0% found this document useful (0 votes)
9 views

Project Items

Uploaded by

Hesham Hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Project Items

Uploaded by

Hesham Hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

PROJECT ITEMS CHECK LIST

Project No._________________________

Action Action Form Action or Form Responsible


Required Completed No Name for work
Obtain plans, proposals and cross sections from the Construction Project Manager
1 F F Office. and/or Inspector

Check the quantities on the contract plans. Project Manager


2 F F and/or Inspector

Make out field books Project Manager


3 F F and/or Inspector

Review section II of the KDOT construction manual. Project Manager


4 F F and/or Inspector

Complete a general review of the plans, proposals and cross Project Manager
5 F F sections and review project site. and/or Inspector

Obtain a copy of the CMS materials report from the Office Project Manager
6 F F Coordinator or CMS Technician. and/or
Bookkeeper

Obtain a laptop/PC from the Office Coordinator or CMS Project Manager


7 F F Technician and load project data. and/or
Bookkeeper

Format disks to be used for data transfer to the area machine and Project Manager
8 F F daily backup, (M,W,F)(T,Th,S). and/or
Bookkeeper

Review the CMS Materials Report and mark material items Project Manager
9 F F which will not be required

Review the CMS Materials Report for basis of acceptance of Project Manager
10 F F primary and component materials.

Create a list of required material certifications to presented to the Project Manager


1 F F contractor at the precon. conference.

259 & Send a letter to the successful bidder to advise him who to Office
260 contact to schedule preconstruction conference, include copies of
12 F F breakdown of trade wages. Include copies of KDOT forms no.
259 and 260, request for approval of subcontractors.

13 F F

14 F F

1
Required Submittals from Contractor
(Office will give copies to the Project Manager)

Names of all material suppliers with a list of their respective


1. F F materials.

Name and telephone number of project superintendent


2. F F including after hours number.

Name and telephone number of those responsible for traffic


3. F F control, including after hours number.

4. F F Mix design information. (concrete, bituminous, etc.)

Concrete Admixtures (see Special Provision 90M-30-R2) &


5. F F trial batches.

6. F F Process control plan.

7. F F Electronic fund transfer, (estimate payment), if desired.

8. F F SWPPP Plan from Contractor

9. F F Drill Shaft Plan.

2
Preconstruction Meeting

Forms Forms Form Contractor should submit the following


Required Completed No. items: Progress work schedule, safety
plan, EEO plan, breakdown of trade
259 & wages forms, KDOT forms 259 and
260 260, If not previously submitted,
F F & quality control plan, details and
1002 locations of borrow areas, construction
details and locations of haul roads,
1
details and locations of waste areas.
Submit form 1002, request for approval
of trainees Highway. If applicable, a
letter requesting Bi-monthly pay
estimates, a letter and invoice for the
payment of contract bond if applicable.
A request for electronic payment of
estimates.

2 F F Review project evaluation form. Project Manager

Check file copies of environmental Project Manager


3 F F permits.

4 F F Review Erosion control plan. Project Manager

5 F F Review Drilled Shaft plan. Project Manager

6 Talk to contractor about section corners Office and Project Manager


F F and quarter section points that will be
disturbed.

Inform the prime contractor of what is Office


7 F F require for the project bulletin board.

Record the minutes of the Office


8 F F Preconstruction meeting.

Write press release and notify District Office


9 F F PAM

10 F F Complete Alert Bulletin Office

3
Project Started

Submit for approval contractor borrow and/or waste areas, (cross section if Project Manager and/or
1 F F applicable.) Inspector

At least one month before construction of drilled shafts insure that the Project Manager and/or
2 F F contractor has submitted a drilled shaft installation plan. Inspector

Sample soil from borrow area and submit to regional materials lab for Project Manager and/or
3 F F standard proctor & atterburg limits. Inspector

Enter all test results and pay quantities (at a minimum of weekly.) Project Manager and/or
4 F F Inspector

Insure that all survey information is turned in to meet specification which Project Manager and/or
5 F F should include that the section corners have been referenced Inspector

6 F F 258 Check with CMS technician /Office Coordinator to insure that notice to
proceed has been issued.
Project Manager

Check with CMS technician/Office Coordinator to insure that all Project Manager
7 F F subcontractors for the project have been approved.

