0% found this document useful (0 votes)
28 views2 pages

S15

SCHOOL S15
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views2 pages

S15

SCHOOL S15
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project name EDUCATIONAL BUILDINGS CONSTRUCTION IN RIYADH Project no.

RIYADH 111
Contractor name Al Bawani Co. Project Manager Eng / Shehzad khanzada
Consultant name AECOM Data Date 14-May-17
To the Engineer Report no. S13/701
School Name ABDULLAH IBNU-A'MER ELEMENTARY SCHOOL- BOYS School Code S13
Temperature Max : 34°C Min : 20°C Site Hand-Over Day 17-Feb-15
Weather Sunny Cloudy Rainy Humidity High Medium Low

Contractor's Manpower (including Subcontractors)* Plant/Equipment*

Status (Idle
Staff No. Direct Labor No Type Qty. Location
or Repair)
Projt. MGR. 1 Supervisor/Foreman 2 Excavator/ Poclain/ Excavator 0
Tech. Team 1 Precast Man 0 Shovel/ Loader/ Grader 0
Contract MGR. 1 Equipment Optr. 1 BOBCAT 1
Precast Manager 1 Carpenter 2 Dump Truck 0
Const. Manager 1 Welder 0 Roller/ Compactor 0
Project Control Team 1 Steelfixer 1 Portable Generator 0
QA/QC 1 E/M 7 Mobile Crane 0
Tech. Support 1 Mason 0 Tower Crane 0
Purch & Procurement 1 Painter Loabor 0 Pick up 0
Set. Manager 1 Plastering man 0 Water Tanker 1
Site Engineer 1 labor 8 Welding Machine 0
General Fork Lift
Safety/ HSE 1 0
Contractor JCB
Timekeeper 1 0
Electro Mechanical Engrs 1 Water Pump 2
Surveyor & Survayor Assistant 1 Bulldozer 0
Guard 2 Levelling Machine 0
Total station 0
Container 1
Water Tank 3
Portacabin 3
Temporary Genset 0

