Schedule and General Specifications 0001

Schedule and spacifcation preparation

Uploaded by

misgana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Schedule and General Specifications 0001

Schedule and spacifcation preparation

Uploaded by

misgana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1670.

Schedule and General Specifications Project :- Ato Ermias Teklu


1
1.72
W1

on Second Floor 2 Level Scale 1:50 Residence


WD2

Room
5.23 m²

3.14
1.72 W2 W3

WD4
2
Room D1
13.80 m²

WD1 W1 WD2 D1 W2 W3 D2 WD3 W4 W5 WD4 D3 D4 WD5 WD6


1.72

3.30
D2
9 TW 1 Top 9 TW 1 Top
Water Tank level Water Tank level
D3 12.20 12.20

Room 56 m2
8.78 m²
Room
3 16.67 m²
8 MRO 1 Main

15
Roof Top Level
10.20
1471.3

1.72

1.72 7 RT 1Roof Terraces


Level on Landing
WD5 8.50

2.70

3.00

3.05
D4

6 S 2 Second Floor
Second Level
UP 6.80

15
5 S 1 Second Floor
WD1 W5 on Landing
5.516 20 1.25 4.00 20 5.10

1.72
EQ

5.05

5.05

5.05
WD6
EQ

DOOR AND WINDOW SCHEDULE


5
20

20

WD3 W4
3.616 961 773
1.70

4.425 5.55
1.791 3.609 5.45

A A'
B B' C D

Name
W1
WD4
1)T hicknes s :1.0mm,1.2mm,1.4mm,1.6mm,1.8mm,2.0mm
Aluminum 2)Color:can be cus tomized
Frame 3)S urface Treatment:powder coating ,PVDF
4)Type:thermal break/non thermal break

Hardware Chines e brand or foreign brand as cus tomer reques t

1,Type:s ingle , double ,tinted,all tempered


Glas s

S liding,
Des ign
can be cus tomized
WD2
S ize

Opening
S liding,s wing,tophung,fixed,folding
Way

WD2

WD2

WD1

D1-2

D3

W5
WD4