GREEN WORLD BUILDCON

AND INFRA PVT LTD.


FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-07
Date of Test 8/10/2021
Source/ Location of Murum NADAPA-07
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.921
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.2

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3150 3055 3037 3048
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2175 2080 2062 2073
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.131 2.038 2.021 2.031
f MR
g Moisture Content, MC = (W4/W5) x % 13 10 10 8
100 density
Dry (%) of soil, Yd =
h gm/cc 1.886 1.853 1.837 1.881
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.921 1.921 1.921 1.921
j OMC % 10.6 10.6 10.6 10.6
Compaction achieved,(Yd/MDD)x 100
k % 98.18 96.46 95.62 97.91
(%)
l Average compaction Achived (%) % 97.04

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-07
Date of Test 12/10/2021
Source/ Location of Murum NADAPA-07
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.921
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.2

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3038 3008 3028 3048
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2063 2033 2053 2073
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.022 1.992 2.012 2.031
f MR
g Moisture Content, MC = (W4/W5) x % 8 9 10 10
100 density
Dry (%) of soil, Yd =
h gm/cc 1.872 1.828 1.829 1.847
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.921 1.921 1.921 1.921
j OMC % 10.6 10.6 10.6 10.6
Compaction achieved,(Yd/MDD)x 100
k % 97.44 95.14 95.20 96.13
(%)
l Average compaction Achived (%) % 95.98

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-05
Date of Test 6/10/2021
Source/ Location of Murum NADAPA-05
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.923
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.2

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3042 3003 3024 3027
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2067 2028 2049 2052
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.025 1.987 2.008 2.011
f MR
g Moisture Content, MC = (W4/W5) x % 10 6 4 8
100 density
Dry (%) of soil, Yd =
h gm/cc 1.841 1.875 1.931 1.862
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.923 1.923 1.923 1.923
j OMC % 10.2 10.2 10.2 10.2
Compaction achieved,(Yd/MDD)x 100
k % 95.75 97.49 100.40 96.82
(%)
l Average compaction Achived (%) % 97.62

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-05
Date of Test 7/10/2021
Source/ Location of Murum NADAPA-05
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.923
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.2

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 2971 3004 3029 3127
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 1996 2029 2054 2152
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 1.956 1.988 2.013 2.109
f MR
g Moisture Content, MC = (W4/W5) x % 6 6 6 10
100 density
Dry (%) of soil, Yd =
h gm/cc 1.845 1.876 1.899 1.917
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.923 1.923 1.923 1.923
j OMC % 10.2 10.2 10.2 10.2
Compaction achieved,(Yd/MDD)x 100
k % 95.95 97.54 98.74 99.69
(%)
l Average compaction Achived (%) % 97.98

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-10
Date of Test 14/11/2021
Source/ Location of Murum AMBARA-10
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 2917 2986 2892 2930
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 1942 2011 1917 1955
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 1.903 1.971 1.878 1.916
f MR
g Moisture Content, MC = (W4/W5) x % 5 7 4 5
100 density
Dry (%) of soil, Yd =
h gm/cc 1.812 1.842 1.806 1.825
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 0 0 0 0
j OMC % 0 0 0 0
Compaction achieved,(Yd/MDD)x 100
k % #DIV/0! #DIV/0! #DIV/0! #DIV/0!
(%)
l Average compaction Achived (%) % #DIV/0!

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-10
Date of Test 16/11/2021
Source/ Location of Murum AMBARA-10
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 2945 2972 2988 3005
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 1970 1997 2013 2030
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 1.930 1.957 1.973 1.989
f MR
g Moisture Content, MC = (W4/W5) x % 4 5 5.5 7
100 density
Dry (%) of soil, Yd =
h gm/cc 1.856 1.864 1.870 1.859
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 0 0 0 0
j OMC % 0 0 0 0
Compaction achieved,(Yd/MDD)x 100
k % #DIV/0! #DIV/0! #DIV/0! #DIV/0!
(%)
l Average compaction Achived (%) % #DIV/0!

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-03
Date of Test 13/10/2021
Source/ Location of Murum AMBARA-03
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.957
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.4

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3135 3131 3059 3115
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2160 2156 2084 2140
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.117 2.113 2.042 2.097
f MR
g Moisture Content, MC = (W4/W5) x % 10 8 11 6
100 density
Dry (%) of soil, Yd =
h gm/cc 1.924 1.956 1.840 1.978
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.957 1.957 1.957 1.957
j OMC % 10.4 10.4 10.4 10.4
Compaction achieved,(Yd/MDD)x 100
k % 98.32 99.96 94.01 101.09
(%)
l Average compaction Achived (%) % 98.35

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-03
Date of Test 18/10/2021
Source/ Location of Murum AMBARA-03
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.957
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.4

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3036 3046 3044 3173
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2061 2071 2069 2198
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.020 2.029 2.027 2.154
f MR
g Moisture Content, MC = (W4/W5) x % 8.5 9 7 10
100 density
Dry (%) of soil, Yd =
h gm/cc 1.861 1.862 1.895 1.958
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.957 1.957 1.957 1.957
j OMC % 10.4 10.4 10.4 10.4
Compaction achieved,(Yd/MDD)x 100
k % 95.11 95.14 96.82 100.05
(%)
l Average compaction Achived (%) % 96.78

