad have been completed satisfactorily.
Agreement Balance of
S. Agt. No. and Contract value Work done
Name of Work concluding work Remarks
No. Date (in Rs.) (in Rs.)
authority (in Rs.)
Package No.MBBD-PLK-04 (4 works) Work
SE PR
in Mahabubabad district Est cost Part completed
1 REGION 05.04.2022 8,39,81,632.00 8,39,81,632.00 -
A Rs.964.71 lakhs + Part B Rs.68.12 final bill to
WARANGAL be paid
lakhs = Rs.1032.82 lakhs
Package No.5(17 works)in
Thorrur(M)of Mahabubabad district
1)R/F PR road to Kasna thanda EC
2 Work
Rs.100.00 lakhs 2)PWD Road SE PR 37/2022-23
completed
(Haripirala) to Bhimuni Thanda EC REGION Dt:14.07.202 8,91,18,315.00 8,91,18,315.00 -
final bill to
Rs.60.00 lakhs 3)R/F R&B Road to WARANGAL 2 be paid
Seethya Thanda(deshya Thanda) EC
Rs.30.00 lakhs 4)R&B Road to
Hatchu thanda EC Rs.30.00
Package No.4 (6 works) in
Peddavangara(M) of Mahabubabad
district 1) Gantlakunta to Work
SE PR
Kanvaigudem EC Rs.75.00 lakhs 2) completed
3 REGION 5,73,43,946.00 5,73,43,946.00 -
Koripally to Rangapur EC Rs.120.00 final bill to
WARANGAL be paid
lakhs 3) R/F Bommakal to Ausali
Thanda EC Rs.135.00 lakhs 4)
Peddavangara
Special Repairs to Road From PWD
Road to BC Thanda to PWD Road
Peddamupparam (Danthalpally) via
SE PR /2023-24
Amarsingh Thanda, Haripirala, Work in
4 REGION Dt:23.09.202 14,59,30,889.77 8,75,58,533.86 5,83,72,355.90
Cheekatayapalem and Progress
WARANGAL 3
Peddamupparam in Thorrur Mandal
of Mahabubabad District -EC
Rs.1965.00 lakhs
Agreement Balance of
S. Agt. No. and Contract value Work done
Name of Work concluding work Remarks
No. Date (in Rs.) (in Rs.)
authority (in Rs.)

Package No.3/407/III/BTR/MRR (2
works) in Peddavangara (M) of
Mahabubabad district Pack EC
SE PR
Rs.975.00 lakhs 1) R/F PWD road to Work in
5 REGION 6,83,10,485.00 5,12,32,863.75 1,70,77,621.25
Pocharam via R.C thanda EC Progress
WARANGAL
Rs.600.00 lakhs 2) R/F PWD road to
Vaddekothapally via Bothala thanda
EC Rs.375.00 lakhs