Compaction Test Results
Compaction Test Results
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-07
Date of Test 12/10/2021
Source/ Location of Murum NADAPA-07
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.921
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.2
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-05
Date of Test 6/10/2021
Source/ Location of Murum NADAPA-05
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.923
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.2
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-05
Date of Test 7/10/2021
Source/ Location of Murum NADAPA-05
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.923
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.2
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-10
Date of Test 14/11/2021
Source/ Location of Murum AMBARA-10
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-10
Date of Test 16/11/2021
Source/ Location of Murum AMBARA-10
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-03
Date of Test 13/10/2021
Source/ Location of Murum AMBARA-03
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.957
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.4
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-03
Date of Test 18/10/2021
Source/ Location of Murum AMBARA-03
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.957
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.4
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-08
Date of Test 26/10/2021
Source/ Location of Murum AMBARA-08
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-08
Date of Test 28/10/2021
Source/ Location of Murum AMBARA-08
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-07
Date of Test 1/11/2021
Source/ Location of Murum AMBARA-07
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-07
Date of Test 2/11/2021
Source/ Location of Murum AMBARA-07
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-03
Date of Test 2/11/2021
Source/ Location of Murum VALKA MOTA-03
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.927
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.6
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-03
Date of Test 6/11/2021
Source/ Location of Murum VALKA MOTA-03
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.927
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.6
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-16
Date of Test 20/09/2021
Source/ Location of Murum VALKA MOTA-16
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.959
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 11.2
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-16
Date of Test 8/10/2021
Source/ Location of Murum VALKA MOTA-16
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.959
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 11.2
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-02
Date of Test 10/10/2021
Source/ Location of Murum VALKA MOTA-02
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.928
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.8
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-02
Date of Test 21/10/2021
Source/ Location of Murum VALKA MOTA-02
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.928
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.8
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-13
Date of Test 8/11/2021
Source/ Location of Murum NADAPA-13
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-13
Date of Test 13/11/2021
Source/ Location of Murum NADAPA-13
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No GADANI-06
Date of Test 25/11/2021
Source/ Location of Murum GADANI-06
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %
REMARKS :
SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE