The Critical Path Method (CPM) and Program Evaluation Review Technique
(PERT) are powerful project management tools used to plan, schedule, and
monitor large engineering projects. Both methods help identify the
sequence of activities critical to project completion and manage time
effectively.
1|Page
likelihood and impact, and implementing strategies to mitigate or avoid
them.
2|Page
Resource leveling and resource smoothing are two techniques commonly
used to align resource availability with project requirements. Resource
leveling adjusts project schedules based on resource constraints, while
resource smoothing adjusts the allocation of resources without affecting
the project schedule. For instance, a construction project experiencing
labor shortages might reschedule tasks to ensure that available workers
can complete the project on time (Turner, 2018).