Procedure_Installation & Commissioning

Installation and commissioning of IPS system

Uploaded by

SatyamMishra
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
14 views

Procedure_Installation & Commissioning

Installation and commissioning of IPS system

Uploaded by

SatyamMishra
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 54
HBL HBL Power Systems Limited Hyderabad - TS, india Electronics Group Procedure for Installation & Commissionii of Integrated Power Su Dociment NO.: EG-IC-PR-01, Rev. No: 00 Name Date G. Muralidhar Rao oplesleor Kv.Rajeoettar— |\\ AQ sales [>on AR Kishore , eles loon CONTROL OF CONFIDENTIALITY } The information contained in this document is the property of HBL, which reserves the right for distribution, application or reproduction for any usage. Procedure No. [EH 1CPROL BBE | sone fo forts System Pageno: [20164 Revision History Rev. | Dateor Rev. No Detalls of Char Reason for Chat No. | Revision cea te en To 0 | oaosit7 ‘Al Pages Initial Version| : ° Distribution List, ‘This Documented Information wil be uploaded in Configuration Management system Share Point and wil give access to all functional area's for necessary reference. Procedure for instalation & Commissioning | Rovson No. | 0 ProcedueNe, [EGICPROT tor PS Sytem a EC st of Abbreviations SLNo| Abbreviation Expansion 1% RDSO Research Designs and Standards Organtzation 2. PS Integrated Power Supply Syatem 3. FREC Foot Rectifier and Boost Charger 4 ‘ACO AC Distribution Panel 5. cor DC Distribution Panel 6. ‘SMR Switched Mode Rect 7. ‘SwPS ‘Switched Mode Power Supply 8. SER Sold state Relay ca ‘mntirg Cru Beaker 10. VRLA [Valve Regulated Lead Aclé Batteries " LMta/_<> [ow maintenance Lead Acid Batteries 2 Pee Printed Greut Bord = wore? THEVAL OMDE SENICONOUCTOR HELD EFFECT 14, AVR [AUTOMATIC VOLTAGE REGULATOR 16. ovr CONSTANT VOLTAGE REGULATOR 16 sou “Supervisory Contra Unit 17 Dc scu DC Supervisory Control Unit 18. ‘ASM Pane! Assistant Station Master Panel 19. ac Tastallaton and Commissioning 20. a Lightning Arrestor 2 ‘SPD ‘Surge Protection Device 2. Mov Metal Oxide Varistor HBL)" Procedure No, | EGICPROY for intalation & Commissioning | Ravilon’No. [0 for #8 System Pogo [400s 23 18 Terminal Block 24, or ‘CURRENT TRANSFORMER for sensing AC current 2. HT ‘Shunt for sensing DC current 28. toc Inter Cell Connector 21 AH “Ampere Hour unit for Battery capacity 28. v Volts 29, A ‘Ampere 30. Peck Pre-Commisioning Check Uist 34 ‘OEM Origind! Equtpmeit Manufacturer 32 PFC Potential Frée Contact 3. De Direct Curent 34, no Alternating Current 3. Ho Head Office 38. SPN Specification 37. IRS Indian Raiway Standard 38 oc ‘Constant Current Charging 38. cv ‘Constant Votage Charging 40. rot Interreck Connection Layout a. GAD General Arrangement Layout a cB ‘Central Distribution Block % Ew Electro Magnetic Intererence & oov Open Gireult Voltage %. 5E Service Engineer #6. 2s Zonal Service Head Procedure, [EGICPROI HBL Oe" evento “Table of Contents ‘Scope. Organization chart. Roles, Responsibilities and Authority. Process Flow Chart... Earthing 7 6.1 Earthing DO's & DON'Ts ” B 62, Earthing Detail... : —— SB 7 Site Survey TA Sie survey —detais a 72 Material receipt detail, 73 Site equipments load details, 8 Verification of PS Racks, Modle, LA& Batten 81 DO'S and DON” 82 Verification of FRBC Rack vn x 83 Verification of ACDP Rack received state. 84 Veriation of DCDP Rack received a it... 35 Verification of LA Box recived at site 36 SMR Modules. oy 87 Inverter Module y 88 Transformer Module x 89 CVT Modul. A y 810 DC-DCModsies aa B11 LMLA Batteries, yas B12__VREABaterioy 9 IPS Racks, LA Box, ASii Rack installation and Cable Routing. 9.1 IPS rack erecting aod cable routing the folowing procedure has tobe fliowed. 92. Lox erection and able routing the fllowing procedure has to be followed 93. ASM rack m 10. Testing of IPS Racks and Modules. 10.1 FRBC Rack and SMR modules testing. 