8 F F 258A Notify the CMS technician/Office Coordinator of work starting this date,
same day work begins. Notice of Work Starting
Project Manager

7 days in advance of the work, submit any information concerning road Project Manager and/or
9 F F closures, lasting for more than one day to the Construction Office. Inspector

Submit weekly: data transfer disk Project Manager and/or


10 F F Bookkeeper

Submit daily to the Construction Office: Lane closures or traffic control Project Manager and/or
1 F F changes for the next days work prior to 3:30 PM. Inspector

Submit Bi-monthly: Data transfer disk containing template data, which has Project Manager and/or
12 F F been checked against field books for contractor pay estimates. Bookkeeper

Check contractor bulletin board to insure conformance with special Project Manager and/or
13 F F provisions. Inspector

Videotape designated haul roads that were submitted at the preconstruction Project Manager and/or
14 F F conference. Inspector

Check to insure that the contractor has submitted an information sheet Project Manager and/or
15 F F (information on surveyor) to the office. Inspector

Check certified payrolls weekly for both the Prime and sub-contractors. Project Manager and/or
16 F F Inspector

Submit to Office reports for trainee hours. Project Manager and/or


17 F F Bookkeeper

18 F F 209 Conduct wage rate interviews, one per quarter, per contractor or sub-
contractor.
Project Manager and/or
Inspector

4
Enter test reports, as certifications are received, of materials used to complete Project Manager and/or
19 F F the Contract Materials Report Final. Inspector

Review Contract Materials Report @25%, 50%, 75%, or 20%, 40%, 60% Project Manager and/or
20 F F complete to insure that it is accurate and up to date. Inspector

2 F F 217 Submit as required: Log of Pile Project Manager and/or


Inspector

Submit as required: verification samples, i.e., Lime, Thermo plastic fly ash, Project Manager and/or
22 F F pavement marking beads, re-steel, cement, ect. Inspector

Check segregation of bituminous material. Project Manager and/or


23 F F Inspector

Begin a punch list for items requiring the contractor’s attention at the end of Project Manager and/or
24 F F phase or completion of project. Inspector

Record the completion date of pavement marking installation. Project Manager and/or
25 F F Inspector

Insure punch list item work is completed. Project Manager and/or


26 F F Inspector

27 F F 232 Have the project reviewed by the Engineer for issuance of Notice of partial
acceptance or, Notice of Acceptance.
Project Manager

28 F F 290 Submit form no. 290 for all accidents in the work zone. Project Manager and/or
Inspector

Check the percent of work completed against the percent of time completed. Project Manager and/or
29 F F See sect. 108.04, Std. Spec. Inspector

30 F F As project progress fill out project evaluation form. Project Manager

Check on QC/QA price adjustment during the contract. Project Manager and/or
3 F F Inspector

32 F F 242B
242C
or Check smoothness recap when complete. Project Manager and/or
Inspector

33 F F 266 Complete Earthwork Computations Project Manager and/or


Inspector

On projects with full federal oversight the FHWA must be notified of major Office and Project
34 F F changes in contractor. Manager

Deduct liquidated damages as soon as incurred, with approval of the Bureau Project Manager and/or
35 F F of Construction and Maintenance. Inspector

36 F F

37 F F

5
Finaling the Project

Establish the final quantities for each contract item. Project Manager and/or
1. F F Inspector

Enter comment into field documentation for all lines that are zeroed by Project Manager and/or
2. F F change order. Inspector

Write final change orders for the project based on final quantities and Project Manager and/or
3. F F submit to Construction Office. Inspector

292 Complete Price adjustment for Bituminous material on project. (IF Project Manager and/or
4. F F QC/QA project only need this form for the Commercial Grade Material, Inspector
i.e.: Class A or Class B)

Insure that the computations and recaps are submitted with the change Project Manager and/or
5. F F orders. Inspector

Balance Materials Report Final based on final change order quantities. Project Manager and/or
6. F F Inspector

Insure that the contractor has submitted all staking notes per Std. Spec. Project Manager and/or
7. F F Inspector

Pay final estimate quantities at the time of change order approval. Project Manager and/or
8. F F Inspector

9. F F 47 FHWA-47, Submit within 180 days of final acceptance Office

Review pavement marking at the end of the 180 day evaluation. Project Manager and/or
10. F F Inspector

11. F F 232 Issue Notice of Acceptance forms to District Office. Office

12. F F Std.
77
Std. Form no. 77, Tax exempt projects Office

13. F F 220 Certification of Completion of work. Office

14. F F 222 Affidavit of contractor Office

15. F F 265 Recapitulation of working days. (Projects under disincentive. Office

16. F F 270 DBE Affidavit. Office

17. F F 276 Certified inspector review, (LPA only). LPA Coordinator

18. F F 277 Complete Contractor Review Questionnaire Project Manager

Complete As-Built Plans Project Manager and/or


19. F F Inspector and/or Surveyor

20. 1 F F Letter of certification of acceptance tests. Project Manager

21. F F Deviations and Exceptions report. Project Manager

6
When 657 form from the District Engineer is received, archive the Office, Project Manager &
22. F F project off of the area machine and submit files and field books to the Bookkeeper
district office.

7
COMPLETION OF PROJECT

1. 299 Forms 299 shall be submitted when all items are Office
F F complete.

2. 235 LPA Projects – Complete Project Related Items Checklist LPA Coordinator
F F

3. In-depth inspection reports for all new or repaired Office and/or


F F bridges. Project Manager

4. Submit completed project rehabilitation form. Office and/or


F F Project Manager

5. F F

6. F F