Service Report 23-00111 (SIGNED)
Service Report 23-00111 (SIGNED)
HAFIZUDDIN FARHAN
NAME HAFIZUDDIN ABDUL RAZAK NAME FARHAN FARMIE NAME
DESIGNATION SERVICE ENGINEER DESIGNATION SERVICE MANAGER DESIGNATION
DATE 25/9/2023 DATE 25/9/2023 DATE 25/10/2023
VALVE LIST
Customer : TNB MANJUNG 5 SDN BHD
Project : PROVISION OF MANPOWER, TOOLS, EQUIPMENT AND CONSUMABLES TO
: PERFORM VALVE SERVICING FOR TNBJ M5 BOILER
PO No. : 0041772203
VALSER Job No. : 23-00111
Prepared By :-
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
Valve has been dismantled for further inspection and servicing works
During dismantling process, several nuts was jammed, after discussion with clients, the nuts will be cut and replaced
Found minor cuts & scratches on the valve plug and seat
There's no unusual defect found on the other valve parts
QP29.078R2
SERVICE REPORT PAGE 3 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
VALVE AS PER FOUND CONDITION VALVE HAS BEEN CUT FROM THE LINE
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
The actuator unit has been detached before valve dismantling works
Valve has been dismantled for further inspection and servicing works
Found scratches on the valve plug and seat ring
There's no finding on the other valve parts
QP29.078R2
SERVICE REPORT PAGE 3 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
The stem plug and seat ring were replaced with new ones
Contact check for the plug and seat has been performed and witnessed by client's representative
All the gaskets and packing has been replaced to new ones
Valve has been reassembled to its original position and orientatiton
All the nuts were tightened with HTW to the respective torque value
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
The actuator unit has been detached before valve dismantling works
Valve has been dismantled for further inspection and servicing works
Found scratches on the valve plug and seat ring
There's no finding on the other valve parts
QP29.078R2
SERVICE REPORT PAGE 3 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
The stem plug and seat ring were replaced with new ones
Contact check for the plug and seat has been performed and witnessed by client's representative
All the gaskets and packing has been replaced to new ones
Valve has been reassembled to its original position and orientatiton
All the nuts were tightened with HTW to the respective torque value
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
The actuator unit has been detached before dismantling works, and placed securely on the side
Valve has been dismantled for further inspection and servicing works
Found steam cut on the valve plug and scratches on the seat ring
There's no finding on the other valve parts
QP29.078R2
SERVICE REPORT PAGE 3 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
The stem plug and seat ring has been replaced with new ones
Contact check for the stem plug and seat ring has been performed and witnessed by client's representative
All the other valve parts has been cleaned
New gaskets and gland packing sets has been installed
The valve has been reassembled to its original position and orientation
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
The valve plug and seat has been sent to machine shop for skimming works
After collecting the plug and seat ring, contact check has been performed and witnessed by client's representative
All the soft parts has been replaced to new ones
Valve has been reassembled to its original position and orientation
All the valve body nuts has been tightened by HTW to the respective torque value
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
The stem plug, seat ring, cage has been replaced to new ones
Contact check for the plug and seat has been performed, witnessed by client's representative
All the gaskets and gland packing has been replaced to new ones
Valve has been reassembled to its original position and orientation
All the valve body nuts has been tightened by HTW to the respective torque value
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
The valve plug and seat ring has been replaced to new ones
Contact check has been performed and witnessed by client's representatives
All the soft parts has been replaced to new ones
Valve has been reassembled to its original position and orientation
All the valve body nuts has been tightened by HTW to the respective torque value
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
The stem plug and seat ring has been replaced with new ones
Contact check for the plug and seat has been performed and witnessed by client's representative
All the soft parts has been replaced to new ones
Valve was reassembled to its original position and orientation
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
Actuator has been detached before dismantling works, and placed securely on the side
Valve has been dismantled for further inspection and servicing works
Found steam cut on the valve plug, and cracks on the seat ring and cage
There's no other finding on the other valve parts
QP29.078R2
SERVICE REPORT PAGE 3 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
The stem plug, seat ring, and cage has been replaced to new ones
Contact check for the plug and seat has been performed, witnessed by client's representative
All the soft parts has been replaced to new sets
The valve was reassembled to its original position and orientation
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :
Reported Complaint(s);-
Gland Leak
1. Inspection 4. Testing
Scope of work 2. Service/Repair 5. Dimension Measurement
Dismantle &
3. Lubrication & Sealing 6. Other (specify) Reassemble
1. Serenia Workshop
Service Location
2. Other Location (specify) M5 Boiler Area
Remark(s)
QP29.078R2
SERVICE REPORT PAGE 2 of 4
Other(s)
Applicable
B. ACTUATOR
Not Applicable
Actuator Parts Qty Actuator Parts Qty
N/A N/A
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
N/A N/A
Touch up /
Blasting Machining
Refurbish Painting
*Please select if applicable: Required/ Not Required
Required
Testing
Not Required
Other(s)
Applicable
C. INSTRUMENTATION CONTROLS
Not Applicable
Instrumentation Parts Qty Instrumentation Parts Qty
Parts To Be N/A N/A
Replaced N/A N/A
N/A N/A
Required
Testing
Not Required
Other(s)
QP29.078R2
SERVICE REPORT PAGE 4 of 4
APPENDIX (ATTACHED) :