0% found this document useful (0 votes)
13 views3 pages

Installation and Assembly of the Meter Box SAFE WORK (1)

Uploaded by

sh0ai8786ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views3 pages

Installation and Assembly of the Meter Box SAFE WORK (1)

Uploaded by

sh0ai8786ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Hazard identification and risk assessment

OHS-PR-02-03-F07 Safe Work Procedure

Job/Task Type: Installation and assembly of the meter box


Department / Department: ARAR Electricity Department
Prepared by: SULTAN MOAHMED / BASIL SARI Safe Work Procedure No.SWP-CN-PRJ-
/ RAKAN NWAF 20
Director Approval: SAED HAMED 01/01/2024 to Date: 01/01/2025
respirators safety clothing safety shoe Face and eyes Helmet
protection Required personal protective
equipment
Other Select Arc Protection Equipment hand gloves safety belts Hearing protection

Safe work procedure analysis


the dangers
The necessary controls to reduce or effect In each step, what are the things that
Put all the steps needed to perform this task in order number
eliminate this risk (Injury - damage - may cause injury, loss, damage or
material losses) step
interruption?=
Not working without proper safety tools Injury - damage - Burning, electrical short, injury to the Use proper equipment and tools for all technicians and
1
and equipment material losses face, eyes, hands, feet, body. contractors
Non-specialists are not allowed to enter Injury - damage -
the work area. material losses
Not to enable unauthorized persons to
work/ensure the regularity of the labor at
Electrocution, falling tools and
the site/not to open or close any valves or
equipment, injuring the body, falling secure the site 2
electrical switches or operate any part in
into the hole.
the company’s facilities in the absence of
the work permit designated for that and
provided that this is only done under the
supervision of the operating observer
Use of personal protective equipment Injury - damage -
Minor cut, injury, meter damage, flying
Caution while moving the meter box from material losses meter box installation 3
objects
the vehicle to the site
of31Page Approved Document Rev. 01 [May - 2020]
Hazard identification and risk assessment
OHS-PR-02-03-F07 Safe Work Procedure

Install the meter box correctly.


Ensure that human factors engineering
procedures are followed while
transporting heavy objects from the
physical strength of the contractor's labor
and the correct lifting method.
Use personal protective equipment from: Injury - damage -
1- hand insulating glovesClass 0) material losses
2- safety shoe (Class EH) Electrocution, wounding, injury to the
Ensure that the source of nutrition is isolated 4
3- safety helmet (Class E) face, eyes and body
4- electric arc prosthesis (CAT 2)
5- face shield (CAT 2)
Follow and apply the work permit steps Injury - damage -
Receiving the work permit and making sure that the arrest
Ensure that arrest cards are hung on each material losses Minor cut, injury, electrocution 5
cards and locks are hung, as possible, on the isolation points.
isolation point.
Ensure that the cables are connected Injury - damage -
correctly and the cable insulators are in material losses
good condition Minor cut, injury Connecting the cables to the power supply 6
Wear personal protective equipment
(safety helmet, safety shoes, hand gloves)
Ensure that the work is finished and that Injury - damage -
the site is free of employees or the general material losses
public. Minor cut, injury, electrocution Handing over arrest cards and termination of work 7
Assign someone to monitor the site during
the re-current process.

of32Page Approved Document Rev. 01 [May - 2020]


Hazard identification and risk assessment
OHS-PR-02-03-F07 Safe Work Procedure

Use personal protective equipment from: Injury - damage -


1- hand insulating glovesClass 0) material losses
2- safety shoe (Class EH)
Electrocution, injury Ensure that the current reaches the subscriber 8
3- safety helmet (Class E)
4- electric arc prosthesis (CAT 2)
5- face shield (CAT 2)