DD015018 P0008
DD015018 P0008
Please don’t use any Symbols in Specified Dimension, Lower Tolerance, upper tolerance and actual measured columns. Only numerical number to
8
be entered.
In Case, if any wrong value or measured value typed in column H, I, J, K & L w.r.t specified value, Is
Lower > Then cell colour will become YELLOW
10
Higher > Then cell colour will become ORANGE
Operator will be triggered to verify input data during preparation of report.
a) Please change Inspected By & Approved By scope w.r.t TMEIC Engineer Name and Supplier Engineer Name as applicable (In Page setup - Footer
section)
b) While giving printout, please follow below instructions,
11 > For machined components (Where there is no painting scope), select 2 sections at a time (Cover sheet, Dimension report)
> For fabricated components select all 3 sections at a time (Cover sheet, Dimension & Paint report),
This option will provide Page numbers in chronologinal order for the selected sections such as
Page (1 of 2, 2 of 2) or Page (1 of 3, 2 of 3, 3 of 3)
12 If you have any problem, please contact TMEIC QAQC person or mail to [email protected] for further assistance.
2 of 9
2 Mill TC's / Lab TC's 1 2 Check for Completion of all Operations & Calibration Status of Instrument Used OK OK
4 Heat Treatment / Stress Relieving Reports NA 4 Cross verified for referred Standards / Data Sheets / CRW Check Sheets OK OK
5 Shot Blasting Reports NA 5 Check for any Previous Non Conformances pertaining to the component OK OK
6 Dimensional Inspection Report 1 6 Check for shot Blasting and Painting Requirements and Shade / RAL OK OK
7 CRW Checksheet NA 7 Check for Surface Finish (Ra Value) as per requirement OK OK
8 Inspection Clearance Report NA 8 Check for surface treatment (E.g., Galvanizingg, plating & Special Coating) NA NA
9 Others (Please Specify) NA 9 Check for Thread sizes, Final tapping of threads & Thread hole cleanliness OK OK
10 Paint Inspection report NA 10 Check for any Damages, Tool Marks, Dents, Metal Chips & Spatters are removed OK OK
Note: This is to certify that the above components / sub assembly manufactured
& complies with the requirements mentioned in the drawing/specification.
Actual Measured
Specified Lower Upper
Sl No Drg Zone Parameter/Characteristic
Dimension Tolerance Tolerance
Component Identfication No. UNIT Instrument Used Least Count Remarks
1 2 3 4 5
1 WIDTH 16 -0.11 -0.07 15.90 15.89 15.90 15.91 15.89 MM MICRO METER 0.01 OK
2 THICKNESS 10 -0.09 0 9.94 9.95 9.95 9.94 9.95 MM MICRO METER 0.01 OK
3 LENGTH 716 -0.5 0.5 716.00 716.40 716.20 716.50 716.00 MM VERNIER CALIPER 0.01 OK
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Inspected By Approved by
Format No:A-CRW-D7002-I
Supplier TMEIC
5 of 9
Actual Measured
Specified Lower Upper
Sl No Drg Zone Parameter/Characteristic
Dimension Tolerance Tolerance
Component Identfication No. UNIT Instrument Used Least Count Remarks
1 2 3 4 5
22
23
24
25
26
27
28
Inspected By Approved by
Format No:A-CRW-D7002-I
Supplier TMEIC
6 of 9
Actual Measured
Specified Lower Upper
Sl No Drg Zone Parameter/Characteristic
Dimension Tolerance Tolerance
Component Identfication No. UNIT Instrument Used Least Count Remarks
Inspected By Approved by
Format No:A-CRW-D7002-I
Supplier TMEIC
7 of 9
SURFACE PREPARATION
Method Date of working Temperature Humidity Surface Roughness, Rz Soluble salt Notes
□ Blast processing ℃ % μm mg/m2 Surface Roughness(Rz) ≥ 50 μm.
□ Acid wash ℃ % NA NA Soluble salt ≤ 20mg/m2 as NaCl
PAINTING PROCESS
Dry film thickness
Dry film thickness measured
Coat number Primer Paint make Primer Paint colour Date of working Temperature Humidity Signature
specified Min Max
1st Coat ℃ % μm μm
2nd Coat ℃ % μm μm
3rd Coat ℃ % μm μm
μm
4th Coat ℃ % μm μm
Total ℃ % μm μm
※(Painting thickness measurement points : Four points of measurement per 1㎡ area )
1 Blasted surface should be free from oil, rust, dust and according to ISO 8501-1 Sa 2.5
Ensure film thickness on the finish-painted surface shall be equal to or exceed the specified value in
2
the painting specification.
The painted surface shall be free of omission of painting, lack of hiding, separation, extreme
3
pinholes, wrinkles, runs, tears, orange peel surface, scratches, bruise and blisters
Supplier TMEIC
Revision history :
Revision Details Approved by
Shankar Prasad
A Initial issue
06.07.2016
Surface treatment & special requirements check point Shankar Prasad
B
added 20.10.2016
Shankar Prasad
C Cover sheet format changed
17.06.2017
Shankar Prasad
D Project number added & file size reduced.
15.09.2018
Shankar Prasad
E Paint inspection report added
11.05.2019
Balasubramaniam
14.10.2022 Vijay Kumar
14.10.2022
Balasubramaniam
22.07.2024
Chandrashekhar
Shettigar
22.07.2024