Sub Total/Main 17 21 4

Sub-contractors

Sub Total/Subcon 0 0 0

Grand Total 17 21 4

Activities and Tasks*


COMPLETED ACTIVITIES ON-GOING ACTIVITIES
Percentage
Type of Work Building Name Start Date Finish Date Type of Work Building Name Activity name Start Date Finish Date
Complete
Excavation Main Building - GF 8-Apr-15 18-Apr-15 Sub Structure Water Tank Bituminous Sheet Waterproofing for Water Tank 50.00% 29-Dec-16
Multi-purpose hall 13-Jul-16 18-Aug-16 Epoxy Ratengs of Waterproofing 95.00% 1-Mar-17
Electric Room 2-Jul-16 19-Jul-16 Boundary Wall Bituminous Waterproofing for Boundary Wall 90.00% 11-Jan-17
Canteen 7-Jun-16 24-Jul-16 Water Proofing Multi-purpose hall Foam Concrete 60.00% 4-Apr-17
Guard House 28-May-16 24-Jul-16 Gate Work Membrane Proofing 80.00% 2-May-17
Gate Work 25-Jul-16 2-Nov-16 Precast Boundary Wall Precast Concret Panels for Boundary Wall 90.00% 24-Dec-16
Site layout 17-Mar-15 24-Jul-16 Concrete Works Multi-purpose hall R.C Concrete for Stairs 85.00% 20-Mar-17
Water Tank 29-May-16 24-Jul-16 R.C Concrete for Ramp 85.00% 20-Mar-17
Boundary Wall 5-Jun-16 30-Jul-16 Plaster Cement Plastering 25.00% 1-May-17
Earth Works Site layout 1-Mar-15 24-Jul-16 Canteen Cement Plaster 50.00% 25-Mar-17
Sub Structure Main Building - GF 26-Aug-15 23-Jun-16 Guard House Cement Plaster 50.00% 26-Mar-17
Multi-purpose hall 25-Jul-16 7-Nov-16 Gate Work Cement Plaster 50.00% 26-Mar-17
Electric Room 27-Jul-16 25-Dec-16 Mechanical Main Building - GF Water Supply Pipes ( Cold & Hot ) & Testing 50.00% 14-Mar-17
Canteen 27-Jul-16 31-Oct-16 Drainage Pipes for Toilets & Testing 85.00% 15-Nov-16
Guard House 27-Jul-16 31-Oct-16 Floor Drain & Clean Out & Testing 80.00% 15-Nov-16
Gate Work 30-Jul-16 1-Jan-17 Electric Water Heaters & Testing 20.00% 8-May-17
Backfilling Main Building - GF 3-Jan-16 22-Jun-16 Pipe Fitting & Testing 60.00% 20-Feb-16
Multi-purpose hall 3-Sep-16 10-Nov-16 Fire Hose Cabinates 60.00% 20-Nov-16
Electric Room 23-Aug-16 28-Dec-16 HVAC Duct & Testing 90.00% 20-Jul-16
Canteen 8-Sep-16 26-Nov-16 Split Units & Testing 10.00% 8-May-17
Guard House 28-Aug-16 26-Nov-16 Main Building - FF Fire Extingushers 40.00% 6-Nov-16
Gate Work 3-Sep-16 7-Feb-17 Water Supply Pipes ( Cold & Hot ) & Testing 25.00% 19-Mar-17
Boundary Wall 4-Jan-17 11-Feb-17 Drainage Pipes for Toilets & Testing 85.00% 25-Sep-16
Slab On Grade Main Building - GF 22-Jun-16 9-Jul-16 Fire Hose Cabinates 60.00% 31-Oct-16
Multi-purpose hall 26-Sep-16 7-Nov-16 HVAC Duct & Testing 90.00% 23-Sep-16
Electric Room 15-Sep-16 1-Jan-17 Ventilation Fans & Testing 20.00% 31-Oct-16
Canteen 5-Oct-16 8-Dec-16 Split Units & Testing 40.00% 15-Oct-16
Guard House 20-Sep-16 8-Dec-16 Floor Drain & Clean Out & Testing 85.00% 22-Sep-16
Gate Work 25-Sep-16 10-Jan-17 Main Building - SF Split Units & Testing 25.00% 15-Oct-16
Precast Main Building - GF 24-Jan-16 29-Mar-16 HVAC Duct & Testing 60.00% 19-Sep-16
Main Building - FF 10-Feb-16 2-Apr-16 Drainage Pipes for Toilets & Testing 85.00% 20-Sep-16
Main Building - SF 10-Feb-16 9-Apr-16 Floor Drain & Clean Out & Testing 85.00% 22-Sep-16
Main Building - RF 15-Jun-16 14-Jul-16 Fire Extingushers 45.00% 7-Nov-16
Multi-purpose hall 28-Aug-16 12-Mar-17 Fire Hose Cabinates 45.00% 1-Nov-16
Electric Room 22-Sep-16 30-Jan-17 Main Building - RF Elevated Water Tanks & Testing 25.00% 22-Mar-17
Canteen 16-Oct-16 1-Feb-17 Roof Drain & Testing 85.00% 22-Sep-16
Guard House 1-Oct-16 22-Feb-17 Multi-purpose hall Fire Hose Cabinates 75.00% 27-Apr-17
Gate Work 12-Feb-17 28-Feb-17 Drainage Pipes for Toilets 90.00% 25-Oct-16
Block Work Main Building - GF 24-Jul-16 8-Aug-16 Roof Drain 80.00% 27-Apr-17
Main Building - FF 13-Jul-16 20-Sep-16 Split Units 10.00% 6-May-17
Main Building - SF 13-Jul-16 30-Oct-16 Electric Room Ventilation Fans 90.00% 26-Apr-17
Multi-purpose hall 19-Mar-17 29-Mar-17 Canteen Drainage Pipes for Toilets 80.00% 26-Oct-16
Canteen 5-Mar-17 7-Mar-17 Roof Drain 90.00% 19-Mar-17
Guard House 4-Mar-17 6-Mar-17 Split Unit 10.00% 6-May-17
Gate Work 5-Mar-17 7-Mar-17 Guard House Drainage Pipes for Toilets 90.00% 26-Oct-16
Water Tank 7-Mar-17 8-Mar-17 Roof Drain 70.00% 30-Apr-17
Plaster Main Building - GF 21-Nov-16 25-Feb-17 Windows Unit 10.00% 8-May-17
Main Building - FF 22-Aug-16 26-Feb-17 Gate Work Split Unit 10.00% 7-May-17