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-08
Date of Test 26/10/2021
Source/ Location of Murum AMBARA-08
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3080 3116 3135 3122
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2105 2141 2160 2147
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.063 2.098 2.117 2.104
f MR
g Moisture Content, MC = (W4/W5) x % 7 7 7 11
100 density
Dry (%) of soil, Yd =
h gm/cc 1.928 1.961 1.978 1.895
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 0 0 0 0
j OMC % 0 0 0 0
Compaction achieved,(Yd/MDD)x 100
k % #DIV/0! #DIV/0! #DIV/0! #DIV/0!
(%)
l Average compaction Achived (%) % #DIV/0!

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-08
Date of Test 28/10/2021
Source/ Location of Murum AMBARA-08
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 2964 3164 3143 3024
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 1989 2189 2168 2049
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 1.949 2.145 2.124 2.008
f MR
g Moisture Content, MC = (W4/W5) x % 6 13 13 7
100 density
Dry (%) of soil, Yd =
h gm/cc 1.839 1.898 1.880 1.876
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 0 0 0 0
j OMC % 0 0 0 0
Compaction achieved,(Yd/MDD)x 100
k % #DIV/0! #DIV/0! #DIV/0! #DIV/0!
(%)
l Average compaction Achived (%) % #DIV/0!

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-07
Date of Test 1/11/2021
Source/ Location of Murum AMBARA-07
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3022 3080 3154 3120
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2047 2105 2179 2145
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.006 2.063 2.135 2.102
f MR
g Moisture Content, MC = (W4/W5) x % 7 10 7 8
100 density
Dry (%) of soil, Yd =
h gm/cc 1.875 1.875 1.996 1.946
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 0 0 0 0
j OMC % 0 0 0 0
Compaction achieved,(Yd/MDD)x 100
k % #DIV/0! #DIV/0! #DIV/0! #DIV/0!
(%)
l Average compaction Achived (%) % #DIV/0!

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No AMBARA-07
Date of Test 2/11/2021
Source/ Location of Murum AMBARA-07
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3033 3002 3150 3098
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2058 2027 2175 2123
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.017 1.986 2.131 2.080
f MR
g Moisture Content, MC = (W4/W5) x % 6 8 10 8
100 density
Dry (%) of soil, Yd =
h gm/cc 1.903 1.839 1.938 1.926
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 0 0 0 0
j OMC % 0 0 0 0
Compaction achieved,(Yd/MDD)x 100
k % #DIV/0! #DIV/0! #DIV/0! #DIV/0!
(%)
l Average compaction Achived (%) % #DIV/0!

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-03
Date of Test 2/11/2021
Source/ Location of Murum VALKA MOTA-03
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.927
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.6

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3020 3110 3050 3125
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2045 2135 2075 2150
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.004 2.092 2.033 2.107
f MR
g Moisture Content, MC = (W4/W5) x % 9 13 10 9.5
100 density
Dry (%) of soil, Yd =
h gm/cc 1.838 1.851 1.848 1.924
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.927 1.927 1.927 1.927
j OMC % 10.6 10.6 10.6 10.6
Compaction achieved,(Yd/MDD)x 100
k % 95.41 96.08 95.92 99.85
(%)
l Average compaction Achived (%) % 96.81

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-03
Date of Test 6/11/2021
Source/ Location of Murum VALKA MOTA-03
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.927
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.6

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3080 3106 3092 3098
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2105 2131 2117 2123
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.063 2.088 2.074 2.080
f MR
g Moisture Content, MC = (W4/W5) x % 11 10 12 10
100 density
Dry (%) of soil, Yd =
h gm/cc 1.858 1.898 1.852 1.891
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.927 1.927 1.927 1.927
j OMC % 10.6 10.6 10.6 10.6
Compaction achieved,(Yd/MDD)x 100
k % 96.43 98.51 96.12 98.14
(%)
l Average compaction Achived (%) % 97.30

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-16
Date of Test 20/09/2021
Source/ Location of Murum VALKA MOTA-16
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.959
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 11.2

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3025 2985 3002 3058
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2050 2010 2027 2083
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.009 1.970 1.986 2.041
f MR
g Moisture Content, MC = (W4/W5) x % 6 5 5.5 7
100 density
Dry (%) of soil, Yd =
h gm/cc 1.895 1.876 1.883 1.908
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.959 1.959 1.959 1.959
j OMC % 11.2 11.2 11.2 11.2
Compaction achieved,(Yd/MDD)x 100
k % 96.74 95.75 96.11 97.38
(%)
l Average compaction Achived (%) % 96.49

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-16
Date of Test 8/10/2021
Source/ Location of Murum VALKA MOTA-16
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.959
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 11.2

