20241104 Regarding submission of EMF Triennial self-certificate on NEP

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

20241104 Regarding submission of EMF Triennial self-certificate on NEP

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

File No. HRCO-20/15/1/2021-CMTS HR CO (Computer No.

47241)
I/768395/2024

Office of Chief General Manager


Haryana Telecom Circle
107, The Mall
Ambala Cantt, Haryana-133001

04.11.24

To

All BA Heads,
Haryana Telecom Circle.

Subject: Regarding submission of EMF Triennial self-certificate on NEP.


Reference: BSNLCO-NOCM/34(11)/1/2020-NWO-CM1 dated 04.10.2024

Kindly refer the abovementioned letter from Head Office, New Delhi regarding the
Triennial submission. BSNL Haryana has to submit EMF self-certificates of 2437 BTSs
(existing at 1271 sites) on National EMF Portal (NEP) for the triennial cycle ending
31.03.2025. List of the same is available on NEP under ‘Reports>Triennial Report’.
BA/OA wise summary is as under:

S. BA/OA Number Num Tentative Tentative Time Window for which


no. of BTS ber of no. of sites no. of sites Broadband Meter is
sites which may for allotted
be which
submitted Broadband
by (BB)
calculation Measurem
(EIRPth) ent
method is required

1 Karnal 245 147 111 36 4th – 10th Nov ‘24


2 Sonipat 207 104 91 13 12th – 14th Nov ‘24
3 Rohtak 406 206 122 84 16th – 30th Nov ‘24
4 Gurugram 107 57 54 3 2nd – 3rd Dec ‘24
5 Faridabad 166 87 79 8 5th – 6th Dec ‘24
6 Rewari 199 101 66 35 8th – 14th Dec ‘24
7 Hisar 527 283 249 34 16th – 22nd Dec ‘24
8 Jind 268 134 109 25 24th – 28th Dec ‘24
9 Ambala 312 152 126 26 30th Dec ’24 – 5th Jan ‘25

EMF self-certificates are to be submitted after collecting survey data, photographs etc.
from the field. RF parameters available on NEP must be verified as per actual parameters
existing in the field. In case any discrepancy is found in RF parameters the same has to
be reported to Circle before submission of the EMF self-certificate on NEP. If any of the
sites gets non-compliant by calculation method the same has to be tested by broadband
method. Time window of BA/OA wise allotment of Broadband Meter is mentioned above
in the table. BAs may plan survey of sites under BB measurement category accordingly.
Regd. & Corporate Office: Bharat Sanchar Bhawan, HCM Lane, Janpath, New Delhi – 110001
Corporate Identity Number (CIN): U74899DL2000GOI107739 / Website:
1 www.bsnl.co.in

Generated from eOffice by Vishal Kohli, AD(VK) CMP HR CO, AD(NWP-CM-III) HR CO, BSNL HR CO on 04/11/2024 05:45 pm
File No. HRCO-20/15/1/2021-CMTS HR CO (Computer No. 47241)
I/768395/2024

Office of Chief General Manager


Haryana Telecom Circle
107, The Mall
Ambala Cantt, Haryana-133001

As it is a time bound activity, all BAs should ensure that field data collection
is completed before 10.01.2025 and submission of EMF self-certificate is completed
by 15.01.2025 on NEP. All certificates need to be signed digitally by Circle Nodal
Officer, before final submission to DoT. Hence, All BAs must ensure to submit the
EMF self-certificates on NEP by 15.01.2022.

Encl.: Referred letter of Head Office, New Delhi.

(Naresh Sehgal)
AGM (NWP-CM), Ambala

Regd. & Corporate Office: Bharat Sanchar Bhawan, HCM Lane, Janpath, New Delhi – 110001
Corporate Identity Number (CIN): U74899DL2000GOI107739 / Website:
2 www.bsnl.co.in

Generated from eOffice by Vishal Kohli, AD(VK) CMP HR CO, AD(NWP-CM-III) HR CO, BSNL HR CO on 04/11/2024 05:45 pm