102. ACDP rack and Inverter module esting Battery Charging - Ist Cycle: 124 Batery Charging -2nd Cycle: 125 Final Charging: 18 IPS System Testing. 14 PREPARATION OF PRE Cows SiONING CHECK List (PECL) 14.1 Performance Monitoring of IPS, 418. Specifications & Documentation. Specifications: Documentation Pre Commissioning Check List (PCC) ‘Original Equipment Manufscturer (OEM) Cerificate, Failure Information & Service Report. HBL "ne" Powe No EGicPRa! ‘Revisor No, Page Ne oom 156 TPS1&C Chock List... 16 Tools for I&C.. 47 Document Retention... HBE Procedure for instalation & Commissioning for iPS System ProcedireNe. [EGIGPROT Resin No, [0 Papen: | Tots 1 Purpose |. The installation & Commissioning procedure glves activites, which Service Engineer should, ensures that the required product commissioned at sites meets allthe ‘customer requirements. it, “These instructions also give necessary specification, documents / parameters to quality assurance testing / audit. “The objectives of Installation and Commissioning are ‘To complete I&C works at optimum cost and within the Schedules ‘To ensure continuous functioning of Systems In the respective installed b. 4 2 Scope sites, -. To ensure the completeness and. correctness of installation and ‘commissioning by adhering to RDSOguldelines and’ comply to the activities as specified in pre-cortmissicning checklist ‘To ensure that I8C team follows the JAC Procedure and User Manuals Installation & Commissioning tnstruetioné are prepared to cover all the quality ‘assurance in IPS system Instalgtion, Testing, Commissioning activities. 3 Organization chart, Figure 1: Organization Chart ‘General Manager 1&C and Service Head Dy. General Manager| IC and Service Head 1 SeMgrI&G, Serie tS ‘Nomth Zone 1&C, ‘East Zone 18C, ‘South Zone 18C, ] [West Zone lc, Service Head Service Head Service Head Service Head “Team “Team Team Team 1&C, Service T&C, Service IWC, Service ec, Service BBE | ttc [Resort fo Procedure Ne, [EGIC PROF for #3 3yst0m Pais masses scree 4. Roles, Responsibilities and Authority Goneral Manager Responsibilities: 4) Framing / defining objectives of I&C department, monitoring Corrective action for achieving the same. 2) Controling and Monitoring of RE PRODUCTS-I8C and Service, Including Spares and Manpower Management 3) Ensuring that employee skis set to meet job requirements. 44) Control and Monitoring of I&C payments. '5)_Monitoring of Qualty Audits after completion of 1&C. Authority: For Approval ofthe folowing: 1), Manpower planning & recntiment 2) Advance Payment to secs engjnéers for tours. 3). Service engineers sélary(OMt Rl) and monthly expenditures of ice branches: 4) Vendors work orders, cledrance for release of payments after completing works. 5)_AMC, ARC snd Spire prices for tender / budgetary quote. Dy. General Manager Responsibilities; 4, Framing / defting objectives of 1&C department, monitoring Corrective ction for achieving the objectives, .2.\Controling and monitoring of REPD PRODUCTS 418¢, including ‘Spares and Manpower Management. 3, Ensuring that employee skls set to meet job requirements. 44, Evaluation of Training being conducted to service engineers. 5. Ensuring & Implementation of ‘Quality Ault ater competion of lac. ©. Conirol and Monitoring of 1&C payments. | Ptanning & Monitoring of Quality Audis ater competion of &C__| Authority: For Approval ofthe folowing: 1, Manpower planning & recruitment. 2, Advance Payment io service engineers for tours. 3. Service engineers salary (Off Rol) and monthly expenditures of ‘service branches, 4. Vendors work orders, clearance for release of payments after completing works HBL Procedue Ne. [EGICPROI Procedure for iatallation & Commissioning | Revision No. fo for P3 3ystem Pogeno: | oose 1) Identify, Plan, monitor and Execute 18 activities for each PO. 2) Obtaining the deals trom Production (or from Share Point) to got