6. RA Hand Power Tools

Uploaded by

NIkhil Nawale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)

JOB TITLE : ELECTRICAL Hand & Power tools Drill Machine, Grinder Machine, Concrete Breaker Date
AREA REV:00
NAME OF THE CONTRACTOR : RPCPL NAME OF PROJECT :- Project: Raychem RPG P-Ltd - Chakan
CONTROLLED
ACTIVITY FINAL
Sly No HAZARDS/RISK CONSEQUENCES SEVERITY PROBABILITY RISK PRESENT CONTROL MEASURE SEVERITY PROBABILITY RISK RISK RESPONSIBILITY
(JOB STEPS IN SEQUENCE) ASSESSMENT
RATING

1. Proper induction training given to worker about electrical


wokr
2. only trained and licenses holder person deployed for electrical Site Manager,
Person working with electrical power
1 tools inadequate knoledge.
5 3 15 work and oprate power toos material. 3.Use double 2 2 4 Medium ACCEPTABLE Site Engineer,
insulated power tools do not use faulty & damaged power tool. Safety officer
4. Always use socket with "Earth Leakage Circuit Breaker."
1.Machinery,power tools can be damage 5. Use 3 core joint less cable with pin only.
Person may gat 2.Electric 6. Ensure earthing pin is connected inside the pin.
injury. Shock shock due to bad condition of power tool 7. Check cable for cut,broken , or cracked insulation
1. Un trained person use or faulty power cord. 8. Verify that all three wires tools & equipments are grounded.
cutting ,grainder,drill machine use for 9.only Site Manager,
2 work at site. inspected hand & power tools issued for work. 2 2 4 Medium ACCEPTABLE Site Engineer,
2. Use of damaged hand & power Safety officer
tools

1. Only trained and licenses holder electrical person deployed for


electrical work and operate power tools material.
2. ELCB/RCCB & MCB
will be provided to all panels at site.
3. Proper earthling shall be done to panels.
4. safety guard available to rotating parts of all
1. Cutting wheel may break due to machine. Gap between wheel & guard maintained 1/4
incorrect rpm and Hand & Body , eye 5.Test supply wires with multimeterfor live electrical
injury may be happen due to cutting supply. 6. Keep work areas clean & dry.
1.serous injury to wheel and flying particles/spatter. 2. 7. Correct size & double insulated 03 Q cable available with plug
1. use of cutting / grinding power toos person. 2. short circuit may be happened if cable top. avoid cable touch to sharp edge. 8. Isolate Site Manager,
without wheel guard. 2.
3 damage electric cable supply to power Property Damage. catch between wheel and cutting 5 3 15 the equipment from energy source. 9.Confirm 2 2 4 Medium ACCEPTABLE Site Engineer, Site
3. Fire structure. 3. disconnection of cable/wire from source end and machine end Supervisor also
tools.
explogen electric shock may expose to person due and use insulation tape to cover end terminals.
to damaged cable/without plug top. cable 10.Cut off electric supply positively before
may damaged due to hoisted tools by opening the door & close the door positively before energizing
cords. electric supply.
11.Cablet will no be allowed more than 03 joint In cable. cable
joint properly insulatedCablet will no be allowed more than 03
joint In cable. cable joint properly insulated.

1. Only trained and licenses holder electrical person deployed for


electrical work. 2.proper as
1. shock and short circuit, 2.electrical per stander nomes plate earthing should be done at site area. Site Manager ,
4 Improper earthing work, panel / Power tools material is burn due 5 3 15 3.Body earthing should be 2 2 4 Medium ACCEPTABLE Site Engineer,
to improper earthing connection provided for panel / power machine.

1.Electrical personel shall wear electrical shock resistant


handgloves when working with electrcal equipment.
2.only trained licenses workers will be allowed for work
activity.Treat every electrical wire as live wire.
3.All work shall be done under
supervision. 4.Correct size & double insulated 03
Q cable available with plug top. avoid cable touch to sharp edge.
serous injury to 1.electric shock may expose to person 5. Isolate the equipment from energy
person may be due to damaged cable/without plug top. source. 6.Test supply wires with multimeter for
shocked due to 2.cable may live electrical supply. 7.Confirm disconnection of
ImProper damage live electric cable
5 supply to power tools. use of faulty faulty electrical damaged due to hoisted tools by cords. 4 3 12 cable/wire from source end and machine end and use insulation 2 2 4 Medium ACCEPTABLE Site Engineer, Site Supervisor
cable / lose joint without insulated. cable 3.electric shock may tape to cover end terminals.
2. Flash hazard - expose to person, Cable can be burn due 8.Cut off electric supply positively before opening the door &
burn injury. to over / hi voltage electrical supply. close the door positively before energizing electric supply.
9.Cablet will no be allowed
more than 03 joint In cable. cable joint properly insulatedCablet
will no be allowed more than 03 joint In cable. cable joint
properly insulated.

1. All work requirde PPE's should be provided to worker Use


Person may be procedures ,drawings & other equipment as tools to do the jobs.
Power tools with out proper PPE's at shocked due to 1.electric shock may expose to person Use double insulated power tools Site Manager,
6 5 3 15 2 3 6 Medium ACCEPTABLE
work place faulty electric due to use of damage material . 2 Do not use faulty & damaged power tool. Site Engineer
equipment.

1. Make shour all cables should be layed on 01 mtr. Height from


1.electric shock may expose to person. 2. ground. 2. use Site Manager ,
cable may damaged 1.2 mtr. Cable stand for electrical cable laying. 3.
Electrical supply cable laying on ground cable can be damaged due to sharp edge, Site Engineer,Site
7 due to hoisted tools 5 2 10 Continuasly supervision on cable laying activity. 2 2 2 Low ACCEPTABLE
floor vehicle movement. cable can be damaged Supervisor also
by cords.
due to sharp edge, vehicle movement.

Prepared By Reviewed By Reviewed & Approved By : Client

Mr.Nikhil Nawale (EHS Dept.) Mr. Nilesh Bhagat (Civil Dept.)