0% found this document useful (0 votes)
19 views20 pages

06. 6th Exam Date 19-Nov-2018 + Answers (1)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views20 pages

06. 6th Exam Date 19-Nov-2018 + Answers (1)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

Exam # 6 (60 Minutes)

Pass Criteria =
23/27 = 85%
1
Question - 01

3 Minutes

Question - 02

2
Question - 03

5 Minutes

3
Question - 04

Question - 05

5 Minutes

4
Question - 06

3 Minutes
Question - 07

5
Question -8

4
Minutes

6
7
Question -8

Question - 10

8
Minutes
Question # 11

2 Minutes

8
Question # 12

2
Minutes

1
Question # 13

2 Minutes

13
Question # 14

2
Minutes

14
Question # 15
A foundation is considered as shallow if its depth is :
A. less than 1 meter
B. greater than its width
C. equal to or less than its width
D. greater than 1 meter

3 Minutes
Question # 16
Sustainable development involves: -
A. Larger buildings using stronger design and materials.
B. Developing better transportation by building more roads.
C. Reducing consumption, increasing efficiency and using renewable
energies.
D. Using all the resources at maximum rates.

12
Question # 17
Activity can be described as:
A. Arrow
B. Event
C. Effort
D. Effort and Time
3 Minutes
Question # 18
What is fast track contract?
A. Activities started at same time
B. Contractor can add resources at any time
C. Contract have many milestones
D. All above
Question # 19
Post tensioning system
A. was widely used in earlier days
B. is not economical and hence not generally used
C. is economical for large spans and is adopted now a days
D. none of these.

3 Minutes

Question # 20

Fixed price contract increase the risks on :


A. Contractor
B. Client
C. Consultant
D. All above
Question # 21
The nature of contact pressure distribution under a rigid footing
resting on a sandy soil and subjected to uniformly distributed
load is as shown in:

2
Minutes 15
Question # 22
The member which is placed horizontally to support common
rafter of a sloping roof, is
A. purlin
B. cleat
C. batten
D. strut. 3 Minutes

Question # 23

In case of multi storied buildings, the forms to be removed first


are
A. sides of beams and girders
B. column forms
C. bottom of beams and girders
D. all the above at the same time.
Question # 24

2 Minutes

17
Question # 25
The Temporary Building Permits can Give for :
(A) Start Mobilization and Site Sitting out
(B) Excavation and Sub-structure Work
(C) Execution Activities 5 Minutes
(D) Enabling Works Only
Question # 26

18
Question # 27

3
Minutes

19
p Correct
!!Question
Answer
#
1 D
2 D
3 B
4 C
5 A
6 D
7 B
8 C
9 A
10 C
11 C
12 D
13 C
14 A
15 C
Answers 16
17
C
A
18 A
19 B
20 A
21 B
22 A
23 A
24 B
25 B
26 C
27 B