Page 1 of 2
Main Building - SF 15-Oct-16 25-Feb-17 Drainage Pipes for Toilets 80.00% 22-Feb-17
Water Tank 9-Mar-17 9-Mar-17 Roof Drain 90.00% 1-May-17
Doors Electric Room 7-Mar-17 9-Mar-17 Elevator Main Building - RF Install Steelwork Support For Elevator 50.00% 22-Mar-17
Windows Electric Room 7-Mar-17 9-Mar-17 Electric Traction Elevators 50.00% 15-Mar-17
Exposed Aggr. Main Building - RF 15-Jun-16 4-Jul-16 Electrical Main Building - GF Grounding System , UPS &Low-Voltage Electrical Power Conductors
80.00% and20-Sep-16
Cables
Electric Room 19-Mar-17 24-Mar-17 Lighting System Second Fix (Wires ) 90.00% 3-Sep-16
No R_Type Of Work Electric Room 7-Feb-17 26-Mar-17 Panelboards 70.00% 22-Feb-17
Wiring Devices Second Fix (Wires ) 92.00% 27-Apr-17
Fire Alarm Second Fix (Wires ) 92.00% 27-Apr-17
Data Communications System Second Fix (Wires ) 92.00% 27-Apr-17
IP Telephone System Second Fix (Wires ) 92.00% 27-Apr-17
Main Building - FF Lighting System Second Fix (Wires ) 92.00% 27-Apr-17
Panelboards 70.00% 22-Feb-17
Wiring Devices Second Fix (Wires ) 92.00% 27-Apr-17
Fire Alarm Second Fix (Wires ) 92.00% 27-Apr-17
Data Communications System Second Fix (Wires ) 92.00% 27-Apr-17
IP Telephone System Second Fix (Wires ) 92.00% 27-Apr-17
Grounding System , UPS &Low-Voltage Electrical Power Conductors
80.00% and21-Sep-16
Cables
Main Building - SF Lighting System Second Fix (Wires ) 92.00% 27-Apr-17
Panelboards 70.00% 22-Feb-17
Wiring Devices Second Fix (Wires ) 92.00% 27-Apr-17
Data Communications System Second Fix (Wires ) 92.00% 27-Apr-17
IP Telephone System Second Fix (Wires ) 92.00% 27-Apr-17
Fire Alarm Second Fix (Wires ) 92.00% 27-Apr-17
Grounding System , UPS &Low-Voltage Electrical Power Conductors
80.00% and14-Sep-16
Cables
Main Building - RF Panelboards 20.00% 15-Apr-17
Lighting Units (all building ) 50.00% 15-Apr-17
Multi-purpose hall Public Address System First Fix (Pipes ) 60.00% 5-May-17
IP Telephone System First Fix (Pipes ) 90.00% 29-Apr-17
Lighting System First Fix (Pipes ) 75.00% 29-Apr-17
Wiring Devices First Fix (Pipes ) 70.00% 30-Apr-17
Fire Alarm System First Fix (Pipes ) 35.00% 1-May-17
Canteen Panelboards 50.00% 15-Apr-17
Guard House Panelboards 50.00% 15-Apr-17
Gate Work Panelboards 50.00% 15-Apr-17
Doors Main Building - GF Hollow Metal Doors 50.00% 23-Mar-17
Main Building - FF Hollow Metal Doors 50.00% 28-Mar-17
Main Building - SF Hollow Metal Doors 50.00% 19-Mar-17
Windows Main Building - GF Aluminum Windows 50.00% 23-Mar-17
Main Building - FF Aluminum Windows 50.00% 23-Mar-17
Main Building - SF Aluminum Windows 53.00% 22-Mar-17
Space Frame Multi-purpose hall Install & Supply Space Frame 95.00% 22-Feb-17
Tiling Main Building - GF Granite Tiling 50.00% 20-Mar-17
Stairs Granite 75.00% 20-Mar-17
Porcelain Tiles 80.00% 21-Dec-16
Main Building - FF Granite Tiling 50.00% 22-Mar-17
Stairs Granite 70.00% 18-Mar-17
Porcelain Tiles 90.00% 9-Nov-16
Main Building - SF Granite Tiling 53.00% 22-Mar-17
Stairs Granite 70.00% 20-Mar-17
Porcelain Tiles 90.00% 21-Dec-16
Ceiling Main Building - GF Solid Gypsum Ceiling 80.00% 21-Dec-16
Main Building - FF Solid Gypsum Ceiling 90.00% 9-Nov-16
Main Building - SF Solid Gypsum Ceiling 90.00% 21-Dec-16
Paint Electric Room Final Coat Paint 40.00% 29-Mar-17
No R_Type Of Work Main Building - GF Porcelain Skirting 80.00% 21-Dec-16
Main Building - FF Granit Skirting 50.00% 20-Mar-17
Porcelain Skirting 90.00% 14-Nov-16
Main Building - SF Porcelain Skirting 90.00% 21-Dec-16

Materials delivered to Site*


Item Unit Qty. Approved submittal reference

Contractor's authorized signatory Engineer's authorized signatory


Name: Mohammad Anas Omar Al Hafi Name:
Signature: Signature:
Date: 14-May-17 Date: 14-May-17

* This form is to be used by the General Contractor to capture the above required information on a daily basis to report to the
Construction Supervisor (Engineer).

Page 2 of 2