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3038 2969 2963 3143
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2063 1994 1988 2168
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.022 1.954 1.948 2.124
f MR
g Moisture Content, MC = (W4/W5) x % 8 3.5 4 3
100 density
Dry (%) of soil, Yd =
h gm/cc 1.872 1.888 1.873 2.063
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.959 1.959 1.959 1.959
j OMC % 11.2 11.2 11.2 11.2
Compaction achieved,(Yd/MDD)x 100
k % 95.55 96.37 95.62 105.29
(%)
l Average compaction Achived (%) % 98.21

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-02
Date of Test 10/10/2021
Source/ Location of Murum VALKA MOTA-02
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.928
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.8

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3020 3005 3100 2990
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2045 2030 2125 2015
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.004 1.989 2.082 1.975
f MR
g Moisture Content, MC = (W4/W5) x % 8 7 9 7
100 density
Dry (%) of soil, Yd =
h gm/cc 1.855 1.859 1.910 1.845
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.928 1.928 1.928 1.928
j OMC % 10.8 10.8 10.8 10.8
Compaction achieved,(Yd/MDD)x 100
k % 96.24 96.43 99.09 95.71
(%)
l Average compaction Achived (%) % 96.87

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No VALKA MOTA-02
Date of Test 21/10/2021
Source/ Location of Murum VALKA MOTA-02
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc) 1.928
Name of the Project MORJAR WINDFARM PVT. LTD. OMC % 10.8

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3037 2997 3072 3118
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2062 2022 2097 2143
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.021 1.981 2.055 2.100
f MR
g Moisture Content, MC = (W4/W5) x % 9 8 7 7
100 density
Dry (%) of soil, Yd =
h gm/cc 1.854 1.835 1.920 1.963
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 1.928 1.928 1.928 1.928
j OMC % 10.8 10.8 10.8 10.8
Compaction achieved,(Yd/MDD)x 100
k % 96.15 95.16 99.61 101.79
(%)
l Average compaction Achived (%) % 98.18

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-13
Date of Test 8/11/2021
Source/ Location of Murum NADAPA-13
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3027 2994 3104 3014
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2052 2019 2129 2039
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.011 1.978 2.086 1.998
f MR
g Moisture Content, MC = (W4/W5) x % 6.5 8 7 7.5
100 density
Dry (%) of soil, Yd =
h gm/cc 1.888 1.832 1.950 1.859
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 0 0 0 0
j OMC % 0 0 0 0
Compaction achieved,(Yd/MDD)x 100
k % #DIV/0! #DIV/0! #DIV/0! #DIV/0!
(%)
l Average compaction Achived (%) % #DIV/0!

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No NADAPA-13
Date of Test 13/11/2021
Source/ Location of Murum NADAPA-13
Position/Layer 2nd Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3114 2989 2923 3018
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2139 2014 1948 2043
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 2.096 1.974 1.909 2.002
f MR
g Moisture Content, MC = (W4/W5) x % 5 6 7 7
100 density
Dry (%) of soil, Yd =
h gm/cc 1.996 1.862 1.784 1.871
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 0 0 0 0
j OMC % 0 0 0 0
Compaction achieved,(Yd/MDD)x 100
k % #DIV/0! #DIV/0! #DIV/0! #DIV/0!
(%)
l Average compaction Achived (%) % #DIV/0!

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE
GREEN WORLD BUILDCON
AND INFRA PVT LTD.
FREQUENCY: As per work Documents : GWBIPL / QC / Format / V-002
Location No GADANI-06
Date of Test 25/11/2021
Source/ Location of Murum GADANI-06
Position/Layer 1st Layer
Name of Laboratory GWBIPL MDD (g/cc)
Name of the Project MORJAR WINDFARM PVT. LTD. OMC %

Back Filling By Core Cutter Method

Sl No. Description Unit SAMPLE -1 SAMPLE -2 SAMPLE -3 SAMPLE -4


Weight of Core Cutter + wet soil, Wcs
a gm 3009 3020 3026 2990
(gm)
b Weight of Core Cutter, Wc (gm) gm 975 975 975 975
c Weight of soil, Ws = W2-W1 (gm) gm 2034 2045 2051 2015
Volume of core cutter, V = (3.14/4)x
d cc 1020.5 1020.5 1020.5 1020.5
D2 x H (cc)
e Wet density of soil, Yb = Ws/V (gm/cc) gm/cc 1.993 2.004 2.010 1.975
f MR
g Moisture Content, MC = (W4/W5) x % 7 6 8 9
100 density
Dry (%) of soil, Yd =
h gm/cc 1.863 1.890 1.861 1.811
yb/(1+(MC/100)) (gm/cc)
i Laboratory Density, MDD (g/cc) gm/cc 0 0 0 0
j OMC % 0 0 0 0
Compaction achieved,(Yd/MDD)x 100
k % #DIV/0! #DIV/0! #DIV/0! #DIV/0!
(%)
l Average compaction Achived (%) % #DIV/0!

REMARKS :

SIGNATURE FOR GWBIPL SIGNATURE FOR TP SIGNATURE FOR CUSTOMER SIGNATURE FOR GE