Method of Statement for Access Control System

Table of Contents
1. Introduction
2. Scope of Work
3. Materials and Equipment
4. Work Methodology
4.1 Pre-Installation Activities
4.2 Installation Procedure
4.3 Post-Installation Activities
5. Safety Precautions
6. Quality Assurance
7. Responsibilities
8. References

1. Introduction
This document outlines the detailed methodology for the installation, testing, and
commissioning of the access control system. The objective is to ensure that all work is
performed efficiently, safely, and in compliance with the project requirements.

2. Scope of Work
The scope includes the installation of access control panels, card readers, magnetic locks,
push buttons, door sensors, and other related components. This method also covers system
integration, testing, commissioning, and user training.

3. Materials and Equipment


Key materials and equipment required for this project include:
- Access control panels
- Card readers (MIFARE)
- Magnetic locks and brackets
- Push buttons and break glass units
- Door sensors
- Cabling (CAT6, power cables, etc.)
- Drilling and mounting tools
- Multimeter and network tester

4. Work Methodology

4.1 Pre-Installation Activities


1. Review project drawings and specifications.
2. Conduct site survey and mark installation locations.
3. Verify the availability of all required materials and equipment.
4. Obtain necessary permits and approvals.
5. Conduct a pre-installation briefing with the team.

4.2 Installation Procedure


1. Mount access control panels securely in designated locations.
2. Install card readers at the appropriate height and positions near doors.
3. Fix magnetic locks and door sensors as per the alignment requirements.
4. Route and terminate cables neatly through conduits or cable trays.
5. Connect devices to the control panel and verify connections.
6. Power on the system and configure devices in the access control software.

4.3 Post-Installation Activities


1. Perform initial testing to verify functionality.
2. Conduct final commissioning with the client.
3. Provide training to the client on system operation.
4. Submit all documentation, including as-built drawings and test reports.

5. Safety Precautions
1. Ensure all personnel wear appropriate Personal Protective Equipment (PPE).
2. Follow electrical safety standards when working with power supplies.
3. Use ladders and scaffolding safely for high installations.
4. Keep the work area clean and free from tripping hazards.
5. Conduct risk assessments before starting work.

6. Quality Assurance
1. Follow manufacturer guidelines for equipment installation.
2. Conduct inspections at each stage of installation.
3. Verify system performance against client requirements.
4. Maintain detailed records of tests and inspections.

7. Responsibilities
1. Project Manager: Oversees the entire installation process.
2. Site Engineer: Supervises on-site activities and ensures compliance.
3. Technicians: Perform the installation and testing tasks.
4. Safety Officer: Ensures all safety protocols are followed.

8. References
1. Project specifications and drawings.
2. Manufacturer installation manuals.
3. Relevant safety and quality standards.