0% found this document useful (0 votes)
12 views

Assignment-2024-G2

Uploaded by

Srishti Kumari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Assignment-2024-G2

Uploaded by

Srishti Kumari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DEPARTMENT OF OCEAN ENGINEERING, IITMADRAS

V Semester B.Tech. (Naval Architecture &Ocean Engineering)


OE 3190 Design of Ocean Structures
Aug. – Nov. 2024

ASSIGNMENT (submission deadline TWO WEEKS from the date of assignment)


Rubble Mound Structure 05-09-2024
COMMON QUESTION TO ALL
List 5 distinct layers of a rubble mound breakwater. Write the functional and structural design
principles of each layer. (Write in your own sentences with your understanding).

INDIVIDUAL QUESTION TO EACH AS PER ROLL NO.


NA22B009 Q1
NA22B021 Q2
NA22B023 Q3
NA22B031 Q4
NA22B042 Q5
NA22B043 Q6
NA22B045 Q7
NA22B048 Q8
NA22B055 Q9
NA22B073 Q10

1. Design a non-overtopping rubble mound breakwater in a water depth of 9m, off a


location with the high tidal level of 0.8m. The offshore wave climate is 4m with the
mean period of 8s. The seabed is of very fine silt with a mean diameter of 0.1mm. Adopt
a run-up of (Hdesign*(1+cot )/2), where  is the side slope of the breakwater.
2. Design the armour layer of a rubble mound breakwater in a water depth of 9m. The
maximum tide level at this location is +0.9m. Storm surge at this location is 0.5m. The
offshore design wave height (Hs) is given as 5.2m and the mean wave period is 8s. Draw
the typical breakwater section and highlight the armour layer only with dimensions. The
seabed is of fine sand. Adopt the unit weight of rubble stones as 2.65 T/m 3, concrete: 2.4
T/m3; and, water: 1.03 T/m3, if required.
3. Design the armour and toe layers of a rubble mound breakwater in a water depth of 6m.
The maximum tide level at this location is +0.9m. Storm surge at this location is 0.5m.
The offshore design wave height (Hs) is given as 5.2m. Draw the typical breakwater
section and highlight the present design part with dimensions. The seabed is of fine silty
sand. Adopt the unit weight of rubble stones as 2.65 T/m3, concrete: 2.4 T/m3; and,
water: 1.03 T/m3, if required.
4. Design the core layer of a rubble mound breakwater in a water depth of 12m. The
maximum tide level at this location is +1.1m. Storm surge at this location is 0.25m. The
offshore design wave height (Hs) is given as 8m. Draw the typical breakwater section and
highlight your design part with dimensions. The seabed is of fine silty sand. Adopt the
unit weight of rubble stones as 2.65 T/m3, concrete: 2.4 T/m3; and, water: 1.03 T/m3, if
required.
5. Design the armour layer of the rubble mound breakwater to be constructed in a water
depth of 12m with reference to CD. The maximum tide level is +1.8m and the storm
surge is +0.8m. The offshore design wave height is 7m and period is 12s. Draw the entire
cross section and mark the different water levels and salient details of the armour layer.
6. Design of a breakwater was carried out by adopting s = 26.5 kN/m3. But during
execution, s of the stone was found to be 32 26.5 kN/m3. Will you accept the design?
Justify your answer.
7. Design the armour layer of the rubble mound breakwater to be constructed in a water
depth of 5m with reference to CD. The maximum tide level is +0.8m and storm surge is
+0.5m. The offshore design wave height is 2.0m and period is 8s. Draw the section and
mark the salient details of the armour layer. The seabed is of fine silty sand.
8. Design the rubble mound breakwater section in a water depth of 18m for Mormugoa
Port. The highest high tide level is +1.2m. Storm surge at this location is 1.0m. The
offshore design wave height (Hs) is given as 7.0m. Draw the breakwater design section
with dimensions. The seabed is of coarse sand to rocky strata. Adopt the unit weight of
rubble stones as 2.55 T/m3, concrete: 2.4 T/m3; and, water:1.03T/m3, if required.
9. Design a suitable armour layer for a breakwater to be constructed in a water depth of
14m. The high water level is +1.1m; design wave height is 6m and wave period is 9s.
Draw the breakwater section with all salient dimensions for the armour layer.
10. Design the rubble mound breakwater section in a water depth of 12m for Chennai Port
outer harbour development. The highest high tide level is +1.2m. Storm surge at this
location is 1.0m. The offshore design wave height (Hs) is given as 9.0m. Draw the
breakwater design section with dimensions. The seabed is of fine sand. Adopt the unit
weight of rubble stones as 2.65 T/m3, concrete: 2.4 T/m3; and, water:1.03T/m3, if
required.